Res 152-2007 10/16/2007 RESOLUTION N01 52-2007
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WICHITA
FALLS, TEXAS, AUTHORIZING THE CITY MANAGER TO EXECUTE AN
AGREEMENT WITH STALEY, BAKER, MONSON AND PSA
DEWBERRY TO COMPLETE A SPACE NEEDS ASSESSMENT FOR
THE CONSTRUCTION OF A NEW CITY HALL AND POLICE
DEPARTMENT; FINDING AND DETERMINING THAT THE MEETING AT
WHICH THIS RESOLUTION WAS PASSED WAS OPEN TO THE
PUBLIC AS REQUIRED BY LAW.
WHEREAS, City staff requested proposals from architects to perform a space
needs assessment for the replacement of city hall and police department; and
WHEREAS, Five proposals were received, and all respondents were
interviewed; and
WHEREAS, City staff is recommending the team of Staley, Baker, Monson and
PSA Dewberry to complete the space needs assessment.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
SECTION 1. The attached scope of services is hereby approved and the City
Manager is authorized to execute.
SECTION 2. It is hereby officially found and determined that the meeting at
which this resolution was passed was open to the public as required by law.
PASSED AND APPROVED this the 16 day of October, 2007.
MAYOR
ATTEST:
ity Clerk
�—�� . � � ( � a ..,)� .—,
�
�
- r��'
October 4, 2007
Facility Needs Assessment Study
Facility Needs Assessment Study Scope of Services
Replacement of Memorial Auditorium and Police Department
for the City of Wichita Falls, Texas
INTRODUCTION
A Facility Needs Assessment Study will be completed to analyze the current and future space needs for use
in developing alternates for a proposed City Hall and Police Headquarters facility(s). The tasks described
herein are intended to define the scope of work provided by the Staley Baker Monson / PSA-Dewberry Inc.
team to the City. Options will include preliminary planning concept drawings. The completed Facility
Needs Assessment Study Report document will provide information City leaders can use to make informed
decisions regarding the best options to meet current and future needs.
The scope and compensation is based on seven (7) work sessions with the City/Police staff, and one trip to
present the Final Report to City leaders and/or City Council. SBM/PSA-D will complete and deliver up to
fifteen (15) copies of a Facility Needs Assessment Study Final Report to the City of Wichita Falls, which
addresses the following tasks:
1. Proiect Initiation _
Before work begins, a Project Initiation meeting will be held to establish the foundation for the Needs
Assessment Study Project. The intent of this session will be to assemble key persons with the City
and the Police Department along with members of the SBM/PSA-D Team at the outset of the project
to (a) review overall project objectives; (b) discuss the work plan for the project; (c) review roles of
the participants; and (d) discuss the participants views on needs and opportunities the project will
respond to and (e) to set priorities. This session will be conducted as a precursor to the initial work
session with the Staff departments.
Deliverables: Written notes subsequent to meeting that identify roles and responsibilities of key
project team members, clarify the points(s) during the project work plan where public input is
facilitated and document the project priorities that will be the measures of project success.
2. Visits to Example Facilities
This work will entail the selection and visiting of several example facilities similar to those being
considered by the City. Approximately four (4) facilities for a joint visit by City / Police Staff and
SBM/PSA-D will be selected from a list of facilities suggested by PSA-D and the City. It is agreed
that SBM/PSA-D will be reimbursed by the City for actual costs of travel and lodging expenses for
trips to example facilities in addition to the base fee. In lieu of reimbursement, the City may elect to
prepay all agreed upon travel and lodging expenses with trips to example facilities for SBM/PSA-D
representatives.
Deliverables: Written report that records key findings as well as building features that are considered
by the review team to be advantages and disadvantages of each facility in comparison to the needs of
the City / Police.
Page 1 of 6
3. Buildin� Plannin� Criteria
The intent in this section is to look to the future and consider increases in City/Police staff and
functions associated with the building(s) that will be primary determinants of space needs.
SBM/PSA-D will evaluate City population projections, historical staff growth, calls for police
service, and department service roles/points. Current and future organization of each department and
the services or functions needed by each department will also be identified in order to make
projections of future needs.
Deliverables: Documentation of statistics that record historical and future projections of City
population and City/Police staff in each department to be accommodated by new facility planning.
This documentation will be included as part of the Final Report.
4. Existing Facility Utilization
SBM/PSA-D will analyze the existing City Hall (Memorial Auditorium) and Police Station in terms
of space allocation, functional adjacencies, and operational flows. We have learned that Staff will
view the new building through the eyes of the old facility. It is necessary for planners and designers
to clearly understand the existing facilities in order to plan for a successful new facility. We will
create new electronic drawing files of each building based on current drawings provided to us by the
City. The fee agreed upon is based on this fact. If complete drawings are not provided or require
extensive field verification to attain accuracy, then additional hours and fees will be required by
SBM/PSA-D.
Deliverables: Floor plan drawings of each facility with color-coded depiction of current space being
utilized by each department.
5. Space Needs Analvsis
SBM/PSA-D will create a department by department and room-by-room analysis of the
approximately 30 separate functional work areas / departments between the two existing buildings
and apply a proven net-to-gross square footage multiplier to determine the building size needed. City
Staff will provide the existing square footage of each of the estimated 30 work areas. We will gather
information to project space needs using surveys and follow up interviews with each workgroup and
a series of work sessions with City/Police Staff to review progress and come to a consensus regarding
space needs. We then consider the result in light of the overall project needs and in comparison with
available resources, opportunities for multi-use, and comparison with similar projects in other
communities. The intended result is a facility that consic�ers present and future needs. This task
utilizes adjacency diagrams as important tools in work sessions with building users. Diagrams
included in the Final Report document the consensus reached by building Users.
Deliverables: Spreadsheet file with line item for each space to be planned for along with space
description remarks that define intended use of spaces. Adjacency diagrams will be prepared that
depict functional relationships of spaces within each department, division or unit.
6. ParkinE Needs
Municipal buildings and public safety facilities are often very vehicle-intensive. There often is a
need to accommodate several types of vehicles that include employee vehicles, public visitors, City
vehicles, special-use vehicles, and others with various degrees of security protection. Vehicle
accommodations will consume large parts of the site. Accurate assessment of vehicle needs is an
important part of the planning process. SBM/PSA-D will determine and document parking needs.
Page 2 of 6
Deliverables: Spreadsheet file that shows parking needs for each department grouped together with
like vehicle-types in a format that is readily usable for preparing site planning drawings.
7. Preliminarv Conceptual Drawings
This work applies space needs, adjacency diagrams and optimized building circulation patterns to
create conceptual drawings depicting design alternatives. These floor plan diagrams allow consensus
regarding a successful concept solution to be reached in the context of client work sessions.
SBM/PSA-D will create one alternative concept design for the City Hall and the Police Headquarters
to jointly operate out of one facility on one site, and one alternative for the City Hall and Police
Headquarters to operate out of separate facilities. The concept drawings will illustrate the separate
components, as well as the footprint for the whole building(s). A follow-up design review will be
conducted with each of the 30 work areas. It is anticipated that follow-up design review will require
approximately one half of the time required to interview each work area initially. A final set of
concept drawings detailing the new building(s), both at separate component and full footprint levels
will be prepared.
If the findings of the Study reveal there is a compelling reason for the City Hall and Police
Headquarters to be in separate facilities on separate sites, the design team, at the City's direction will
prepare only one concept design and may reduce the compensation for this task.
Deliverables: Drawings to scale will be prepared that show adjacencies between departments in floor
plan view. These drawings are intended to indicate optimized adjacencies and building footprint
configuration in response to conditions of the candidate site(s).
8. Site Evaluation
In this task, the planning diagrams for the building will be configured for each of two candidate sites
to verify that functional and vehicular/pedestrian circulation needs can be met.. The resulting
planning diagrams are useful in confirming project scope and reaching consensus on a preferred site.
SBM/PSA-D will evaluate two sites from among multiple candidate sites identified by the City for
the new City Hall and Police Headquarters to be located. Evaluation of specific land parcels will also
be conducted by SBM/PSA-D, but will rely on technical data provided to SBM/PSA-D by the City as
to site legal boundaries, land topography, existing infrastructure, city and regional masterplans,
availability of utilities and acquisition cost discussions with property owners or realtors. The
resulting planning diagrams will be useful in confirming project scope, evaluating site plan '
alternatives and reaching consensus on a preferred concept.
It is understood that at the City's direction, it may be useful to evaluate a site or sites not currently
owned by the City. This evaluation effort and the resulting portion of the study will be held
confidential due to the fact that land acquisition may potentially be involved.
SBM/PSA-D may recommend additional investigative studies as part of the final site evaluation
process in the way of environmental assessments, site surveys, exploratory soil borings, etc.
SMB/PSA-D will assist the City in coordination of these studies, but the cost to conduct these types
of studies will be the responsibility of the City.
Deliverables: The report will include an aerial or map locating the sites, individual maps with
notations about site characteristics, site photographs and a description of site features and constraints.
A matrix of the various alternative sites will be used to compare the locations. Quantitative and
qualitative parameters will be compared.
Page 3 of 6
9. Preliminarv Proiect Cost of Construction and Proiect Bud�ets
A cost estimate based on space quantity, floor plan, conceptual drawings and site plan conceptual
drawings will be prepared for each alternative, to establish the construction and project budgets.
Deliverables: Square foot estimate for each facility that documents "construction" cost and all
anticipated "project" costs in a format that enables comparison of cost of various alternatives to be
readily made by the City.
10. Communitv Outreach
This project includes an opportunity to engage a variety of community stakeholders. As we
understand, the City Council and City Staff will be responsible for leading and facilitating this type
of public meeting forum if determined to be necessary. If the City wishes to enlist SBM / PSA-D to
assist in a public meeting(s) for preparation and presentation of materials and/or presentation of the
findings / recommendations of the Needs Assessment Report, these efforts can be handled as an
additional service. Likewise, if the City wishes to enlist SBM / PSA-D to prepare publicity materials
for financing / bond purposes, a scope-of-work and associated compensation can be submitted upon
request.
Page 4 of 6
SCHEDULE
SBM/PSA-D will endeavor to complete the Final Study and Report documents on or before April 15, 2008
based on an authorization to proceed being received before October 22, 2007. This will be accomplished
provided the City can respond with information, direction, and decisions needed in a timely manner.
COMPENSATION
The compensation for the Needs Assessment Study will be invoiced monthly to the City of Wichita Falls.
The City agrees to compensate Staley Baker Monson / PSA-Dewberry Inc. as follows:
Feasibility Study: A Lump Sum fee of $160,00.00,
for Tasks 1 through 9 as described above.
Additional Services: On an hourly basis per the attached SBM/PSA-D Hourly Rate Schedule,
SBM/PSA-D may provide additional services upon written request from
the Owner.
PSA-Dewberry Hourly Rate Schedule
Senior Architectural Planner $200
Project Manager $175
Structural Engineer $150
Mechanical Engineer $150
Electrical Engineer $150
Project Architect $130
Architect Intern $80
Support Staff $60
Reimbursable Expenses: Mileage and transportation for seven (7) visits/work sessions plus one
(1) trip for a presentation of the Final Report as identified in the attached
work plan with City representatives (exclusive of travel costs for "Visits
to Example Facilities under Task #2").
Printing associated with report drafts and the Final Report (15 copies).
Total Expenses: Not-to-Exceed 10 000.00
Page 5 of 6
We are pleased to have the opportunity to assist the City of Wichita Falls in this project.
The above conditions are hereby agreed to by:
City Wichita alls
City nager
Sta ker Mons n Staley ake o n
Gary Baker, IA M nty Mons n, AIA
Principal Principal, Project Manager
PSA-Dewberry Inc. PSA-Dewberry Inc.
�) �
Dean S. Roberts, AIA Don Wertzberger, AIA
Director of Public Safety Architecture Public Safety Designer, Project Ma ger
Date
Page 6 of 6
� - - -''
r,
Project Approach Work Plan
Goal Setting Session
(1/2 day) November 1, 2007
• Determine key stakeholders yyorksessions 1-2
• Identify roles ��$ N ,���
• Establish & prioritize project ry� 1—
goals December 18, 2007 Worksessions 3-4
• Establish project uhedule
and milestones (3-4 weeks) )anuary 1 —
PSA-Dewberry Team Provides January 31, 2008 Worksessions 5
• Focus on team building . preliminary SF needs
• Initial information exchange . p�elimina arkin needs (3-4 weeks) February t—
� �Y P 8 PSA-Dewberry Team Provides February 22, 2008
• Preliminary existing facilities • Preliminary SF Worksessions 6
PSA-Dewberry Team Provides plans • Preliminary parking needs pgA-Dewberry Team Provides (3•4 weeks) February 22 —
• Questionnaires (previously . Preliminary sWff projections • Prelimina ad'acencies
delivered) • Prelimina future ry� • Preliminary concept March 18, 2008
• Identif uestionnaire ry • Preliminary cost drawings Worksession 7
Y 9 organization chart • Draft sWff projections • parking layouts PSA-Dewberry Team Provides (1 day) March 25, 2008
recipients (previously • Staff interviews with 30+ �a
erformed) • Drah future organization • AdjacencieS/stacking • 2 Report Draft
P departmenWareas chart diagrams ■ Final SF • Report Final Drah Final Report Presentation
• Deliver project schedule • Coordination of faciliry tours . prelimina site ■ Parkin needs • Police and Ci (t da ) A ril 8, 2008
• Describe process �Y • Preliminary cost ■ Ad'acencieshtackin ry Y P
• Form ro'ect review evaluation/mnsideretions • Site plan(s) 1 6 Department Committee
P 1 City of Wichita Falls Prwides • Coordination of facilities ■ Preliminary cost • Review/Approval Group • Final Report
committee • Availabili for sraff ■ sr�ff projecr;ons
�Y City of WichiU Falls Provides ��� • Council one-on-one � City Council Presentation
meetin mterviews ■ Fumre organizaoon char[
S� • Availabiliry for staff • Follow-u interviews briefings • Final mpies of report
City of WichiU Falls Provides • Police and Ci De artment u p ■ Final mncept drawings delivered
• Ci o uladon-historical ry P meeUn�ncerviews • 1 draft of Report ■ Site evaluaoons
�Y P P Committee overview • Police and City Department • Follow-u desi review ■ Follow-u desi n rev�ew
and fumre ro ections � p g" P g
• Historical staff count- last 10 meeting Committee werview ■ Follow-up incerviews
• Review sessions with each meeting City of WichiG Falls Provides • Report presentation
years or more division/unit
• Review session with each • Availabili for staff meetin • Review/Apprrnal Group
• Historical Calls for Service ty �
• Site options identified for division/unit • Police and Ci De artment • Police and City Department Final Acceptance
stats last 10 years or more �aluation ty P
• Curtent Police and City staff • Review/Approval Group Committee overview Committee Group February 28, 2008
organization chart with Meeting meeting • Site Selection Review
quantities per position • Participation of selected • Review session with each • Concept Plan Review • Final acceptance by
• Provide input regarding group for example faciliry division/u�it • Cost Estimate Review written notification
future organization chart tours • Participation of selected
anticipated changes group for example facility City of WichiW Falls Provides
• Prrnide current inventory of tours • Police Department Committee
Police a�d City vehicles rnerview meetlng
• Provide current floor plans • Review session with each
of existing Police building(s) division/unit
and City offices • Review/Approval Group
meeting
. � � � �. � �
pproximately 24 weeks
City of Wichita Falls
Police DepartmentlCity Hall Space Needs Assessment
Proposed Work Plan
November December January February March April
Weeks 1 2 3 4 5 6 7 8 9 10 11 72 13 14 15 16 77 18 19 20 21 22 23 24
Work Sessions
Milestone Meetings
Initia Meeti g ft raft F � �
Planning Basics
November 6-9 TML �
Example Facility Visits
� ; � �� . , , ,
. .� .
Existing Facility Analysis Existing Facility Reuse
Space Needs Site Evaluation
�C ' ;
� Parking
�"' :,
Y
L
Q ' I = Preliminary Concept Drawinga
� ,
�, ,. ` Follow-up Design
Review
� �, Final Concept
�� �, ,s �
� 8 A
:�.; � , �::. ..:: .
y e COSt C08t COSt
Est Est Est.