Res 102-2017 8/1/2017Resolution No. 102-2017 Resolution authorizing a guaranteed maximum price of $887,000 in the Design -Build contract with Trinity Hughes Construction for the construction of the Sheppard Main Gate Bus Transfer Project WHEREAS, the City Council finds that the City staff has validly used the procedures described in the Texas Local Government Code to obtain design -build services for the construction of a new bus transfer facility located near the Sheppard Air Force Base Main Gate; and, WHEREAS, on February 7, 2017, the City Council awarded a contract to Trinity Hughes Construction to provide Design -Build services for construction of a new bus transfer facility located near the Sheppard Air Force Base Main Gate; and, WHEREAS, as part of that contract, Trinity Hughes Construction prepared a Guaranteed Maximum Price for the construction of the project; and, WHEREAS, the value of that construction contract is established at $887,000. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: A Guaranteed Maximum Price of $887,000 in the Design -Build Contract with Trinity Hughes Construction for the construction of the Sheppard Main Gate Bus Transfer Project is hereby approved, with such to be in a form approved by the City Attorney, and the City Manager is authorized to execute all necessary documents. PASSED AND APPROVED this the 1st day of August, 2017. ATTEST: City Clef TRINITYHUGHES CONSTRUCIION SAFB Bus Transfer Plaza lm� Issued July 21, 2017 piwti6�7- SAFB Bus Transfer Plaza Mr. John B rr s Director ofAviation, Traffic & Transportation City of Wichita Falls 100 Seymour Hwy. Wichita :Falls, .°I'...76301 Re: City of Wichita ells - SAFE Bus Transfer Plaza 'ubj� TRINITYHUGHES 10 N for the SAFE Bus Transfer Plaza. The information included in this document outlines the scope of work cost and time for this Package. Rodney Martin Chief Operations Officer Trinity Hughes Construction 1912 Loop 11 Wichita: Falls, TX 76306 0 H SAFB Bus Transfer Plaza Direct Cost • Division I — General Requirements • Division 2 — Existing Conditions/Site Work • Division 3 — Concrete • Division 5 — Metals • Division 7—Thermal and Moisture Protection • Division 9 — Finishes • Division 16 —Electrical Construction Management & Administration • General Conditions • Builders Risk Insurance • Payment & Performance Bond Indirect Cost • PLPD Insurance • Contractor's Contingency • Contractor's Fee • Design Fees G M P Total GMP Clarifications &Assumptions en C 0 Ns T R U C T 10 N 0= THIS CLARIFICATIONS AND ASSUMPTIONS DOCUMENT, TOGETHER WITH THE FOR CONSTRUCTION SET OF DRAWINGS, DEFINE THE GENERAL SCOPE OFTHE WORK FOR THE PROPOSED CITY Or WICHITA FALLS SAFB Bus TRANSFER PLAZA IN WICHITA FALLS, TEXAS FOR UTILIZING THE SERVICES OF TRINITY HUGHES CONSTRUCTION (DESIGN -BUILD CONTRACTOR). THIS CLARIFICATIONS AND ASSUMPTIONS DOCUMENT AS WELL AS THE OTHER SUPPORTING DOCUMENTS or TRINITY HUGHES CONSTRUCTION'S PROPOSAL ARE TO BE INCLUDED AS AN EXHIBIT AND TO BE MADE FULLY APART OF THE CONTRACT DOCUMENTS. ALL OTHER WORK IS SPECIFICALLY EXCLUDED FROM THIS GMP, QUANTITIES, MATERIAL SIZING, AND PRICING ARE BASED ON THE INFORMATION SHOWN ON DRAWINGS AND SPECIFICATIONS DATED JULY 5,2017. IF THE DESIGN IS CHANGED, THEN THIS WILL BE CONSIDERED A CHANGE IN CONDITION AND WILL BE ADDRESSED THROUGH THE CHANGE PROVISIONS OUTLINED IN THE CONTRACT. 3. THE PROJECT SCHEDULE IS BASED UPON THE DOCUMENT INCLUDED WITHIN THIS GMP. THE TIME AND COST RELATING TOTHIS GMP Rs MONTHS. Texns piwti6�7- SAFB Bus Transfer Plaza TRINITYHUGHES O IN R T R U C T10N 4. NO TESTING LAB SERVICES OR SPECIAL INSPECTIONS ARE INCLUDE[) AS DART OF THIS GIVIP. FOR ITEMS CALLED OUT IN THE SPECIFICATIONS AND/OR ADDENDA, ONLY COORDINATION, ACCESS AND SUPPORT WILL BE PROVIDED. I. GENERAL CLARIFICATIONS a) THIS GIMP INCLUDES NO ADDITIONAL MONIES FOR REPAIR OF EXISTING ROADWAY/DRIVES NOT DIRECTLY AFFECTED BY NEW CONSTRUCTION. ALL ROADWAYS ARE ASSUMED TO BE OF SUFFICIENTLY DESIGNED AND IN GOOD CONDITION TO ACCEPT THE TRAFFIC OF A CONSTRUCTION PROJECT OF THIS NATURE: THE TRAFFIC WILL INCLUDE BUT NOT LIMITED TO FULLY LOADED CONCRETE TRUCKS, FULLY LOADED DUMP TRUCKS AND OTHER ASSORTED CONSTRUCTION EQUIPMENT AND VEHICLE TRAFFIC. b} NO MONIES ARE INCLUDED IN THE GIVIP FOR UTILITY FEES. ALL UTILITY CONNECTION FEES PAID BY TRINITY HUGHES CONSTRUCTION WILL BE REIMBURSED AT A RATE OF 100% OF THE ACTUAL COST. C) THIS GIVIP EXCLUDES THE ALLOWANCE OF ANY OWNER'S CONTINGENCY, d) THIS GIVIP INCLUDESTHE FULLCOST OF BUILDERS RISK INSURANCE AND PAYMENT & PERFORMANCE BONDS BASED ON $887,000 TOTAL PROJECT COST. THESE COSTS WILL. BE ADJUSTED AS NECESSARY FOR INCREASED OR DECREASED TIME AND/CIR COST ASTHE GIVIP IS ALTERED BY CHANGE GIRDERS. 8) THE CITY OF WICHITA FALLS WILL WAIVE OR REIMBURSE ALL BUILDING PERMIT FEES. TRINITY HUGHES CONSTRUCTION WILL PROVIDE ALL DUMPSTERS AND COVERALL COSTS 9) ALL SANITARY SEWER, WATER AND STORM WATER SITE UTILITIES ARE EXCLUDED. h} ALL PARKING LOT/DRIVE AREA STRIPING AND PARKING BUMPERS ARE EXCLUDED. i) THIS GIVIP EXCLUDES ALL SIGNAGE. j) THIS GIVIP EXCLUDES ANY CHANGES OR SUGGESTIONS SET FORTH IN THE CIVIL SECTION OF THE PLAN REVIEW COMMENTS. It. ALLOWANCES 8j NoALLOWANCES ARE INCLUDED INTHIS GIMP. III. UNIT PRICES b) NO UNIT PRICES ARE INCLUDED IN THIS GIVIP piwti6�7- SAFB Bus Transfer Plaza TRINITYHUGHES TR U C T 10 N IV. ACCEPTED VALUE ENGINEERING AND SCOPE REDUCTION SUMMARY - R� TRINITY HUGHES<CONSTRUCTION'S GMP IS BASED ON THE FOLLOWING VALUE ENGINEERING AND SCOPE REDUCTIONS BEING INCORPORATED INTO THE CONTRACT DOCUMENTS. IF ANY OF THESE ITEMS ARE NOT INCORPORATED INTO THE CONTRACT DOCUMENTS, THEN THIS WILL BE CONSIDERED A CHANGE IN CONDITIONS AND TRINITY HUGHES CONSTRUCTION WILL BE ISSUED AN ADDITIVE CHANGE- GIRDER FOR THAT WORK. I}) PRIME AND PAINT ALL EXPOSED STRUCTURAL STEEL IN LIEU OF GALVANIZED STEEL C) REMOVE THE NORTHERN MOST CANOPY AND FOUNDATION FROM THIS SCOPE OF WORK d) USE ALTERNATE ELECTRICAL FIXTURE PACKAGE e) REDUCE LANDSCAPING/IRRIGATIONSCOPE CHANGE SOME WELDED CONNECTIONS TO BOLTED AND RECONFIGURE PERIMETER TUBE STEEL, ATTHE SAME TIME, STILL MAINTAINING THE STRUCTURAL CRITERIA AND DESIGN INTEGRITY g) REDUCE THE NUBER OF LIGHT POLES FROM 25 TO 12, CHANGE THE HEIGI4T FROM 16' TO 25' AND CHANGE THE FIXTURES FROM 66 WATTS TO 150 WATTS STILL MAINTAINING THE CURRENT FOOT CANDLES IN DESIGN h) REMOVE ALL MASONRY FORM CANOPY BASES AND RUB ALL EXPOSED CONCRETE 1912 Loop 11 Wichita:. Falls, TX 76306:. Project lame: SAFB Bus Transfer Plaza 940-761-5900 ProjectAddress: Burk Road, WF, Texas BadDate: 21-Jul-17 02:20 PM DESCRIPTION. BASE. BID ALT1 Paint in lieu of Galy. :ALT:2 Remove I Cann ALT3. RAB Fixture Pkg. ALT.4 Landscape Red. ALT5 Structural VE ALT6: Change Light Poles DIVISION 1 GENERAL REQUIREMENTS $141,500 DIVISION 2 SITE SET-UP &.SITEWORK $177,700 ($25,000) DIVISION 3-CONCRETE- $263,500 $12 500 $6,500) DIVISION 4 MASONRY $0: DIVISION 5:METALS. $270,600. {$26;700 $61.;000. $23,000 DIVISION 6':CARPENTRY $0. DIVISION 7 THERMAL &.MOISTURE $60,000 ($15,000 DIVISION 8.:DOORS :&.WINDOWS $0. DIVISION 9 FINISHES $0 $9,000 DIVISION 10.SPECIALTIES. $0. DIVISION:11 EQUIPMENT $0. DIVISION 12 FURNISHINGS $0: DIVISION 13SPECIAL CONSTRUCTION $0. DIVISION 14CONVEYING SYSTEMS : $0. DIVISION 1:5:PLUMBING& MECHANICAL. $0: DIVISION 1.6.:ELECTRICAL $81,600 $1.500).. $34,800 ($6,200. PROJECT SUBTOTALS :$994,900.00 $17,700.00. $90,000.00 $34,800,00. $25,0 ,00 $23000.00 $12,700,00) PROJECT ALLOWANCESICONTINGENCY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT LIABILITY. INSURANCE $5,969.40 $105.20 $540;00 $20880. $150.00 $138.00 $7520. PROJECT BUILDERS: RISK INSURANCE $6,218.13: ($110.63):. ($56Z50).. ($217.50). ($156.25). ($143.75) ($143.75. PROJECT BONDS $25,177..19 $ 7m92) $2,2775) $880.66 ,$632.6 $582.04 $323.00. CONTRACTORS.. FEE $82,581.18 ($1,46.9.18) ($7,470AI):. :($2,888.56) ($2,075.11) ($1,909. o) ($1,059.44) Total $1,114,845.89 ($19,833.93). ($100a850:47) ($38,995.51'.) ($28,014.02). ($25,772.90) ($14 302.38) Total With Alternates $887,076.68. GMP Amount $887,000.00 Allowances! Notes SAFB BUS TRANSFER PLAZA ENLARGED SITE PLAN BUS TRANSFER PLAZA VIEW 3