Res 087-2017 6/20/2017Resolution No. 87-2017
Resolution authorizing the City Manager to award bid and contract
for the 2017 Water Budget Utility Improvements Project to A& M
Construction and Utilities, Inc. in the amount of $1,038,657.45
WHEREAS, the City of Wichita Falls has advertised for bids for the 2017 Water
Budget Utility Improvements Project; and,
WHEREAS, it is found that the lowest responsible bidder is A& M Construction
and Utilities, Inc. who made a unit price bid with an estimated total of $1,038,657.45.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
The unit price bid for the 2017 Water Budget Utility Improvements Project is
awarded to A& M Construction and Utilities, Inc., in an estimated total amount of
$1,038,657.45, and the City Manager is authorized to execute a contract for the City
with said Contractor for the construction of such project.
PASSED AND APPROVED this the 20t" day of June, 2017.
ATTEST:
City Cy rk
2017 WATER BUDGET UTILITY IMPROVEMENTS PROJECT
C W F17-550-04
BID DATE: June 6, 2017
ORDER OF BIDS LOWEST TO HIGHEST
BASE BID
A&M Construction & Utilities, Inc. -
Rost+lett, TX
Bowles Construction Cu. -
Wichita Falls, TX
IPay tem
Description
Unit
Project Totals
Unit Price Total
Unit Price Total
107-TS
TRENCH SAFETY SYSTEM
LF
6,562.00
$ 0.50
$ 3,.281,00
$ 1,00
$ 6,562.00
3CM
SITE PREPARATION & MOBILIZATION (NOT TO EXCEED 5%)
LS
1.00
$ 20,000.00
$ 20,000,00
$ 50,000 00
$ 50,000.00
402-R
PAVEMENT REPAIR (ASPHALT/CONCRETE)
SY
3,353.00
$ 75,50
$ 253,151,50
$ 90.00
$ 301,770.00
501.15-6
INSTALL 6" WATERLINE AND FITTINGS {REGULAR)
HE
4,446.00
$ 47,10
$ 209,406,60
$ 50.00
$ 222,300.00
501.15-6-B
INSTALL 6" WATERLINE AND FITTINGS {RESTRAINED JOINT)
HE
30.00
$ 71.25
$ 2,137.50
$ 85.00
$ 2,550.00
501.15-8
INSTALLS" WATERLINE AND FITTINGS(REGULAR)
HE
2,086.00
$ 50,50
$ 105,343.00
$ 53,00
$ 110,558.00
501.15-12-C
INSTALL 12" STEEL CASING (MIN 0.25"}
HE
16.00
$ 102.00
$ 1,632,00
$ 735.00
$ 11,760.00
502.3-FH
INSTALL 5 1/4` FIRE HYDRANT ASSEMBLY
EA
12.00
$ 3,815..00
$ 45,780.00
$ 3,400.00
$ 40,800.00
502.3-RS
REMOVE & SALVAGE 5 1/4" FIRE HYDRANT ASSEMBLY
EA
3.00
$ 765..00
$ 2,295.OD
$ 900.00....
$ 2,700.00
502.5-6X6
INSTALL6%6"TAPPING SLEEVE
EA
8.00
$ 2,160.00
$ 17,280,00
$ 1,20000
$ 9,600.00
502.5-8X8
INSTALL 8"x8"TAPPING SLEEVE
EA
1.00
$ 2,425,00
$ 2,425.00
$ 1,400.00
$ 1,400.00
502.5-10XB
INSTALL 10" X 8" TAPPING SLEEVE
EA
1.00
$ 2,725,00
$ 2,725.00
$ 1,700.00
$ 1,700.00
502.5-12X6
INSTALL 12" X 6" TAPPING SLEEVE
EA
1.00
$ 2,750,00
$ 2,750,00
$ 1,800.00
$ 1,800.00
50Z5-12X8
INSTALL 12" X 8" TAPPING SLEEVE
EA
1.00
$ 2,895DO
$ 2,895.00
$ 2,000,00
$ 2,000.00
502.5-20x6
INSTALL20"x6"TAPPING SLEEVE
EA
1.00
$ 3,950.00
$ 3,950.00
$ 2,500.00
$ 2,500.00
502.5-TC-6
INSTALL 6" TRANSITION COUPLING
EA
8.00
$ 1,228.00
$ 9,824,00
$ 900.00
$ 7,200.00
502.E-6
INSTALL 6" GATE VALVE WITH BOX
EA
16.00
$ 918C0
$ 14,688.00
$ 800,00
$ 12,800.00
502.6-8
INSTALL 8" GATE VALVE WITH BOX
EA
4.00
$ 1,286 00
$ 5,144,00
$ 1,200 00
$ 4,800.00
502.E-20-13V
REMOVE VAULT & INSTALL 20" VALVE (BEVERLYj
LS
1.00
$ 27,10000
$ 27,100.00
$ 60,000,00
$ 60,()00.00
502.10-B
INSTALL 3/4" LONG SERVICES
EA
92.00
$ 1,195..50
$ 109,986:00
$ 1,200.00
$ 110,400.00
502.10-T
INSTALL 3/4" SHORT SERVICES
EA
76.00
$ 814.35
$ 61,890.60
$ 800.00
$ 60,800.00
502.10-B-1
INSTALL 1" LONG SERVICES
EA
2.00
$ 1,440,00
$ 2,880.OD
$ 1,400.00....
$ 2,800.00
502.10-T-1
INSTALL 1" SHORT SERVICES
EA
1.00
$ 1,070,00
$ 1,070,00
$ 1,140.00
$ 1,100.00
506.8-2
CUT AND PLUG EXIST 2" WATER MAIN
EA
24.00
$ 383,00
$ 9,192.OD
$ 1,100.00....
$ 26,400.00
506.8-6
CUT AND PLUG EXIST 6" WATER MAIN
EA
5.00
$ 1,262.00
$ 6,310,00
$ 1,300.00
$ 6,500.00
801
TEMPORARYBARRICADING AND TRAFFIC CONTROL
LS
1.00
$ 4,500,00
$ 4,500,00
$ 30,000.00
$ 30,000.00
Total Base Bid
$ 927,636.20
Total Base Bid
$ 1,090,800.00
A&M Construction & Utilities, Inc. -
Bowies Construction Co. -
Additve Alternate No.l - Midwestern Pkw y 244" Valve
Rowlett, TX
Wichita. Falls, TX
Project
Description Unit
Unit Price Total
Unit Price Total
IPay tem
Totals
502.6-24-M-ALT1
INSTALL 24"VALVE(MIDWESTERN) LS 1
$ 39,008.25
$ 39,008,25
$ 65,00000
$ 65,000.00
Total Add/Alt 1
1 $ 39,008,25
Total Add/Alt 1
1 $ 65,000.00
A&M Construction & Utilities, Inc. -
Bowles Constructions Co. -
Addtive Alternate No.2 - Jasper North 30"' Valve
Rowlett, TX
Wichita. Falls, TX
Pay
Project
Description UnitP
Unit Price Total
Unit Priee Total
Item
otals
502.6-30-JN-ALT2
REMOVE30" VALVE & VAULT (JASPER NORTH) LS1
$ 18,030.00
$ 18,030.00
$ 55,000.00
$ 55,000.00
Total Add/Alt 2
$ 18,030.00
Total Add/Alt 2
$ 55,000.00
A&M Construction & Utilities, Inc. -
Bowles Construction Cu. -
Additive Alternate No.3 -Jasper South 30"" Valve
Rowlett, TX
Wichita Falls, TX
Description Unit Project
Unit Price Total
Unit Price Total
Item
Totals
I
502.6-30-JS-ALT3
I REMOVE VAULT & INSTALL 30" VALVE (JASPER SOUTH) LS 1
$ 53,983.00
$ 53,983,00
$ 89,000 00
$ 85,000.00
Total Add/Alt 3
$ 53,983,00
Total Add/Alt 3
$ 85,0013.00
TOTAL- (BASE BID & ADD/ALTS 1, 2., & 3) 1 $ 1,038,657.:45 1 1 $ 1,295,800.00
2017 Water Budget Utility Improvements Project
Water Main Improvements
CWF-17-550-04
of
J
Elliot St.
L
W
Y I �
ELLIOTT
EAST ELLIOT
w
J
O;
Q
Y
O
O
Fairway Der.
SPEEDWAY AV2 F- --]
v
O Z LL.
� I U �
0w o
J
u �
EA1R`�A
-`-l� WOODROW AV
BE
2017 Water Budget Utility Improvements Project
Water Main Improvements
CWT-17-550-04
Ln
LJ
Arthur.
CAROL ANN Beverly Dr.]
S
BIRCH
CAROL A N Be
V)
> Elf
<
< LLJ
M
< XLd
(n
0
KESSLER CH
------- -- --- - -------------- ----
LL-
--J
z LJ
<
> a; wp O'
>LL
LT]
LLJ
Q W 1- 10
C2
z
Y
I
I
I
i
U.S. HWY 82 & 277` 5TH ST
Ii
W. Inwood St. 4
E. Inwood�SL
.o 0
o �
Dead End Main ; z Water Main
Improvements : 3:: Lli
r A Improvements
w
O
CD
ur
a_
2017 Water Budget Utility Improvements Project
CWF-17-550-04
BONNER ST'
Harding St.
HARDING ST j
Q
> a
V)Cn
w O �
J
O 0 0'
S U
- Z.-
MARCONI ST 1
Marconi St.
JUAREZ ST
Water Main Improvements
---J
L---J
L
MARC(7N1 S7 � --
[Juarez St.
................ ...............
>
JUAREZ ST >
cr
cn
Ld
o s o
> p
LJ
V)
WELCH ST
i
SULLIVAN ST'
o Dead End Main Improvements =�
2017 Water Budget Utility Improvements Project
Dead End Main Improvements
CWF-17-550-04
22ND ST
ILI
goad St.
23RD 23RD
2017 Water Budget Utility Improvements Project
Valve Improvements
CWF-17-550-04
25TH ST I
ly Fy
Ld Jasper St. N
LU
ODIN
COL
Jasper St. S
28TH ST
o
Midwestern P
HAMPSTEAD MIDWISTERN PKWY
LIJ
A
Ld
L<
CHERYL ST
<UzMJ
CAROL ANN ST
A-1
Beverly Dr.
o �o�
BIRCH ST