Res 087-2017 6/20/2017Resolution No. 87-2017 Resolution authorizing the City Manager to award bid and contract for the 2017 Water Budget Utility Improvements Project to A& M Construction and Utilities, Inc. in the amount of $1,038,657.45 WHEREAS, the City of Wichita Falls has advertised for bids for the 2017 Water Budget Utility Improvements Project; and, WHEREAS, it is found that the lowest responsible bidder is A& M Construction and Utilities, Inc. who made a unit price bid with an estimated total of $1,038,657.45. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The unit price bid for the 2017 Water Budget Utility Improvements Project is awarded to A& M Construction and Utilities, Inc., in an estimated total amount of $1,038,657.45, and the City Manager is authorized to execute a contract for the City with said Contractor for the construction of such project. PASSED AND APPROVED this the 20t" day of June, 2017. ATTEST: City Cy rk 2017 WATER BUDGET UTILITY IMPROVEMENTS PROJECT C W F17-550-04 BID DATE: June 6, 2017 ORDER OF BIDS LOWEST TO HIGHEST BASE BID A&M Construction & Utilities, Inc. - Rost+lett, TX Bowles Construction Cu. - Wichita Falls, TX IPay tem Description Unit Project Totals Unit Price Total Unit Price Total 107-TS TRENCH SAFETY SYSTEM LF 6,562.00 $ 0.50 $ 3,.281,00 $ 1,00 $ 6,562.00 3CM SITE PREPARATION & MOBILIZATION (NOT TO EXCEED 5%) LS 1.00 $ 20,000.00 $ 20,000,00 $ 50,000 00 $ 50,000.00 402-R PAVEMENT REPAIR (ASPHALT/CONCRETE) SY 3,353.00 $ 75,50 $ 253,151,50 $ 90.00 $ 301,770.00 501.15-6 INSTALL 6" WATERLINE AND FITTINGS {REGULAR) HE 4,446.00 $ 47,10 $ 209,406,60 $ 50.00 $ 222,300.00 501.15-6-B INSTALL 6" WATERLINE AND FITTINGS {RESTRAINED JOINT) HE 30.00 $ 71.25 $ 2,137.50 $ 85.00 $ 2,550.00 501.15-8 INSTALLS" WATERLINE AND FITTINGS(REGULAR) HE 2,086.00 $ 50,50 $ 105,343.00 $ 53,00 $ 110,558.00 501.15-12-C INSTALL 12" STEEL CASING (MIN 0.25"} HE 16.00 $ 102.00 $ 1,632,00 $ 735.00 $ 11,760.00 502.3-FH INSTALL 5 1/4` FIRE HYDRANT ASSEMBLY EA 12.00 $ 3,815..00 $ 45,780.00 $ 3,400.00 $ 40,800.00 502.3-RS REMOVE & SALVAGE 5 1/4" FIRE HYDRANT ASSEMBLY EA 3.00 $ 765..00 $ 2,295.OD $ 900.00.... $ 2,700.00 502.5-6X6 INSTALL6%6"TAPPING SLEEVE EA 8.00 $ 2,160.00 $ 17,280,00 $ 1,20000 $ 9,600.00 502.5-8X8 INSTALL 8"x8"TAPPING SLEEVE EA 1.00 $ 2,425,00 $ 2,425.00 $ 1,400.00 $ 1,400.00 502.5-10XB INSTALL 10" X 8" TAPPING SLEEVE EA 1.00 $ 2,725,00 $ 2,725.00 $ 1,700.00 $ 1,700.00 502.5-12X6 INSTALL 12" X 6" TAPPING SLEEVE EA 1.00 $ 2,750,00 $ 2,750,00 $ 1,800.00 $ 1,800.00 50Z5-12X8 INSTALL 12" X 8" TAPPING SLEEVE EA 1.00 $ 2,895DO $ 2,895.00 $ 2,000,00 $ 2,000.00 502.5-20x6 INSTALL20"x6"TAPPING SLEEVE EA 1.00 $ 3,950.00 $ 3,950.00 $ 2,500.00 $ 2,500.00 502.5-TC-6 INSTALL 6" TRANSITION COUPLING EA 8.00 $ 1,228.00 $ 9,824,00 $ 900.00 $ 7,200.00 502.E-6 INSTALL 6" GATE VALVE WITH BOX EA 16.00 $ 918C0 $ 14,688.00 $ 800,00 $ 12,800.00 502.6-8 INSTALL 8" GATE VALVE WITH BOX EA 4.00 $ 1,286 00 $ 5,144,00 $ 1,200 00 $ 4,800.00 502.E-20-13V REMOVE VAULT & INSTALL 20" VALVE (BEVERLYj LS 1.00 $ 27,10000 $ 27,100.00 $ 60,000,00 $ 60,()00.00 502.10-B INSTALL 3/4" LONG SERVICES EA 92.00 $ 1,195..50 $ 109,986:00 $ 1,200.00 $ 110,400.00 502.10-T INSTALL 3/4" SHORT SERVICES EA 76.00 $ 814.35 $ 61,890.60 $ 800.00 $ 60,800.00 502.10-B-1 INSTALL 1" LONG SERVICES EA 2.00 $ 1,440,00 $ 2,880.OD $ 1,400.00.... $ 2,800.00 502.10-T-1 INSTALL 1" SHORT SERVICES EA 1.00 $ 1,070,00 $ 1,070,00 $ 1,140.00 $ 1,100.00 506.8-2 CUT AND PLUG EXIST 2" WATER MAIN EA 24.00 $ 383,00 $ 9,192.OD $ 1,100.00.... $ 26,400.00 506.8-6 CUT AND PLUG EXIST 6" WATER MAIN EA 5.00 $ 1,262.00 $ 6,310,00 $ 1,300.00 $ 6,500.00 801 TEMPORARYBARRICADING AND TRAFFIC CONTROL LS 1.00 $ 4,500,00 $ 4,500,00 $ 30,000.00 $ 30,000.00 Total Base Bid $ 927,636.20 Total Base Bid $ 1,090,800.00 A&M Construction & Utilities, Inc. - Bowies Construction Co. - Additve Alternate No.l - Midwestern Pkw y 244" Valve Rowlett, TX Wichita. Falls, TX Project Description Unit Unit Price Total Unit Price Total IPay tem Totals 502.6-24-M-ALT1 INSTALL 24"VALVE(MIDWESTERN) LS 1 $ 39,008.25 $ 39,008,25 $ 65,00000 $ 65,000.00 Total Add/Alt 1 1 $ 39,008,25 Total Add/Alt 1 1 $ 65,000.00 A&M Construction & Utilities, Inc. - Bowles Constructions Co. - Addtive Alternate No.2 - Jasper North 30"' Valve Rowlett, TX Wichita. Falls, TX Pay Project Description UnitP Unit Price Total Unit Priee Total Item otals 502.6-30-JN-ALT2 REMOVE30" VALVE & VAULT (JASPER NORTH) LS1 $ 18,030.00 $ 18,030.00 $ 55,000.00 $ 55,000.00 Total Add/Alt 2 $ 18,030.00 Total Add/Alt 2 $ 55,000.00 A&M Construction & Utilities, Inc. - Bowles Construction Cu. - Additive Alternate No.3 -Jasper South 30"" Valve Rowlett, TX Wichita Falls, TX Description Unit Project Unit Price Total Unit Price Total Item Totals I 502.6-30-JS-ALT3 I REMOVE VAULT & INSTALL 30" VALVE (JASPER SOUTH) LS 1 $ 53,983.00 $ 53,983,00 $ 89,000 00 $ 85,000.00 Total Add/Alt 3 $ 53,983,00 Total Add/Alt 3 $ 85,0013.00 TOTAL- (BASE BID & ADD/ALTS 1, 2., & 3) 1 $ 1,038,657.:45 1 1 $ 1,295,800.00 2017 Water Budget Utility Improvements Project Water Main Improvements CWF-17-550-04 of J Elliot St. L W Y I � ELLIOTT EAST ELLIOT w J O; Q Y O O Fairway Der. SPEEDWAY AV2 F- --] v O Z LL. � I U � 0w o J u � EA1R`�A -`-l� WOODROW AV BE 2017 Water Budget Utility Improvements Project Water Main Improvements CWT-17-550-04 Ln LJ Arthur. CAROL ANN Beverly Dr.] S BIRCH CAROL A N Be V) > Elf < < LLJ M < XLd (n 0 KESSLER CH ------- -- --- - -------------- ---- LL- --J z LJ < > a; wp O' >LL LT] LLJ Q W 1- 10 C2 z Y I I I i U.S. HWY 82 & 277` 5TH ST Ii W. Inwood St. 4 E. Inwood�SL .o 0 o � Dead End Main ; z Water Main Improvements : 3:: Lli r A Improvements w O CD ur a_ 2017 Water Budget Utility Improvements Project CWF-17-550-04 BONNER ST' Harding St. HARDING ST j Q > a V)Cn w O � J O 0 0' S U - Z.- MARCONI ST 1 Marconi St. JUAREZ ST Water Main Improvements ---J L---J L MARC(7N1 S7 � -- [Juarez St. ................ ............... > JUAREZ ST > cr cn Ld o s o > p LJ V) WELCH ST i SULLIVAN ST' o Dead End Main Improvements =� 2017 Water Budget Utility Improvements Project Dead End Main Improvements CWF-17-550-04 22ND ST ILI goad St. 23RD 23RD 2017 Water Budget Utility Improvements Project Valve Improvements CWF-17-550-04 25TH ST I ly Fy Ld Jasper St. N LU ODIN COL Jasper St. S 28TH ST o Midwestern P HAMPSTEAD MIDWISTERN PKWY LIJ A Ld L< CHERYL ST <UzMJ CAROL ANN ST A-1 Beverly Dr. o �o� BIRCH ST