Loading...
Ord 079-2007 9/18/2007 ORDINANCE NO. 79-2007 ORDINANCE OF THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS; AMENDING SECTION 106-129 TO ADJUST FEES FOR SERVICES PROVIDED BY THE PUBLIC UTILITIES DIVISION; FINDING AND DETERMINING THAT THE MEETING AT WHICH THIS ORDINANCE WAS PASSED WAS OPEN TO THE PUBLIC AS REQUIRED BY LAW. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: SECTION 1: Section 106-129 pf the Code of Ordinances is hereby amended to read as follows: Section 106-129 (a) Water and Sewer Taps. The charge for standard and non-standard water taps and for standard and non-standard sewer taps will be as follows: (1) Standard Water Tap: A 5/8" or 1" water tap that does not exceed 15' of service line. Excavation is performed in soil using a backhoe and no additional construction (e.g. cutting of asphalt or concrete; underground boring or specialized construction to avoid other utility lines, etc.) is required. Size of Tap 5/8" $557.75 1 " $586.50 (2) Non-Standard Water Tap: A water tap that is larger than 1" or that includes a service line longer than 15'; requires underground boring, breaking of concrete or asphalt in street, alley or behind curb, or other non-standard construction techniques such as carrier pipe encasement or excavation by a means other than backhoe. Determined by job estimate using standard charges in Section 106-129 (b) (3) Standard Sewer Tap: A sewer tap installed on an existing sewer main line or manhole using standard equipment and materials where the property owner or agent has excavated and no additional preparation by the City is required, and where the excavation meets OSHA standards for trench/excavation safety. Tvpe Tap Pipe $103.90 Manhole $189.75 (4) Non-standard Sewer Tap: A sewer tap where non-standard equipment or materials are required; additional preparation by the City is required; or trench/excavation safety to meet OSHA standards must be achieved by the City. Determined by job estimate using standard charges in Section 106-129 (b) (b) Standard charqes for labor, equipment and materials. The following standard charges for labor, equipment and materials will be used to estimate non-standard water and sewer taps and other special utility- related services. Item Labor (Normal $19.55/hr duty hours) Labor (Overtime) $29.33/hr Materials Current cost City + 10% for Administration & Warehousing Backhoe/ditcher/ $55.20/hr (4-hour min.) front-end loader with operator Crew truck with $34.50/day (1/2 day min.) tools Sewer rod truck, or $69.00/hr (Normal duty jet cleaner with hours) $97.75/hr crew (Overtime) Air compressor $28.75/hr (2-hour min.) Boring machine Diameter in inches X $3.45 + $3.45 per linear ft. Tap machine (6" $172.50/job and smaller) Tap machine $316.25/job (larger than 6") Lighted arrow $115/day (1/2 day min.) board Type I barricade $9.20/day(1/2 day min.) Standard traffic $9.20/day (1/2 day min.) sign Standard traffic $8.63/day (1/2 day min.) cone Standard traffic $10.93/day (1/2 day min.) barrel Standard manhole $1,150 plus $115/ft over 5' (5' deep) Fire Hydrant $1,610 (includes valves) (installed) (c) Standard Charges for General Services: The price for the general utility- related services shown below will be as indicated: Service Meter size reduction Determine by job or increase estimate using standard charges in Section 106- 129 (b) Underground boring $414/job plus $6.90/ft without casing (up to for all over 60' 60')(for 1" and less) Underground boring $6.90/ft without casing (60' and over)(over 1" size, add cost of the pipe) Underground boring Boring cost plus with casing materials cost Shoring (if required $230.00/day for other services) Pavement repair for $414.00/job min. water tap $11.50 sq. ft. Concrete/asphalt cut $126.50/job min. behind curb ($11.50 sq. ft.) Unload septic waste $0.07 per gallon for from vacuum truck loads originating within at City Wastewater city limits; $0.14 per Treatment Plant gallon for loads originating outside city limits Laboratory testing of Commercial lab cost septic loads with plus 10% for excessive levels of administration and FOG, TSS, or BOD handling or with other constituents not acceptable at plant. Dewatering and N/A — refer customer to disposal of grease private Type 5 facility and/or grit waste at City Waste-water Treatment Plant Returned check (no $25.00 cut-off required) Cut-off/reconnect (no $17.25 plus deposit deposit) Remove/reinstall $57.50 plus deposit or meter (up to and Payment including 1 ") (no payment or deposit) Remove/reinstall Determine by job meter (larger than estimate using standard 1") (no payment or charges in Section 106- deposit) 129 (b) Padlock and saddle $32.20 damage Water-off lid $46.00 (customer damage) Cut-off/replacement $108.10 (customer damage) Meter damage $57.50 plus parts or (customer tampering) Meter Remove cut-off and $203.55 plug customer service line (install and remove cut-off and plug) Additional measures Determine by job to prevent illegal use estimate using standard of water charges in Section 106- 129 (b) Meter test (of $63.25 accurate meter) (up to 1 ") Meter test (of Determine by job accurate meter) estimate using standard (larger than 1") charges in Section 106- 129 (b) Reread and check $17.25 for leaks (reading accurate) Establish temporary $17.25 (includes water Account establishment of account, turn-on / turn-off of water) Deposit for Fire $764.75 plus billing Hydrant Meter Deposit Manual invoicing $19.55/hr, 1 hr. min. (minimum charge) Standard barricading $46.00/day (1/2 day of excava-tion: use Min.) of not more than 3 Type I barricades w/lights as necessary and/or plastic fencing, 3 standard traffic signs and 6 standard traffic cones. Includes 1 on- site check per day. Non-standard barri- Determined by job cading of excavation: estimate using standard an excavation that charges in Section 106- requires more than 3 129 (b) Type I barri- cades, 3 standard traffic signs or 6 standard traffic cones. Includes 1 on- site check per day. (d) Deleted (e) Temporarv Turn-off of Water Service at the Customer's Request: A fee of $17.25 is established for a customer-requested turn-off and turn-on of water service, unless the service call is to be made on an overtime basis in which case the fee shall be $23.00. The fee shall include both a turn-off and turn-on service call to the meter. None of the fee is refundable if only one service call is made. No charge shall be made if the customer is requesting the turn-off so that repairs can be made to the portion of the house line between the City-owned water meter and the customer-owned shut-off valve. The Director of Public Works, shall have the authority to temporarily waive this charge when extreme weather conditions require water to be turned off at the meters to prevent damages in buildings throughout the City. (fl Water and Sewer Line Extensions. The charge for standard and non- standard water line extensions and for standard and non-standard sewer line extensions will be as follows: (1) Standard Water Line Extension: A 6" or 8" water line extension where the excavation is perFormed in soil using a backhoe and no additional construction (e.g. cutting of asphalt or concrete; underground boring) is required. Includes one valve and one fire hydrant. Specialized installation requirements, main line taps, additional valves and fire hydrants will require additional charges. Size of Line 6" or 8" $24.15/ft (2) Non-Standard Water Line Extension: A water line extension that requires underground boring, cutting of concrete or asphalt in street, alley or behind curb, or other non-standard construction techniques such as carrier pipe encasement or excavation by a means other than backhoe. Determined by job estimate using standard charges in Section 106-129 (b) (3) Standard Sewer Line Extension: A 6" or 8" sewer line extension where the excavation is performed in soil using a backhoe and no additional construction (e.g. cutting of asphalt or concrete; underground boring) is required. Includes one clean out at the end of the main. Specialized installation requirements, trenches over five feet deep and manholes will require additional charges. Size of Line 6" or 8" $23.00/ft (4) Non-standard Sewer Line Extension: A sewer line extension that requires underground boring, cutting of concrete or asphalt, other non-standard construction techniques such as carrier pipe encasement or excavation by a means other than backhoe. Determined by job estimate using standard charges in Section 106-129 (b) SECTION 2 The above rates shall be effective during the first full billing cycle after October 1, 2007, and thereafter. SECTION 3 It is hereby officially found and determined that the meeting at which this ordinance was passed was open to the public as required by law. PASSED AND APPROVED this the 18 day of September, 2007. �__� MAYOR ATTEST: .--� � �� i City Clerk \