Loading...
Res 080-2017 6/6/2017Resolution No. 80-2017 Resolution approving the programs and expenditures of the Wichita Falls Economic Development Corporation (WFEDC) and amending the budget to include up to $497,500 for partial costs associated with parking lot additions on the MPEC grounds as part of the Hotel/Conference Center Project WHEREAS, Texas Local Gov't. Code § 501.073(a) provides "The corporation's authorizing unit will approve all programs and expenditures of a corporation and annually review any financial statements of the corporation"; and, WHEREAS, on May 18, 2017, the WFEDC approved the Project listed below and as stated in its agenda. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: 1. The Wichita Falls Economic Development Corporation's approval and funding of the following programs and expenditures as described below and in said corporation's agenda, are approved: Funding up to $497,500 for partial costs associated with parking lot additions on the grounds of the Multi -Purpose Events Center as part of the Hotel/Conference Center Project. 2. The current fiscal year budget of the WFEDC is amended to provide for the aforementioned expenditures and changes thereto. PASSED AND APPROVED this the 6th day of June, 2017. ATTEST: City bl6rk Not to Scale WICHITA FALLS ECONOMIC DEVELOPMENT CORPORATION AGENDA 18 May 2017 ITEM/SUBJECT: Downtown Conference Center Parking Lot Funding INITIATED BY: Jim Dockery ATTACHED: COMMENTARY: The City isasking4A to finance 50% of the estimated cost to construct the additional parking needs for the hotel/conference center. 4B has already agreed to fund the $85,000 for the design and that work is underway. It is anticipated project construction will be $995,000, but this does have $200,000 of contingency, so the actual cost may end up being less than the budget request of $497,500. Please keep in mind even though this is just a parking lot, it is necessary for the entire project which involves approximately $20 million of private investment, and an estimated economic impact of $74 million over the next 10 years. Much of that impact will be felt in the way of primary construction jobs over the first 16 months after construction begins. From Biggs; and Mathews: Russell As per your request, please find the following information & budget estimates for the two design/construction options for the proposed additions to the MPEC parking facility:- Proposed Parking Facility (DesiLyn/Construction Option-1) General, Project Description Design/construct; two new parking facilities with approximately 175-185 total parking spaces. The first parking facility (approximately 135 140 parking spaces) will be located along the west side of North Burnett Street, between 3rd Street and O Street. In additional, this parking facility shall be designed to accommodate future expansion (approximately 150-155 future parking spaces). The second parking facility (approximately 40-45 parking spaces) will be located near the intersection of Lamar Street and 2 dStreet. • Mobilization, Insurance, & Bonding'= $40,000.00 • General Site Preparation/Demolition= $25,000.00` • New 6" Reinforced Concrete Pavement (No. 4 Bars @ 18" OCEW or No.3 Bars @ 12"` OCEW) $555,000.00 o Note; Each parking facility shall be designed to surface drain to existing; drainage facilitiesand/or adjacent streets (public ROW). No Detention will be required by the CWF. • Typical Site Lighting, Irrigation, &Landscaping = $90,000.00, o Note: The proposed site lighting, irrigation, & landscaping for each of parking facility shall be similar to that of existing MPEC+parking sfacilities. • 3rd Street Paving &'Curb/Gutter Improvements =$20,000.00 • 4 h Street Paving & Curb/Gutter Improvements $50,000.00 • Burnett Street Paving & Curb/Gutter Improvements S15,000.00 Total Estimated Construction Cost= $795,000.00 Contingencies = 5200,000.00 Engineering Fee = $85, 000.00 Total Budget Estimate= $1,080,000.00 CONCLUSION: The Downtown Conference Center is the cornerstone of a renewed downtown revitalization effort and will allow for new and larger conferences to come to Wichita Falls. The funding of the additional parking facilities by the 4a and 4b Boards is imperative if this project is to move forward.