Loading...
Res 051-2008 4/15/2008 RESOLUTION NO. 51 - 2008 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, TO APPROVE CHANGE ORDERS NO. 2 AND NO. 3 TO A CONTRACT WITH GE MICROWAVE DATA SYSTEMS, RFP #6-08 IN THE AMOUNT OF ($25,833); FINDING AND DETERMINING THAT THE MEETING AT WHICH THE RESOLUTION WAS PASSED WAS OPEN TO THE PUBLIC AS REQUIRED BY LAW. WHEREAS, the City of Wichita Falls entered a contract with GE MDS, LLC with an contract amount of $3,611,203.40; and WHEREAS, Change Order No. 1 was approved which reduced the contract amount by $18,653.00; and WHEREAS, Change Order No. 2 would reduce the contract amount by an additional $30,167.00; and WHEREAS, Change Order No. 3 would add $56,000.00 to the contract bringing the total revised contract amount to $3,618,383.40; and WHEREAS, the City staff has reviewed all aspects of these Change Orders and recommends approval. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: SECTION 1. Change Order No. 2 and Change Order No. 3 For The Public Safety Mobile Data Wireless Infrastructure RFP #6-08 are hereby approved and the City Manager is authorized to execute Change Orders No. 2 and No. 3. SECTION 2. It is hereby officially found and determined that the meeting at which this resolution was passed was open to the public as required by law. PASSED AND APPROVED this, the 15th day of April, 2008. MAYOR ATTEST: � City Clerk • , ��� Ta Darton Leiker, CitY Manager Jim Dodcery. Fnarx:e Diredor Mait 8enoi� Assistarrt City Manager �� Bi�ke Jureoek, Inturmation Sysbems Administrator Dshe April 7, 2008 Rse GE MDS Change Order #2 and #3 Atiachad bo ttris memo are 2 additional Change Orders for tl�e GE MDS contract Bebw you wfll find a summary tl►at indudes approved Change Order #1 and Charige OrdBrs i� and �f3 tliat need approval. Chan Ord�r� DescN n Chan otCost 1 A - Add swibches and La c�st reduaion. 18 653 2 FJiminatitm of Redund8nt Bsse Stations 8 RetnoGe mouM MAICOM rad'a cables. (530,167) 3 Mono En ' r d�an and aoil sam modifications. i56 000 7otal ot Cha Orde�s sT180 Cl�arpo Order �2 Nem �t —(538,142) We have determined that the best soluUon for redundancy is stoddrg limi6ed spare equipment for the Base StatlonslAooass Points rather tlian purd�siny hot spares b be ir�talled art �ch site. If equipment faAs at a Base S�Uon and needs to be replaced wRh spares, the wireless network wIN contlnue to functlon bec�use of the Self Fieatlng Rirg de,aign that is betr� deployed. The outa9e will only aftect the coverape aree where the B�e Staftion is located. Item #2 and #3 — 37,875 The botal number of vehides that vNll require the remote radio control head cabie Tor the NWICOM rad'a's were off by 11 units in tlie original proposal. The original couM was oif by 11, these are not ad�itional vehides. This Change Order Hn11 reduce the overaN contract bY (530.187). Change Ordsr *1 I�em #1 and #2 — These iterr�s aro basicaAy the same hawever the oost of the monopole �stalladon varies sort�e because of the amount of equipment being p�iced on them. There are 2 r�sor�s for the incr�se of fhe monopoies instaYaGon cost. FiBt is that the City requires a minimum wind speed load of 90 MPH �or any new tower oonstruction and the monopoles that GE MDS had in the oriDinal proposal w�er�e only rated for 80 MPN. Secor�dly, a Core Sarr�ple � d C�e so� at 2 of the sfte� is not typical of tltia rogion and will roqui�e a daeper core to be dug, and more corxxet�e will be u�ed b meet tt�e Monopole manufac�urors engin�g spec�icadons. Additlonally this Charge Order will extend the projed 21 days becau�e of fhe delay in getting the cae sdl aample resulta and engineering chanyes Uo the monopoles. This extension should not af�ect any major mib s6one completion dates. This Change Order w�ll increase the overall contrad by 358,000. The ►esult of � 3 Changes Orders wiA irx�e ttie Gotal contract (ram 53.612.203.40 to 53.618,383.40. a diiference of $7,180.00. If you would like b discusa thia in more deta� please c�ontect me at 7440. Thank ou for your con ' Ju d�ek Infom�atio� Systsms Adminisb�tor cmr oF wicHrrA Fa.i..s, �rExAS 2 CONTRACT CHAN(iE ORDER FORM ����$ 30,167.00 Mobfle Data Computer S tem ! RFP# 06-08 TO: GE MDS, LLC , Cas Change Ordx, a(ter approval by the Owne►, wfN be your (ConCeCtw) authorfty to make the followhp chanpes In the watc u�Wer your contract: 1.Redundanl Bss� StatloNAoceas Pokris Lhe Y 59 - Chanpe b�tal i 38.142.00 i - S (38,142.00) From 13 !0 0 2.f�rige GusMity lins 17C hom 1 BS to 178 i - S 7.150.00 S 7,150.00 Remote ra0'io Controi t�sed cebb MA/COM 9.Chanpe �uarrtlty linb 35b from 165 !0 178 S - S 825.00 S 825.00 Ir�tatlon MA/COM aontrol hoad cade a. s - s - s - s. s - s - s - e. S - i - S - TOTAL S 38,142.00 S 7,975.00 S (30.167.00 S 3,611,203.40 i (30.187.00 i 3,692,560.40 3 3.582,363.40 Trie comPktlon tlme under your conbact wNl be extendeC by _0_ daya beCeuse of CNS chanpe adar makirp 1M reviaed completion date -- Approv er: Axepted By Contractor: Recommended By ArchlEng: � (M appucabie) By: ey. By: Title: � rla Title: Title: Date: '�/ / � � Date: Date: CITY OF WICHRA FALLS, TEXAS 3 CONTRACT CHANGE ORDER FORM 4/2/2008 $ 56�000.00 Mobile Data Com ter S tem ! RFP# 06-08 TO _GE MDS, LLC , thia Chanpe Ordx, after approvd by the Owr�er, wiN be your (�) autliariy to make ths foNoMAng chanpes in the wak under your ooMract: 1. 4.9 CiF� Backhaul inst. indudas all al0es. herdwxe, monopoka S - S 33,800.00 S �.�.� Lina 55b Sites Wata Tu�c 5, Bonrry West, Firo S�tion 8 2. 11 Gdiz BackM�1 N'ist, indudss aN aftes. Mrdw�re. monopoles S - i 22,400.00 S 22.400.00 Une SSd Sites Fire Sfation 3. Sunnyside a. s - s - s - a. s • s - s - a. s - a - s - e. s - s - s - TOTAL S - i �.�.� S 58.000.00 S 3,811,203.�0 S 58.000.00 S 3,582,383.40 = 3,818,383.40 The competlon time undar your contraa wlN be extendsd oy _2t_ days becauss ot Qrs change order maklnp fhe revlsed compbfion date 02-21, 2008. Approved B . Accepted By Contractor: Recommended By ArctUEng: (if eroplicede) By. ' By: By. Title: / , � C� Title: Title: Date: L � ��.� "DO Date: Date: