Ord 44-2009 7/21/2009 •,
,. .�
ORDINANCE NO. '1`�" �O�
Ordinance Of The City Council Of The City Of Wichita Falls, Texas,
("City") Approving A Negotiated Resolution Between The Atmos
Cities Steering Committee ("ACSC" Or "Steering Committee") And
Atmos Energy Corp., Mid-Tex Division ("Atmos Mid-Tex" Or
"Company") Regarding The Company's Rate Review Mechanism
Filing In All Cities Exercising Original Jurisdiction; Declaring
Existing Rates To Be Unreasonable; Requiring The Company To
Reimburse Cities' Reasonable Ratemaking Expenses; Adopting
Tariffs That Reflect Rate Adjustments Consistent With The
Negotiated Settlement And Finding The Rates To Be Set By The
Attached Tariffs To Be Just And Reasonable; Approving Atmos'
Proof Of Revenues; Adopting A Savings Clause; Determining That
This Ordinance Was Passed In Accordance With The Requirements
Of The Texas Open Meetings Act; Declaring An Effective Date; And
Requiring Delivery Of This Ordinance To The Company And The
Steering Committee's Legal Counsel.
WHEREAS, the City of Wichita Falls, Texas ("City") is a gas utility customer of
Atmos Energy Corp., Mid-Tex Division ("Atmos Mid-Tex" or "Company"), and a
regulatory authority with an interest in the rates and charges of Atmos Mid-Tex; and
WHEREAS, the City is a member of the Atmos Cities Steering Committee
("ACSC" or "Steering Committee"), a coalition of more than 150 similarly situated cities
served by Atmos Mid-Tex that have joined together to facilitate the review and response
to natural gas issues affecting rates charged in the Atmos Mid-Tex service area (such
participating cities are referred to herein as "ACSC Cities"); and
WHEREAS, pursuant to the terms of the agreement settling the Company's 2007
Statement of Intent to increase rates, ACSC Cities and the Company worked
collaboratively to develop the Rate Review Mechanism ("RRM") tariff that allows for an
expedited rate review process controlled in a three year experiment by ACSC Cities as
a substitute to the current GRIP process instituted by the Legislature; and
WHEREAS, the City took action in 2008 to approve a Settlement Agreement with
Atmos Mid-Tex resolving the Company's 2007 rate case and authorizing the RRM
Tariff; and
WHEREAS, the 2008 Settlement Agreement contemplates reimbursement of
ACSC Cities' reasonable expenses associated with RRM applications; and
WHEREAS, on or about March 6, 2009, Atmos Mid-Tex filed with the City its
second application pursuant to the RRM tariff to increase natural gas rates by
approximately $20.2 million, such increase to be effective in every municipality that has
adopted the RRM tariff within its Mid-Tex Division; and
,`. .� ,
WHEREAS, ACSC Cities coordinated its review of Atmos' RRM filing and
designated a Settlement Committee made up of ACSC representatives and assisted by
ACSC attorneys and consultants to resolve issues identified by ACSC in the Company's
RRM filing; and
WHEREAS, the Company has filed evidence that existing rates are
unreasonable and should be changed; and
WHEREAS, independent analysis by ACSC's rate expert concluded that Atmos
Mid-Tex is able to justify a slight rate increase over current rates; and
WHEREAS, the Steering Committee has advocated in other proceedings that
Atmos Mid-Tex hedge natural gas futures in order to mitigate the volatility of natural gas
prices, which are a flow through to customers; and
WHEREAS, the ACSC Executive Committee, as well as ACSC lawyers and
consultants, recommend that ACSC members approve the attached rate tariffs
("Attachment A" to this Ordinance), which will increase the Company's revenue
requirement by $2.6 million; and
WHEREAS, the attached tariffs implementing new rates and Atmos' Proof of
Revenues ("Attachment B" to this Ordinance) are consistent with the negotiated
resolution reached by ACSC Cities and are just, reasonable, and in the public interest;
and
WHEREAS, it is the intention of the parties that if the City determines any rates,
revenues, terms and conditions, or benefits resulting from a Final Order or subsequent
negotiated settlement approved in any proceeding addressing the issues raised in the
Company's RRM filing would be more beneficial to the City than the terms of the
attached tariff, then the more favorable rates, revenues, terms and conditions, or
benefits shall additionally accrue to the City; and
WHEREAS, the negotiated resolution of the Company's RRM filing and the
resulting rates are, as a whole, in the public interest.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
1. The findings set forth in this Ordinance are hereby in all things approved.
2. The City Council finds that the existing rates for natural gas service provided
by Atmos Mid-Tex are unreasonable and new tariffs and Atmos' Proof of Revenues,
which are attached hereto and incorporated herein as Attachments A and B, are just
and reasonable and are hereby adopted.
3. Atmos Mid-Tex shall reimburse the reasonable rate making expenses of the
ACSC Cities in processing the Company's rate application.
,' � ,
6. If any one or more sections or clauses of this Ordinance is adjudged to be
unconstitutional or invalid, such judgment shall not affect, impair or invalidate the
remaining provisions of this Ordinance and the remaining provisions of the Ordinance
shall be interpreted as if the offending section or clause never existed.
7. If the City determines any rates, revenues, terms and conditions, or benefits
resulting from a Final Order or subsequent negotiated settlement approved in any
proceeding addressing the issues raised in the Company's RRM filing would be more
beneficial to the City than the terms of the attached tariff, then the more favorable rates,
revenues, terms and conditions, or benefits shall additionally accrue to the City.
8. The Company's Gas Cost Recovery tariff is revised to permit recovery of
certain costs associated with hedging natural gas futures.
9. This Ordinance shall become effective from and after its passage with rates
authorized by attached Tariffs to be effective for bills rendered on or after August 1,
2009.
10. A copy of this Ordinance shall be sent to Atmos Mid-Tex, care of David Park,
Vice President Rates and Regulatory Affairs, at Atmos Energy Corporation, 5420 LBJ
Freeway, Suite 1800, Dallas, Texas 75240, and to Geoffrey Gay, General Counsel to
ACSC, at Lloyd Gosselink Rochelle & Townsend, P.C., P.O. Box 1725, Austin, Texas
78767-1725.
PASSED AND APPROVED this the 21 day of y, 09.
;
i
i
i
�
A Y O R PRO TEM
ATTEST:
City Clerk
Attachment A
ATM03 ENERGY CORPORATION
MID-TEX DMSION REVISION NO: Q
RATE SCHEDULE: R— RESIDENTIAL SALES
APPLICABLE TO: All Cities designated as "Group A" on the Citles Ssrved List
EFFECTNE DATE: Bills Renderod on or aiter 08101l2009 PAGE: 29
Applicatlon
Applicable to Residential Customers for all natural gas provided at one Point of Delivery a�d measured
through one meter.
Type of Servica
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customers monthly bill will be calculated by adding the following Customer and Mcf charges to the
amounts due under the riders listed below:
Ghuge Ant9urrt .
Customer Charge per Bill $ 7.00 per month
Commodiry Charge — All Mcf $2.2707 per Mcf
Gas Cost Recovery: Plus an amount for gas costs and ups7eam transportation costs calculated
in accordance with Part (a) and Part {b), respectivety, of Rider GCR.
Weather Nortnalization Adjustment Plus or Minus an amount for weather normalizafwn
calculated in accordance with Rider WNA.
Rate Review Mechanism: Plus or Minus an amount for rates as ca�ulated in accordance with
Rider RRM.
Franchise Fee Adjustment Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
Issued By: David J. Park Vice President, Rates and Regulatory Affairs
Date Issued:
'. �' .
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DMSION REVISION NO: 0
RATE SCHEDULE: C— COMMERCIAL SALES
APPLICABLE T0: All Cities designated as "Group A" on the Citiss Served List
EFFECTNE DATE: Bilis Rendered on or after 08/01/2009 PAGE: 30
Application
Applicable to Commerciai Customers for all natural gas provided at one Point of Delivery and measured
through one meter and to Industrial Customers with an average annual usage of less than 3,000 Mcf.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements befinreen Company and Customer may be required prior to '
service being fumished.
Monthly Rate
Customer's rrwnthly bil� will be calculated by adding the following Customer and Mcf charges to the
amounts due under the r�ders listed below:
Cha�t A+naunt
Customer Charge per Bill $13.50 per month
Commodity Charge - All Mcf $ 0.9877 per AAcf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated
in accordance with Part (a) and Part (b), respecGvely, of Rider GCR.
Weather Normalization Adjustment: Plus or Minus an amount for weather normalization
calculated in accordance with Rider WNA.
Rate Review Mechanism: Plus or Minus an amount for rates as calculated in accordance with
Rider RRM.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tau Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
Issued By: David J. Park Vice President, Rates and Regulatory Affairs
Date Issusd:
Attachment A
ATMOS ENERGY CORPORATION
MID TEX DNISION REVISION NO: 0
RATE SCHEDULE: I— INDUSTRIAL SALES
APPLICABLE TO: All Cittes destgnated as "Group A" on the C�ies Served List
EFFECTNE DATE: Bills Rendered on or after 08/01/2009 PAGE: 31
Appiicatlon
Applicable to Industriai Customers wfth a maximum daily usage (MDU) of less than 3,500 MMBtu per day
for all natural gas provided at one Point of Delivery and measured through one meter. Service for
Industrial Customers with an MDU equal to or greater than 3,500 MMBtu per day will be provided at
Company's sole option and will require special contract arrangements between Company and Customer.
Type of Service
Where service of the rype desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
seroice being fumished.
Monthly Rate
Customers monthly bill will be calculated by adding the following Customer and MMBtu charges to the
amounts due under the r'�ders listed below:
Cha�e Amount
Customer Charge per Meter $ 425.00 per month
First 0 MMBtu to 1,500 MMBtu $ 0.2583 per MMStu
Next 3,500 MMBtu $ 0.1884 per MMBtu
All MMBtu over 5,000 MMBtu $ 0.0404 per MMBtu
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs ca�ulated
in accordance with Part (a) and Part (b), respectively, of Rider GCR.
Rate Review Mechanism: Plus or Minus an amount for rates as calculated in accordance with
Rider RRM.
Franchise Fee Adjustment Plus an amount for franchise fees calculated in accordanCe with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Curtailment Overpull Fee
Upon notification by Company of an event of curtaifinent or interruption of Customers deliveries,
Customer will, for each MMBtu delivered in excess of the stated level of curtailment or inteRUption, pay
Company 200°k of the midpoint price for the Katy point listed in Platts Gas Daily published for the
appl'�cable Gas Day in the table entitled "Daily Price Survey.'
Issued By: David J. Park V'ice President, Rates and Regulatory Affairs
Date Issued:
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DMSION REVISION NO: 0
RATE SCHEDULE: I— INDUSTRiAL SALE3
APPLICABLE TO: All C�ies designated as "Group A" on the Cities Served List
EFFECTIVE DATE: Btlls Rendered on or aiter 08/01/2008 PAGE: 32
Replscement Index
In the event the "midpoinY or 'common' price for the Katy point listed in Platts Gas Daily in the table
entitled `Daily Price Survey" is no longer pubtished, Company will ca�ulate the applicable imbalance fees
utilizing a daily price index recognized as authoritative by the natural gas industry and most closely
approximating the applicab{e index.
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for seroices provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
Speclal Conditions
In order to receive service under Rate I, Customer must have the type of ineter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
Issued By: David J. Park Vice President, Rates and Regulatory Affairs
Date Issued:
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DNISION REVISION NO: 0
RATESCHEDULE: T—TRANSPORTATION
APPLICABLE T0: AIf Cities designated as "Group A" on the Citlss Served List
EFFECTIVE DATE: Bills Rendered on or after 08l01/2009 PAGE: 33
Application
Applicable, i� the event that Company has entered into a Transportation Agreement, to a customer
direcdy connected to the Atmos Energy Corp., Mid-Tex Division Distribution System (Customer) for the
transportation of all natural gas supplied by Customer or Customer's agent at one Point of Delivery for
use in Customer's faci►ity.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Detivery, additional
charges and special contract arrangements between Company and Customer may be required p�ior to
service being fumished.
Monthly Rate
Customers bill will be calculated by adding the following Customer and MMBtu charges to the amounts
and quanGties due under the riders listed below:
�harge Artfount
Customer Charge per Meter $ 425.00 per month
First 0 MMBtu to 1,500 MMBtu $ 0.2583 per MMBtu
Next 3,500 MMBtu $ 0.1884 per MMBtu
All MMBtu over 5,000 MMBtu $ 0.0404 per MMBtu
Upstream Transportation Cost Recovery: Plus an amount for upstream transportation costs in
axordance with Part (b) of Rider GCR.
Rate Review Mechanism: Plus or Minus an amount for rates as calculated in accordance with
Rider RRM.
Retention Adjustmenr Plus a quantity of gas as calculated in accordance with Rider RA.
Franchise Fee Adjustment: Plus an amount for ftanchise fees ca�ulated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Imbalance Fees
All fees charged to Customer under this Rate Schedule will be charged based on the quantities
determined under the applicable Transportation Agreement and quantities will not be aggregated for any
Customer with mul6ple Transportation Agreements for the purposes of such fees.
Issued By: David J. Park Vice President, Rates and Regulatory Affairs
Date Issued:
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DMSION REVISION NO: 0
RATE SCHEDULE: T — TRANSPORTATION
APPLICABLE TO: All Citiea designated as "Group A" on the Cities Served List
EFFECTNE DATE: Bills Rendered oa or after 08/01/2009 PAGE: 34
Monthly Imbalance Fees
Customer shall pay Company the greater of (i) $Q.10 per MMBtu, ar (ii) 150°� of the difference per MMBtu
between the highest and lowest "midpoinY price for the Katy point listed in P/atts Gas Daily in the table
entitled "Daily Price Survey" during such month, for the MMBtu of Customer's monthly Cumulative
Imbalance, as defined in the applicable Transportation Agreement, at the end of each month that exceeds
10°i6 of Customer's receipt quandties for the month.
Curtailment Overpull Fee
Upon notific�tion by Company of an event of curtailment or interruption of Customer's deliveries,
Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay
Company 200°/u of the midpoint price for the Katy point listed in Platts Gas Daily published for the
applicable Gas Day in the table en6tled "Daily Price Survey."
Replacement Index
In the event the "midpoint" or "common" price for the Katy point listed in Platts Gas Daily in the table
entitled "Daily Price Survey' is no longer published, Company will calculate the applicable imbalance fees
utilizing a daily price index recognized as authoritative by the natural gas industry and most closely
approximating the applicable index.
Ag�eement
A transportation agreement is required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
Speclal Conditions
In order to receive service under Rate T, customer must have the type of ineter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
Issued By: David J. Park Vice President, Rates and Regulatory Affairs
Date �sued:
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DN1310N REVISION NO: 0
RIDER: WNA — WEATHER NORMALIZATION ADJUSTMENT
APPLICABLE TO: All Cities designated as "Group A" o� the Cities Served Liat
EFFECTNE DATE: Bills Rendered on or after 08/01I2009 PAGE: 45
Provisions for Adiustment
The base rate per Mcf (1,000,000 Btu) for gas service set forth in any Rate Schedules utilized by the
ci6es of the Mid-Tex Division service area for determining normalized winter period revenues shall be
adjusted by an amount hereinafter described, which amount is referred to as the "Weather Normalization
Adjustment." The Weather Normalization Adjustment shall apply to all temperature sensitive residential,
and commercial bills based on meters read during the revenue months of November through April. The
five regional weather stations are Abilene, Austin, Dallas, Waco, and Wichita Falls.
Com�uta6on of Weather Normalization Adjustment
The Weather Normalization Adjustment Factor shall be computed to the nearest one-hundredth cent
per Mcf by the following formula:
(HSFi x (NDD-ADD) )
WNAF� = Ri
(BL� + (HSF� x ADD) )
Where
i = any particular Rate Schedule or billing classification within any such
particular Rate Schedute that contains more than one billing classifica6on
WNAFi = Weather Normalization Adjustment Factor for the ith rate schedule or
classification expressed in cents per Mcf
R� = base rate of temperature sensitive sales for the ith schedule or
classification approved by the entity exercising original jurisdiction.
HSFi = heat sensitive factor for the i� schedule or classification calculated as the
slope of the linear regression of average sales per bill (Mcfl and actual
heating degree days by month for the test year by schedule or cfassification
and weather station as part of the RRM fiting.
NDD = billing cycle normal heating degree days calculated as the simple ten-year
average of actual heating degree days.
ADD = billing cyGe actual heating degree days.
BI� = base load sales for the ith schedule or classification calculated as the y-
intercept of the linear regression of average sales per bill (Mc� and actual
heating degree days by month for the test year by schedule or classification
and weather station as part of the RRM filing.
The Weather Normalization Adjustment for the jth customer in ith rate schedule is computed as:
Issued By: David J. Park Vice President, Rates and Regulatory Affairs
Date Issued:
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DNISION REVISION NO: 0
RIDER: WNA — WEATHER NORMALIZATION ADJUSTMENT
APPLICABLE T0: All Citiss designated as "Group A" on the Cities Served List
EFFECTNE DATE: Bills Rendered on or after 08l0112009 PAGE: 46
WNA� = WNAF� x q
Where q is the relevant sales quantity for the jth customer in ith rate schedule.
Filinqs with Entities Exeroising Oricinal Jurisdiction
As part of its annual RRM filing the Company will file (a) a copy of each computation of the Weather
Normalization Adjustment Factor, (b) a schedule showing the effec6ve date of each such Weather
Normalization Adjustment, (c) a schedule showing the factors of values used in calculabng such
Weather Normalization Adjustment and (d) a random sample and audit of thirty (30) actual customer
bills, with customer information deleted, for each rate schedule or classificaUon to which the WNA was
applied in the preceding 12 month period. To the extent that source data is needed to audit the WNA
application, such data will be provided by the Company as part of the annual RRM filing.
If the RRM is discontinued, as provided in the Rider RRM tariff, the information required herein to be
filed with the entities exercising original jurisdicGon shall be flled on March 1 of each year.
Base UselHeat Use Factors
Residential Commercial
Base use Heat use Base use Heat use
Weather Station Mcf Mcf/HDD Mcf Mcf/HDD
Abilene 0.98 .0140 9.64 .0629
Austin 1.30 .0161 20.00 .0815
Dallas 1.60 .0212 20.12 .1018
Waco 1.12 .0139 11.69 .0608
Wichita 1.12 .0159 11.67 .0649
Falls
Samole WNAFj Ca�ulaUon:
(.0140 x (30-17) )
.3393 per Mcf = 2.2707 x
(0.98 + (.0140 x 17) )
Where
i = Residential Single Block Rate Schedule
Ri = 2.2707 per MCF
HSFi = .0140 (Residential - Abilene Area)
Issued By: David J. Pa�lc vce President, Rates and Regulatory Affairs
Date Issued:
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DNISION REVISION NO: 0
RIDER: WNA — WEATHER NORMALIZATION ADJUSTMENT
APPLICABLE T0: All Cities designated as "Group A" on the Citiss 3erved Liat
EFFECTIVE DATE: Bills Rendered on or after 08l0112009 PAGE: 47
NDD = 30 HDD (Simple ten-year average of Actual HDD for Abilene Area — 9I15I06
—10/14/06)
ADD = 17 HDD (Actual HDD for Abilene Area — 9/15/06 —10/14/O6)
Bli = 0.98 Mcf (Residential - Abilene Area)
Issued By: David J. Park vice President, Rates and Regulatory Affairs
Date Issusd:
Attachment A
ATMOS ENERGY CORPORATION
MID TEX DNISION REVISION NO: 0
RIDER: GCR — GAS COST RECOVERY
APPLICABLE T0: All C�ies Except Dallas
EFFECTIVE DATE: Bills Rendered on or after 8/1/2008 PAGE: 68
Applicable to Rate R, Rate C, and Rate I for all gas sales made by Company, and applicable to Rate R,
Rate C, Rate I, and Rate T for recovery of Pipeline System costs. The total gas cost recovery amount
due is determined by adding the gas cost calculated in Section (a) below and the pipeline cost calculated
in SecGon (b) below.
The amount due for gas cost (Section (a)) is determined by multiplying the Gas Cost Recovery Factor
(GCRF) by the Customer's monthly volume. For Customers receiving service under Rate R and Rate C,
monthly volume will be calculated on a Mcf basis. For Customers receiving service under Rate I, monthly
volume will be calculated on an MMBtu basis and the quantities will be adjusted as necessary to recover
actual gas costs.
The amount due for pipeline cost (Section (b)) is determined by multiplying the Pipeline Cost Factor
(PCF) by the Customers monthly volume. For Customers receiving service under Rate R and Rate C,
monthly volume will be calcufated on an Mcf basis. For Customers receiving service under Rate 1 and
Rate T, monthly volume will be calculated on an MMBtu basis and the quantities will be adjusted as
necessary to recover actual gas costs.
(a) Gas Cost
Method of Calculation
The monthly gas cost adjustment is calculated by the application of a Gas Cost Recovery Factor (GCRF),
as determined with the following formula:
GCRF = Estimated Gas Cost Factor (EGCF) + Reconciliation Factor (RF) + Taxes (TXS)
EGCF = Es6mated cost of gas, including lost and unaccounted for gas attributed to residential,
commercial, and industrial sales, and any reconciliation balance of unrecovered gas costs, divided
by the estimated total residential, commercial, and industrial sales. Lost and unaccounted for gas is
limited to 5%.
RF = Calculated by dividing the difference between the Actual Gas Cost Incurred, inclusive of
interest over the preceding twelve-mon� period ended June 30 and the Actual Gas Cost Billed
over that same twelve-month period by the estimated total residential, commercial, and industrial
sales for the succeeding October through June billing months. The interest rate to be used is the
annual interest rate on overcharges and under charges by a utility as pubtished by the Public Utility
Commission each December. The interest rate for calendar year 2009 is 2.09%.
Actual Gas Cost Incurred = The sum of the costs booked in Atmos Energy Corp., Mid-Tex Division
acxount numbers 800 through 813 and 858 of the FERC Un'rform System of Accounts, including the
net impact of injecting and withdrawing gas from storage. Also includes a credit or debit for any
out-of-period adjustments or unusual or nonrecurring costs typiplly considered gas costs and a
credit for amounts received as Imbalance Fees or CuRailment Overpull Fees. Also inGudes any
Issued By: David J. Park Vice President, Rates and Regulatory Affairs
Date Issued:
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DNISION REVISION N0: 0
RIDER: GCR — GAS COST RECOVERY
APPLICABLE TO: All Citiss Except Dallas
EFFECTNE DATE: Bilis Rendered on or after 81112009 PAGE: 69
prudendy incurred transaction-related fees, gains or losses and other transaction costs associated
with the use of various financial instruments that are executed by the Company for the purpose of
price volatility mitigation.
Actual Gas Cost Billed = EGCF multiplied by the monthly volumes billed to Residential, Commercial
and Industrial Sales customers, less the total amount of gas cost determined to have been
uncollectibte and written off which remain unpaid for each month of the reconciliation period.
Any amount remaining in the reconciliation balance after the conclusion of the period of amortization
will be maintained in the reconaliation balance and induded in the collection of the next RF.
Atmos Energy shall file annual reports with the Commission, providing by month the following
amounts: Gas Cost Written Off. Margin Written Off, Tax and Other Written Off, Total Written Off,
Gas Cost Collected and Margin Collected.
TXS = My statutorily imposed assessments or taxes applicable to the purchase of gas divided by
the estimated total residential, commercial, and industrial sales.
ADJ = Any surcharge or refund ordered by a regulatory authority, inclusive of interest, divided by the
estimated total residential, commercial, and industrial sales is to be included as a separate line item
surcharge.
(b) Pipeline Cost
Method of Calculation
Each month, a Pipeline Cost Factor (PCF) is calculated separately for each Pipeline Cost Rate Class
listed below. The formula for the PCF is:
PCF = PP / S, where:
PP =(P - A) x D, where:
P= Estimated monthly cost of pipeline service calculated pursuant to Rate CGS
D= Pipeline serv'ice allocation factor for the rate class as approved in the Company's most recent
rate case, as follows:
Issued By: �avid J. Park vice President, Rates and Regulatory Affairs
Date Issued:
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DMSION REVISION NO: �
RIDER: GCR — GAS COST RECOVERY
APPLICABLE T0: Al! Citiss Except Dillas
EFFECTNE DATE: Bills Rendered on or after 8HI2009 PAGE: 70
Pi line Cost Rate Class Allocation Factor D
Rate R - Residential Service .634698
Rate C - Commercial Service .302824
Rate I- Industrial Service and Rate T- Trans ortation Service .062478
A= Adjustment applied in the current month to correct for the difference between the actual and
estimated pipeline cost revenue of the second preceding month, calculated by the formula:
A = R - (C - A2), where:
R= Actual revenue received from the applicaGon of the PP component in the second preceding
month.
C= Actual pipeline costs for the second preceding month.
A2 = The adjustment (A) applied to the PP component in the second preceding month.
S= Estimated Mcf or MMBtu for the rate class for the current billing month.
The PCF is calculated to the nearest 0.0001 cent.
The Pipeline Cost to be billed is determined by mulGplying the Mcf or MMBtu used by the appropriate
PCF. The Pipeline Cost is determined to the nearest whole cent.
Issued By: David J. Park Vice President, Rates and Regulatory Affairs
Date Issued:
Attachment A
ATMOS ENERGY CORPORATION
MID-TEX DNISION REVISION NO: 0
RIDER: CEE — CONSERVATION 8 ENERGY EFFICIENCY
APPLICABLE T0: All Citles except Dallas
EFFECTIVE DATE: Btlls Rende�ed on or after 8h12008 PAGE: 84
Puroose
Atmos Energy Mid-Tex is proposing to institute a complete Conservation 8 Energy Efficiency program
which will offer assistance to qualified customer segments in reducing energy consumption and lowering
energy utility bills. The proposal is one where Atmos Energy sharehoiders will fund a percentage of the
allowable expenses incurred annually, with a customer rate component providing the remainder of the
funding. Folbwing is a high-level, concept summary of the proposal. Atmos Energy Mid-Tex Division
proposes to work with the communities it serves to develop the details of a new tariff and programs
addressing conservation and energy efficiency.
Synopsis:
Voucher system to provide free energy savings materials and supplies to qualifying customers of Atmos
Mid-Tex. Qualified Customers will receive up to one thousand five hundred dollars ($1,500.00) worth of
caulking, weather-stripping, sheathing, sealing, water heater blankets, related gas plumbing, and like
materials, other energy saving devices such as clock-thermostats, set-back devices ("covered items")
from approved suppliers / retailers including necessary labor.
Company will undertake efforts to enlist support from community groups, including its own Employee
Action Program, to assist customers with installation. If it is determined that professional installation
capabilities are necessary, the parties will agree on labor assistance amounts.
Eli ibili
Low Income — Low-income rate-payers that qual'rfy for heating bill assistance through LIHEAP and
other government energy efficiency pragram agencies and all agencies that distribute Atmos "Share the
Warmth" funds. Agencies that allocate assistance funds denote customer as Low Income, a status that
lasts for one year.
Senior Citizen — Primary account holder can request eligibility through ATM call center or web-site.
Customer provides primary SSN which is verified through Social Security Administrdtion. And account
holder that is or tums 65 years old in that year becomes eligible.
Fundinq
Initial annual program funding will be at two million dollars ($2,000,000). Atmos Energy shareholders will
contribute one million dollars ($1,000,000.00) to this initiative annually with ratepayers providing one
million dollars ($1,000,000.00) per year. It is proposed that the program operate on an October 1 through
September 30 year, w'dh regulatory asseUliability accounting employed by Atmos to track the difference
between program funding and qualifying program expenditures. No Atmos employee labor will be
charged as a program expenditure.
Administration:
A third-party administrator will coordinate qualification of customers, voucher distribution, subsequent
verification and reimbursement of eligible expenditures and general program administration. Program
administration expenses will be funded from the annual approved budget.
Issued By: David J. Park vice President, Rates and Regulatory Affairs
Date Issued:
Y T' ♦
Attachment A
ATMOS ENERGY CORPORATION
MID TEX DIVISION REVtSION N0: 0
RfDER: CEE — CONSERVATION � ENERGY EFFICIENCY
APPLICABLE TO: All Cities except Dallas
EFFECTNE DATE: Bills Rendered on or after 8H/2008 PAGE: 85
Audits will be provided all interested parties within 120 days of the end of each program year to determine
effectiveness.
Re°ort
Atmos shall file an annual report detailing cost to administer the program including the amounts paid out
of the program for energy conversabon assistance. The report shall also detail the number of applicants
and expenditures by geographic location, including the numbers of applications rejected and accepted
and reason if rejected. The report shall be filed with the Director of the Gas Services Division of the
Railroad Commission within 120 days of the end of each program year and with counsel of record for
municipalities served by the Mid-Tex Division.
Issued By: David J. Park Vice President, Rates and Regulatory Af�airs
Date Issued:
r ATTACHMENT B
' � � ATMOS ENERGY CORP., MID-TEX DIVISION
_ PROOF OF REVENUES
TEST YEAR ENDING DECEMBER 31, 2008
(2009 RRM SETTLEMENT PROPOSAL)
Line Prospective Total change from
No. Description Rate Increase 2008 True-ua current rates
(a) (b) (c) (d)
1 Rate R
2 Consumption Charge per MCF
3 Change from Current Rate $0.1047 $0.0060 $0.0297
4 Billing Units for Specified Period 82,321,960 82,321,960 82,321,960
5 Total Change in Base Revenue $8,619,109 $493,932 $2,444,962
6 Associated Revenue Taxes $532,144 $30,495 $150,952
7 Total Rate Impact $9,151,253 $524,427 $2,595,914
8 Number of Bills for Specified Period 17,244,058 17,244,058 17,244,058
9 Average Impact per Bill $0.53 $0.03 $0.15
10 Rate C
11 Consumption Charge per MCF
12 Change from Current Rate $0.0383 $0.0052 $0.0068
13 Billing Units for Specified Period 52,439,100 52,439,100 52,439,100
14 Total Change in Base Revenue $2,008,418 $272,683 $356,586
15 Associated Revenue Taxes $124,000 $16,835 $22,016
16 Total Rate Impact $2,132,417 $289,519 $378,601
17 Number of Bills for Specified Period 1,452,943 1,452,943 1,452,943
18 Average Impact per Bill $1.47 $0.20 $0.26
19 Rates I&T -1st block
20 Consumption Charge per MCF
21 Change from Current Rate $0.0144 $0.0087 ($0.0150)
22 Billing Units for Specified Period 9,681,181 9,681,181 9,681,181
23 Total Change in Base Revenue $139,409 $84,226 ($145,218)
24 Associated Revenue Taxes $8,607 $5,200 ($8,966)
25 Total Rate Impact $148,016 $89,426 ($154,183)
26 Rates I�T - 2nd block
27 Consumption Charge per MCF
28 Change from Current Rate $0.0105 $0.0064 ($0.0109)
29 Billing Units for Specified Period 10,782,882 10,782,882 10,782,882
30 Total Change in Base Revenue $113,220 $69,010 ($117,533)
31 Associated Revenue Taxes $6,990 $4,261 ($7,257)
32 Total Rate Impact $120,210 $73,271 ($124,790)
33 Rates I&T - 3rd block
34 Consumption Charge per MCF
35 Change from Current Rate $0.0023 $0.0014 ($0.0023)
36 Billing Units for Specified Period 19,798,632 19,798,632 19,798,632
37 Total Change in Base Revenue $45,537 $27,718 ($45,537)
38 Associated Revenue Taxes $2,811 $1,711 ($2,811)
39 Total Rate Impact $48,348 $29,429 ($48,348)
40 Rates 18�T - Total
41 Total Rate Impact $316,575 $192,127 ($327,322)
42 Number of Bills for Specified Period 11,571 11,571 11,571
43 Average Impact per Bill $12.79 $7.73 ($13.32)
44 '
45 Total Change in Base Revenue $10,925,693 $947,570 $2,493,260
46 Total Rate Impact (Inc. Rev. Taxes) $11,600,245 $1,006,073 $2,647,194