Loading...
Res 073-2003 7/1/2003RESOLUTION NO. 'A3-aCC RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, AWARDING BID AND CONTRACT FOR THE REMODELING OF FIRE STATION No. 2 PROJECT (CDBG) CWF 03- 204-11; FINDING AND DETERMINING THAT THE MEETING AT WHICH THIS RESOLUTION WAS PASSED WAS OPEN TO THE PUBLIC AS REQUIRED BY LAW. WHEREAS, the City of Wichita Falls has advertised for bids for the Remodeling of Fire Station No. 2 Project (CDBG); and WHEREAS, it is found that the lowest, responsible bidder is Norman R. Bratcher Construction Co., who made a lump sum bid with an estimated total of $176,825.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: SECTION 1 . Said lump sum bid of Norman R. Bratcher Construction Co., with an estimated total of $176,825.00 is hereby accepted, and the City Manager is authorized to execute a contract for the City with said Contractor for the construction of the Remodeling of Fire Station No. 2 Project (CDBG). SECTION 2 . It is hereby officially found and determined that the meeting at which this resolution was passed was open to the public as required by law. PASSED AND APPROVED this the 1st day of July, 2003. ATTEST: City Clerk