Res 097-2010 8/17/2010 RESOLUTiON NO. 97-2010 Resolution Awarding Bid and Contract For The 2010 CDBG Waterline Replacement Project (CWF10-204-07) to Whitewater Construction, in an estimated total amount of $600,762.00 WHEREAS, the City Council finds the City advertised for bids for the 2010 CDBG Waterline Replacement Project (CWF10-204-07) in accordance with all legal requirements; WHEREAS, the City Council finds the lowest responsible bidder was Whitewater Construction, which made a unit price bid with an estimated total of $600,762.00; and WHEREAS, The project is being funded by a combination of remaining American Recovery and Reinvestment Act (ARRA) of 2009 and approved 2010 Community Development Block Grant (CDBG) funds, and a Substantial Amendment to the Program Year 2008 Action Plan of the 2005-2009 Consolidation Plan was approved by Council by Resolution #74-2009, dated June 2, 2009, that allocated $381,303.00 in CDBG-R stimulus funding from ARRA. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The unit price bid for the 2010 CDBG Waterline Replacement Project (CWF10- 204-07) is awarded to Whitewater Construction, in an estimated total amount of $600,762.00, and the City Manager is authorized to execute a contract with said entity for the construction of this project. PASSED AND APPROVED this the 17 day of August, 2010. ��.�.. ���.----, MAYOR ATTEST: i y Clerk � � � �� � `\ u.,. , l � �, � �yb)W Wv �\ � / � xoiq,eV� �� �_�� �t � a \} ~' � 4 � �� �a � �, '` _�-- , PROJECT � � ; LOCAlI0P�1 4 �\ ¢xn.�. wx+ �r y F : / �� �` i V� � � � Q g � � /� � m c 5 �-�� � -�� � � J �� f,_.--^=-7," {n �, VICINITY MAP ARRA FUNDS (S�A O+OQ TO 6+59.6; —'1� C�BG FUNDS � (STA o+�?.6 TO ST.A 14+25."I?j �. GERALD .� ■��1���1�■ �p� . � o \ cr� z a � ` � ;;HAiVCE K rc J l � 9 o � 41 = ROUSEVEL7 �- �� N10oD5 4�' F �� - � \ rULSA � �� � \ � FLOOD `� �' \ _— CLBG � U^�DS ; ■ . c � � y ■ � - =ULLER ; ! i_, �:i � _� : w `� 3 U ■� ■ _ ■ � \ HARDiNC R �v1ARCONI \ ...... ■........ ■. A R I� A \� ��� 2014 CDBG WATERLINE � �RRh FuNDS �pLACEMENT CDBG PROJECT RepTacement Project l Engineer's Estimate Whitewater Construction Bowles Construction Wichita Contrac ription Price Cost Price Cost Price Cost Price Co: Quanti Unit >ilization & Site Pre 1 LS $25,000.00 $25,000.00 $6,000.00 $6,000.00 $15,000.00 $15,000.00 $25,115.00 �ement Repair 2813 SY $50.00 $�40,650.0� g60.00 $168,780.00 $45.00 $126,585.00 $50.00 g nch Safe 5622 LF $1.00 �5,622.00 $1.00 $5,622.00 $1.00 $5,622.00 $2.00 all 6" Water Pipe & Fittings 3953 LF $47.00 $185 � $30.00 $118,590.00 $36.00 $142,308.00 $37.00 g all 8" Water Pi e& Fittin s 1669 LF $50.00 $83,450.00 $35.00 $58,415.00 $37.00 $61,753.00 $42.00 all Fire H drant Assembl 11 EA $3,000.00 $33,000.00 $3,000.00 $33,000.00 $2,800.00 $30,800.00 $2,700.00 nove & Salva e Fire N drantAssembl 5 EA $500.00 52,500.00 $100.00 $500.00 $500.00 $2,500.00 5300.00 all 6" Gate Valve w/ Box 13 EA $700.00 $9,100.00 $800.00 $10,400.00 $800.00 $10,400.00 5800.00 all 8" Gate Valve w/ Box 2 EA 5850.00 $1,700.00 $1,200.00 $2,400.00 $1,100.00 $2,200.00 $1,025.00 all 3/4" Lon Service 52 EA $600.00 $31,200.00 $800.00 541,600.00 $1,200.00 $62,400.00 $1,000.00 all 3/4" Short Service 48 EA $200.00 $9,600.00 $500.00 $24,000.00 $600.00 $28,800.00 $550.00 6 Plu Existin 2" Water Main 4 EA $500.00 $2,000.00 $500.00 $2,000.00 $500.00 $2,000.00 $500.00 & Plu Existin 6" Water Main 2 EA $750.00 $1,500.00 $700.00 $1,400.00 $600.00 $1,200.00 $1,200.00 & Plu Existin 8" Water Main 2 EA $750.00 $1,500.00 $500.00 $1,000.00 $700.00 $1,400.00 $1,300.00 � ora Barricadin & Traffic Control 1 LS $15,000.00 $15,000.00 $2,500.00 $2,500.00 $4,500.00 $4,500.00 $5,000.00 Base Bid $547,613.00 Base Bid 5476,207.00 Base Bid $497,468.00 Base Bid ff Engineer's Estimate Whitewater Construction Bowles Construction Wichita Contrac ;ription Price Cost Price Cost Price Cost Pnce ( Quanti Unit 3vement Re air 713 SY $50.00 $35,650.00 $60.00 $42,780.00 $45.00 $32,085.00 $50.00 ench Safet 1425 LF $1.00 $1,425.00 $1.00 $1,425.00 $1.00 $1,425.00 $2.00 >tall 6" Water Pi e& Fittin s 1425 LF $47.00 $66,975.00 $30.00 $42,750.00 $39.00 $55,575.00 $37.00 >tall Fire H drant Assembl 3 EA $3,000.00 $9,000.00 $3,000.00 $9,000.00 $2,800.00 $8,400.00 $2,500.00 �move & Salvage Fire Hydrant 2 EA $500.00 $1,000.00 $100.00 $200.00 5500.00 $1,000.00 $300.00 >sembl �tall 6" Gate Valve w/ Box 2 EA $700.00 $1,400.00 $800.00 $1,600.00 $800.00 $1,600.00 $800.00 �tall 3/4" Lon Service 21 EA $600.00 $12,600.00 $800.00 $16,800.00 $1,200.00 $25,200.00 $1,000.00 �tall 3/4" Short Service 19 EA $200.00 $3,800.00 $500.00 $9,500.00 $600.00 $11,400.00 5550.00 it 8 Plu Existin 2" Water Main 1 EA $500.00 $500.00 $500.00 $500.00 $500.00 $500 00 $500.00 Add/Alt Bid $132,350.00 Add/Alt Bid $124,555,00 Add/Alt Bid $137,185,00 Add/Alt Bid $132,87'. TOTAL Bid $679,963.00 TOTAL Bid $600,762.00 TOTAL Bid $634,653.00 Bid g