Loading...
Res 047-2002 5/7/2002RESOLUTION NO. 47 -2002 RESOLUTION TO APPROVE CHANGE ORDER NO. 1 FOR THE SECONDARY RESERVOIR PIPELINE IMPROVEMENT PROJECT; FINDING AND DETERMINING THAT THE MEETING AT WHICH THIS RESOLUTION WAS PASSED WAS OPEN TO THE PUBLIC AS REQUIRED BY LAW. WHEREAS, the City of Wichita Falls entered a unit price contract with Bowles Construction with the estimated total cost of $1,012, 960.00; and WHEREAS, it was found that a proposed 48 -inch pipeline was in conflict with an existing 42 -inch pipeline serving the Cypress Water Treatment Plant; and WHEREAS, the 48 -inch pipeline was adjusted by lowering it under the 42 -inch pipeline: and WHEREAS, the grade has been adjusted on a proposed 36 -inch pipeline; and WHEREAS, the total cost of this Change Order is $17,900.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: SECTION 1. Change Order No. 1 for the Secondary Reservoir Pipeline Improvement Project is hereby approved and the City Manager is authorized to execute Change Order No. 1. SECTION 2. It is hereby officially found and determined that the meeting at which this resolution was passed was open to the public as required by law. PASSED AND APPROVED this the 7th day of May, 2002. ATTEST: IAN-) �)U& City Clerk