Loading...
Res 062-2000 5/16/2000RESOLUTION NO. RESOLUTION TO APPROVE ENGINEERING SERVICES CONTRACT WITH CORNERSTONE ENGINEERING FOR THE INSPECTION OF A 3,000,000 GALLON STEEL GROUND STORAGE TANK AT CYPRESS WATER TREATMENT PLANT AND RECOATING AND MINOR REPAIRS TO THE NINTH STREET ELEVATED TANK; FINDING AND DETERMINING THAT THE MEETING AT WHICH THIS RESOLUTION WAS PASSED WAS OPEN TO THE PUBLIC AS REQUIRED BY LAW. WHEREAS, the City of Wichita Falls desires to have the 3,000,000 gallon ground storage tank at Cypress Water Treatment Plant inspected and the Ninth Street elevated tank requires recoating; and WHEREAS, the City of Wichita Falls wishes to retain the engineering firm of Cornerstone Engineering for the preparation of the plans and specifications for the recoating of the Ninth Street elevated tank and to perform the inspection of the 3,000,000 gallon ground storage tank at Cypress Water Treatment Plant. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: SECTION 1. The contract between Cornerstone Engineering for the inspection of the 3,000,000 gallon steel ground storage tank at Cypress Water Treatment Plant and recoating and minor repairs of the Ninth Street elevated tank is hereby approved at a cost of $36,250. SECTION 2. It is hereby officially found and determined that the meeting at which this resolution was passed was open to the public as required by law. PASSED AND APPROVED this the 16th day of May 2000. ATTEST: City Clerk 1.'� y MAYOR