Loading...
Res 074-2000 6/6/2000RESOLUTION NO. -ILA - JOCO RESOLUTION TO APPROVE ENGINEERING SERVICES CONTRACT WITH CORLETT, PROBST & BOYD, INC., IN ASSOCIATION WITH CAMP DRESSER & MCKEE, FOR LAKE KEMP WATER SUPPLY SYSTEM, JASPER WATER TREATMENT PLANT IMPROVEMENTS, AND RIVER ROAD WATER REUSE IMPLEMENTATION; FINDING AND DETERMINING THAT THE MEETING AT WHICH THIS RESOLUTION WAS PASSED WAS OPEN TO THE PUBLIC AS REQUIRED BY LAW. WHEREAS, the City of Wichita Falls desires to construct improvements to deliver water from Lake Kemp to the Cypress Water Treatment Plant, renovate the existing Water Treatment Plant at Jasper and a pilot study for the reuse of the River Road effluent; and WHEREAS, the City of Wichita Falls must comply with new regulations proposed by the Environmental Protection Agency; and WHEREAS, the City of Wichita Falls wishes to retain the engineering firm of Corlett, Probst & Boyd, Inc., in association with Camp Dresser & McKee, for the engineering services for the Lake Kemp Water Supply System, Jasper Water Treatment Plant Improvements, and River Road Water Reuse Implementation and associated work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: SECTION 1. The contract between Corlett, Probst & Boyd, Inc., in association with Camp Dresser & McKee, for engineering services for the Lake Kemp Water Supply System, Jasper Water Treatment Plant Improvements and River Road Reuse Implementation is hereby approved at a cost not to exceed $3,675,500.00. SECTION 2. It is hereby officially found and determined that the meeting at which this resolution was passed was open to the public as required by law. PASSED AND APPROVED this the 6th day of June 2000. "'.1 1:Uz4L. MAYOR ATTEST: