Loading...
Res 143-2001 12/18/2001RESOLUTION NO.I RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, TO AWARD THE BID AND AUTHORIZE THE CITY MANAGER TO EXECUTE A CONTRACT FOR THE SECONDARY RESERVOIR WATER STORAGE POND ADDITION PROJECT; FINDING AND DETERMINING THAT THE MEETING AT WHICH THIS RESOLUTION WAS PASSED WAS OPEN TO THE PUBLIC AS REQUIRED BY LAW. WHEREAS, the City of Wichita Falls has advertised for bids for the construction of the Secondary Reservoir Water Storage Pond Addition Project; and WHEREAS, it is found that the lowest responsible bidder is Prater Equipment Co., which made a unit price bid with an estimated total of $675,387.75. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: SECTION 1. The unit price bid of Prater Equipment Co. for the Secondary Reservoir Water Storage Pond Addition project, with an estimated total of $675,387.75, is hereby accepted, and the City Manager is authorized to execute a contract on behalf of the City of Wichita Falls with Prater Equipment Co. for the construction of such project. SECTION 2. It is hereby officially found and determined that the meeting at which this resolution was passed was open to the public as required by law. PASSED AND APPROVED this the 18th day of December, 2001. ATTEST: City Clerk MAYOR