Loading...
Res 361 7/13/1959CITY OF WICHITA FALLS INTER - OFFICE MEMORANDUM TO: YX. C. J. Griggs, City IAnager DATE: June 3 ()a 1959 FROM: F. M. Rugeley SUBJECT: PIPE LINE CI S :G SINCLAIR BOULEVARD COMMENT: I see no objection to granting the'request of the Sinclair Pipe Line Came for permission to build a 4 inch jet fuel pipe line across Sinclair Boulevard approximately 300 feet east of U.S. ffighwv 281, If this permission is granted, the Pipe Line Comps should be required to encase the 4 inch line in a larger pipe for the full width of the right —of —gray, bury the pipe to a depth of 3 feet of cover, and erect at least one pipe line marker on the south right- of - -way line. Since the location is gLven approximately the City should be furnished a map of the exact location when the pipe line crossing is completed. c 8