Res 676 1/9/1967RESOLUTION NO. C ,, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The recommended policy concerning water and sewer extensions to I.D.I. Expressway East Industrial Area set out in the memorandum dated November 21, 1966 from Joe Smith, Director of Public Utilities, to Jack Davis, City Manager, is hereby adopted as the policy of the City of Wichita Falls. PASSED AND APPROVED this the 9th day of January, 1967. ATTEST:. City Clerk. .. MOItA \T nY71!i T0: jack' Davis, City Manager DATE November 213 1966 Rv :: die Smith, Director: of Public Utilities SiiBj%CT :.. Utility Extensions I.D.I. Expressway East Industrial Area Approximate costs related to extension of water and sewer utilities to industrial Development Incorporated's Expressway East Industrial Area are as follows: Water $11,200.00 offsite cost { 25,600.00 onsite cost 1 $36,800.00 Total. Water Costs Sewer $49.,984.00 offsite cost 38,708.00, onsite cost 3,600.00 easement; cost [91,292.0p - Total Sewex Costs �.. . $129,092.00 Total Water & Sewer Costs J, Based on these approximate costs, we recommend that the City establish . ' the Allowing policies with respect to water and sewer extension to sub -' 4 ,sect property. A. Water (1) Utilize existing bond fund monies and extend 12" water main from existing 12" main in front of the Wayfarer Inn east across proposed Waurika leg of the expressway and thence south to the NW corner of the Expressway mast industrial property. ...E (2) ' Since sixty-%i11e per Cent {65%) of the 12" main extension is involved in highway, expressway and railroad crossings, with little chance to recover . cost on a front -foot basis by future tie -ons, it is ::ec.ummended that the City pay the total cost of this offsite extension. Cost is estimated at $11,200.00. (3) It is recommended that the ansite water extension, ,. approximate cost. of $25,600.00., be constructed and funded from existing"bond fund monies by the City and that a pro -rata charge of $3.00 per front -. foot be assessed when tie --on is made. (4) With the $3.00 pro -rata charge, industrial Develop- W,`,,ment incorporated would be required to pay an _ immediate cash payment of $9,913.00 for tie -on of 11 " Sprague, J a J, and the 8.5 acre tract west of Sprague. The balance of the on -situ cost, $15,687.00," } V I " . would be payable 'by industrial Vvelopment ineorp- j� orated on a front -foot basis as developed, but all payable within a five (5) year period with an inter- est charge of 017.0 the unpaid balance. Summary -Water extension Cost $1 City offsite 1,200 costs outlay. 25,000- City onsite costs outlay. , $36,500 Total City Outlay .. ,.-11,200_ Mon-- reimbursable off -site cost. 1 $25,600" Neimbursable Costs to City 9,913 r.b.Z. 2 ront- -f.00t cash payment $15,687 Balance or yeimauwabl.e costs . to City payable by 10.1. as developed, but all due at end �.� of five (5) years with interest of 4Q% on unpaid balance. D. Sewer (1) Sewer main-extension would be made from an existing main at the Sunnyside Addition to the expressway east industrial. property. This main is designed so that it will sufficiently serve the 10.1. property as well,•as approximately 314 acres between the Sunny- side Addition and- „the I.D.I. property. ,R S -3- (2) Easement cost connected with extension of the sewer plain from Sunnyside Addition, estimated to be approxi- mately $3,600.00, would totally be paid by the City. (3) Costs of onsite sewer extension would by payable immediately by in•dustrial Development Incorporated. Estimated cost of on -site sewer extensions is $38,708.00.".'.' (4) Offsite sewer extensions estimated at $49,984.00 from tre Sunnyside Addition to Expressway East industrial property would be reimbursable to the City from the following sources as property is platted and annexed.. 9 ' W. •. Property adjoining the sewer main exten- sion would be assessed a pro -rata charge of $1.60 per front -root. An estimated 10,500 feet of sewer extension would bV 'assessed s under this basis "producing a �? reimbursement to the City an estimated $16,800100. (b) Property beginning 450 feet north of the sewer main extension would be assessed _ • on the basis of $68,00 re. It is e stimated that this would involve involve 211 ; ,'acres and would produce under this basis �" _ i a xeimb- ursement to the City an estimated $14,348.00. (c) An estimated 277 acres comprising the t present Expressway Last industrial Area would be assessed on the basis of $68.00 per acre for offsite costs. This would produce a reimbursement to the City of an•estimated $18,836.00. (d) ..The unpaid balance of cost incurred by the City for ofBite sewer extension to the Expressway Last Industrial Area would c be payable by Industrial Development incorporated within a five (5) year period, An interest charge of 4i% would be made on tha.unpaid balance at subject time. I Summary - Sewer Extension Cost N $49,984 City offsiva.costs outlay. 38,708 10.1. on6 Le costs outlay. 3,600 City e samcat costs outlay $92,292 Total Saw or Extension Cost -38,708 10.1. ons i;e costs outlay. , $53,584 - 3,600 lion- ;.eizbursabla easement cost. $49,984 Total Offs0e Costs by City Z_2-,652 i.D.I. offsite cost for 39 acres @ $68.00 per acre i $47,348 Balance of offsite cost funded.. 1 'by the City and due from adjacent property owners, :lortrl property owners, and i !.D.I. Expressway Last indus- trial Area. Balance payable within five (5) years by I.D.I. with intcrast at 4Q% on unpaid balance at subject time. Summary - Water , and Sewer Extensions (i) .e from I.D.Z. - immediately DLL. .�.ro ..... .. , $ 9,913 Water front -foot costs. 38,708 Sewer onsite costs. ,652 Sewer ofrsize costs.on acreage basis. 1 5 $51,273 Total (2) Due from X.D.I. Deferred $15,687 Water front -foot cost. 47,148, Sewer offsite cost on front - foot on acreage basis by othe& owners and /or I.D.I. $63,035 Total (3) Non-reimbursable costs of City EI $11,200 Water offsite cost 30600 Sewer easement cost ti $14,800 Total f 1129,092 Total. project Cost