Loading...
Res 618 1/24/1966RESOLUTION NO. 641 BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS : That the provisions of Minute No. 56818, providing for widening that portion of F. M. 369 from Holliday creek to State Highway 79 passed by the Texas Highway Commission on November 16, 1965, are acceptable to the City of Wichita Falls, and said Minute Order is hereby accepted. It is hereby ordered that the City of Wichita Falls cooperate with the State Highway Department and proceed with the obligations so stipulated in the said Minute Order as being responsibilities of the City. PASSED AND APPROVED this the 24th day of January, 1966. MAYOR ATTEST: manna bit<,wa, t1•.artia.ut 1•-1.1-3tn In quint_1F•rr Abe- MINUTE ORDER County Page of Pages District No. 3, in WICTWA oa pm TO ma= ROAD the City of Wichita Ms Us requested assistance in the widening of pay including incidental items thereto fraa g llidry Creek to State Highway 79, $ distance of approximately 14 mile; and WOR218, en analysis of the requested work indicates that wish ridsning ei l materially add to traffic safety on this facility; NM, IMMZPO23, the State Highway Engineer is dirsstsa to tender the fallowing proposal to the City of Wiehita Falls: Provided the City wills 1. Provide for the immediate construction of continuous outer curb and cotter, utility adjustments, storm sewers, etc., all its mei be necessary fort oar nett project with the exception of pavement widening. s. Assn= responsibility for the construction of 44veweys and sidewalks Should they be did necessary nrov or in the future and agree to m such installations in accordance with governing polities and regulations of the Marpartemn t. 3• .nintcin that portion of the work which is its responsibility is asovar ace with present naa intajnee agreement, and agree to regulate traffic, pz ts for parcel end and prevent encroachment on the right of ay, oil is accordance with governing polUies cad regulations of the Depart/mat. The leans Highway Department will: 1. Provide for widening pavement and its support within these limits. 3. Zalntain that paartioa of the work which is its respeasibility in acoordmmotwithpresentmaintenanceagreement. r.. e IFl ilia i i • •. t i - . i : It is understood that the responsibility of tae Texas Highway Department is con- fined to the pavement and its support, and all other textures necessary now or in the future to provide an adequate travel facility shall be the responsibility f the Cit;; of Wichita Falls. Upon acce ptaace or the prcvisi000 of this; Order by the appropriate officials of the City of Wi^.h,ita Falls, the State aighway Engineer is directed to proceed with the development of plans for construction and after the City his fulfilled its responsibilities proceed with construction in the most feasible and economical manner, financing the cost in the 1967.1966 Coasolidatod L ighway Program. It is understood that the c:.ty may diachargc+ its construction obligations as out- lined herein in any manner as they may elect. In the event the City desires the State to include their portion of the work in the State's construction contract, the State Highway Engineer is hereby authorized to enter into agreement with the City for such work and its cost as may be agreed upon. M1. Order shall becc me operative upon acc .p .uee by the City of Wichita Falls and if not accepted within 90 day, of the date hereof, the action herein contained shall be automatically cancelled. 4 I io. 1 Si111I171I(Pd r•:1•.,Irit ended by Tit lei&pe• tstn Program Engineer 1 : .'.t State llltl,wa} Engineer Slaw IligI .r I•;r;:iu i On: u,issiuner ILIt(' 1',tssed NLti' 16 65 mmTil ->.int;er 34346-565-3m set.