4B Sales Tax Corporation Minutes - 07/09/2014 RECEIVED IN
CITY CLERK'S OFFICE
DATE: -� '
BY:
TIME: 11S1"
MINUTES OF THE
WICHITA FALLS 4B SALES TAX CORPORATION (4BSTC)
July 9, 2014
PRESENT:
Jim Ginnings, President § Members
Dave Clark §
Tony Fidelie §
Rick Hatcher §
Darron Leiker §
Casey O'Donnell §
Kevin Hugman, Assistant City Manager § City Staff
Jim Dockery, CFO/Assistant City Manager §
Miles Risley, City Attorney §
Linda Merrill, Recording Secretary §
Andy Lee §
Erin Marvin § Downtown WF Development
John Dickinson §
Brandi Shaver §
Clayton Lane §
Syd Litteken §
ABSENT:
Dustin Nimz, Vice President and Sec./Treasurer § Member
1. CALL TO ORDER.
Jim Ginnings called the meeting to order at 4:00 p.m.
2. APPROVAL OF MINUTES(OCTOBER 30,2013)
Dave Clark moved for approval. Seconded by Rick Hatcher, the motion carried.
3. DISCUSSION OF POTENTIAL IMPROVEMENTS TO FARMERS MARKET
Syd Litteken spoke on behalf of the Downtown Wichita Falls Development (DWFD).
The Farmers Market is a great success, but repairs are needed. Phase 1 plans include:
Project Estimated Cost
40' x 40' patio greenhouse roof(and accessories) $42,582
Replace wood trellis (paint trellis and cupola) $13,300
8th Street"Oil City"permanent sign $14,300
Reconstruct valley flashing and wall-to-roof flashing $ 4,800
Replace plexiglass in cupola with polycarbonate sheets $ 5,780
Lighting and timers $ 7,899
Total $88,661
H:\ Iegal\4A,4B,TIFS\4B Corp\4B Minutes\2014\2014.7.9\Minutes.4B 2014.7.9.doc
WFEDC—Minutes of July 9,2014 2
Phase 2 plans include:
Project Estimated Cost
Exterior garage doors $36,000
Remove/replace wrought iron protection bars; add $ 9,690
aluminum frame and tempered glazing and entrance
doors at office and bathrooms
Total $45,690
The City owns the facility, and leases it to DWFD for $1.00 per year. Mr. Hugman said
the City cut its maintenance budget, but still pays toward utilities. Operation and marketing costs
fall to DWFD, and that group takes in the revenues. Jim Dockery added that the City's cap is
$5,200-$5,800 per year toward the cost of utilities. Andy Lee said the City initially invested
$7,000 to get it up and running, and DWFD spent $10,250 the first year of the lease. At that time,
the Market generated $2,800 per year. That has increased 317%. They installed a rainwater
system and new landscaping. The City installed electrical panels, and DWFD contributed another
$25,000 of improvements this year.
Mr. Ginnings asked if DWFD is asking for the entire amount of$134,351. Mr. Lee said
they are asking for the entire amount, cushioning that request by adding that downtown events
generated $3.7 million in revenues for the City last year. Tony Fidelie asked how much the City
might contribute. Mr. Leiker said this is a request ripe for 4B funding. The 4B Board should fund
this, if it so chooses.
Mr. Ginnings asked whether it would be appropriate to vote on this discussion item.
Miles Risley did not recommend taking a vote; this is for a future agenda. Mr. Ginnings asked
the time line on these improvements. Mr. Litteken estimated 60 days.
Tony Fidelie said he works downtown and his family goes to the Farmers Market every
weekend. It is good to see City leaders working to improve Wichita Falls.
4. DISCUSSION OF POTENTIAL INFRASTRUCTURE IMPROVEMENTS TO STREET,
SIDEWALK,AND UTILITIES IN VICINITY OF 800 OHIO STREET
Andy Lee gave a history of the Zales building, now owned by the DWFD, as well as a
rundown of planned renovations and new businesses in its vicinity.
Sidewalk and street improvements are necessary at this location. He thanked the 4B
Board for appropriating $1.2 million in 2008-09 for downtown streetscape improvements. This is
the tail-end of that project.
Mr. Litteken said the Zales building is approximately 10,000 square feet in size. A lot of
businesses have shown interest in the property, but question the infrastructure. A 2"water line on
Ohio serves that building and Casa Manana. While repairing the sidewalk in front of the Zales
building, a 6" water line could be installed and attached to the 8" pvc line at the Holt Hotel
across 8th Street. Four water meters and a sprinkler riser would be the result.
The sidewalk in front of the Zales building is 21" higher than the street at the corner. A
19' ramp is necessary to get to the sidewalk level. They also want to include bulb-outs and cross-
WFEDC—Minutes of July 9,2014 3
walks and a star in the intersection. They have new concrete benches and light posts proposed for
these corners.
Mr. Dockery asked if this project could be done in phases. Mr. Litteken said they need to
get the water, sewer and walkway completed at this corner to bring the Zales building into
operation($103,419). The three other corners could be done at a later date ($93,241).
Davis Powell said the City is phasing out the 2" galvanized lines. That line would
eventually be replaced. Mr. Ginnings asked if that could be accelerated. Mr. Powell said he
would have to look at budgeting for other lines. The 6" line installation is a smaller project and
could be worked in. Mr. Leiker asked if that would help flows elsewhere, or would this
improvement just benefit that property. Mr. Powell said it would benefit Casa Manana, but
would not increase the flow for the rest of downtown. Mr. Leiker asked if it could help with
fluoride residue and fire hydrant flow. Mr. Powell said that it could.
Mr. Ginnings thanked the Downtown Wichita Falls Development team for their
presentation.
5. DISCUSSION OF PROPOSED BUDGET FOR FISCAL YEAR 2014-15
Kevin Hugman presented the 4B's draft budget for fiscal year 2014-15. The projected
ending cash balance for FY 2014 of$3,801,091 will be the beginning cash balance for FY 2015.
If revenues stay on track, the fund will end the year with $170,000 more than was anticipated.
The TIF #2 reimbursement is for the issuance of bonds for the Maplewood extension and
Rhea Road/Call Field realignment. A three-year repayment to the 4B for a loan for the travel
center is $116,111 each year.
Projects closed this year are the Kell House renovation, Kemp Center at the Forum, and
the BMX Track.
He projected budget revenues for FY 2015 at $4,268,902. The bulk of 4B revenues go to
repayment of the debt service on bonds. Most are still active several more years; the next one
will expire in 2018. Funding is included for radio and CAD maintenance and MDT software.
Street improvements totaling $400,000 is budgeted to target the downtown area. Administrative
charges of$10,000 represent a partial reimbursement for the time City staff spends working on
4B projects.
Only the MPEC project has been approved in FY 2014. Assuming no other projects are
approved, the unreserved fund balance for FY 2014 will be $1,458,000. The 4B Board's goal has
been to maintain about $1 million, so the fund is well above that.
A Downtown Improvements Grant Project was discussed in January at the City Council's
preliminary work session. Guidelines would be put together for the 4B Board's approval. This
would be a 50% matching grant up to $5,000 for any downtown business to use to improve the
downtown area. Once the guidelines were approved, this could be an administrative function of
City staff.
Mr. Dockery noted that staff will have a City pre-budget workshop with the Council next
week. As part of that, they will discuss some potential projects that are 4B eligible.
WFEDC—Minutes of July 9,2014 4
Mr. Ginnings asked for staff comment on funding DWFD's $331,000 request. Mr. Leiker
likes the project; there is a lot of interest in downtown revitalization. He is not sure how he
would rank it considering potential requests from the City,but the projects have merit.
Mr. Ginnings would like them brought before the 4B Board as action items, with the
dollar figures hardened. Mr. Hugman agreed to do so, adding that he will discuss the costs with
Davis Powell, as well.
Mr. Ginnings thanked City Attorney Miles Risley for his assistance. He enjoyed working
with him and wished him the best (in his new position as City Attorney for Corpus Christi).
Updates
Airport. The first flight is scheduled for November 20. There will be a VIP tour and
dinner on November 6; the 4B Board members will be invited.
Wayfinding. Under contract with manufacturer. Over 200 signs to be installed
beginning in September, to be finished by November.
Castaway Cove. Additional engineering drawings were necessitated before going out
for bids. Bids close within a week or so. Construction would begin when the park closes in
September, and take 90-120 days.
6. ADJOURN
The meeting was adjourned at 5:24 p.m.
J'm�'1 n_ , President