Res 1359 10/31/1972RESOLUTION NO. afq
RESOLUTION ACCEPTING NEW OUTLET WORKS
STRUCTURE AT LAKE KEMP, WITH THREE
EXCEPTIONS
WHEREAS, on October 25, 1972, a final inspection was made
on the new outlet works structure constructed by Amis Construc-
tion Co. of Oklahoma City under Contract No. DACW56-70-C-0112,
Construction of Embankment, Outlet Works and Spillway, Lake
Kemp Dam, Wichita River, Texas; and,
WHEREAS, all of the outlet works structure has been con-
structed in accordance with the plans and specifications
with the following three exceptions: The service bridge gate,
the floodlight pole located on the deadman near the service
bridge, and the warning horn located on the downstream side
of the intake structure.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN
OF THE CITY OF WICHITA FALLS, TEXAS, THAT:
Such new outlet works structure at Lake Kemp is hereby
accepted by the City of Wichita Falls and Wichita County
Water Improvement District No.2, subject to the three following
exceptions:
1) Service bridge gate.
2) The floodlight pole located on the deadman near the
service bridge.
3) The warning horn located on the downstream side of the
intake structure.
PASSED AND APPROVED THIS THE 31ST DAY OF OCTOBER, 1972.
uL itL 4/. /./_iA,A
M A Y O R
ATTEST:
Jil-e 49.-t.e_)k- A61?--
A-ve_ g--)
City Clerk
I