Loading...
Res 1331 8/15/1972RESOLUTION NO. /..3/ BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: That certain contract, a copy of which is attached hereto, between the City of Wichita Falls, as first party, and Biggs and Mathews, Consulting Engineers, as second party, providing for engineering services as spelled out in attached contract, for sanitary sewer extension to Arrowhead Industrial District is hereby approved, and the City Manager is authorized to execute the same for the City. PASSED AND APPROVED THIS THE 15th day of August 1972. MAYOR ATTEST: City Clerk STATE OF TEXAS COUNTY OF WICHITA This Contract, made and entered into as of the 14th day of July, 1972, by and between the City of Wichita Falls (hereinafter called "Owner") and the firm of Biggs & Mathews, Inc. , Consulting Engineers, Wichita Falls, Texas (hereinafter called "Engineer") WITNESSETH: WHEREAS, a new sewer line and pumping station is proposed to the Arrowhead Industrial District in the northern part of Wichita Falls, Texas; and WHEREAS, the Firm of Biggs & Mathews, Inc. is acceptable to the Owner and is willing to enter into a contract to perform engineer- ing services required by the Owner; NOW, THEREFORE, it is agreed as follows: I. The Owner hereby retains the Engineer for all engineering services required in connection with construction of the sewer line and pumping station. II . The services performed by the Engineer in connection with proposed improvements shall be divided into three phases, as follows: Phase 1 - Preliminary study and design necessary to outline those improvements required. 1- Phase 2 - Preparation of detailed plans and specifications for improvements included under Phase 1 . Phase 3 - General administration of construction of improvements included under Phase 2. Phase 1 - Preliminary study and design - shall include: a) Participation in preliminary conferences with the Owner regarding the proposed project; b) Preparation of preliminary engineering layouts, sketches and reports required to define needed improvements; c) Preparation of preliminary cost estimates of proposed construction and participation in conferences with fiscal advisors and others having an interest or responsibility with regard to the proposed project. Phase 2 - Preparation of detailed plans and specifications - shall include: a) Surveys, preliminary design and layout of the improvements; b) Furnishing the engineering data necessary for applications for routine permits by local , state and federal authorities; c) Preparation of detailed plans, specifications and contract documents for the improvements; d) Preparation of project quantities and cost estimates. Phase 3 - General administration of construction - shall include: a) Assistance in the advertisement of the project for bids; b) Assistance in the opening, tabulation and analysis of the bids received and recommendations as to the appropriate action to be taken; 2- c) Assistance in the preparation of formal contract documents for construction contracts; d) Making periodic visits to the site (as distinguished from the continuous services of a resident Project Representative) to • observe the executed work and to determine in general if the work is proceeding in accordanace with the contract documents. In carrying out this function, it is understood that the Engineer does not guarantee the contractor's performance, nor is he responsible for supervision of the contractor's operation and employees; e) Consulting and advising with the Owner and preparing routine change orders as required; f) Reviewing shop and working drawings furnished by contractors for compliance with design concept and with information given in contract documents (Contractor is responsible for dimensions to be confirmed and correlated at job site); g) Preparation of monthly and final estimates for payments to contractors, and furnishing any necessary certifications as to payments to contractors and suppliers; h) Performing, in company with the representative of the Owner, a final inspection of the project; i ) Revision of construction drawings, with the assistance of the resident Project Representative, to reflect any revisions included in construction records. 3- III. For the basic services performed under Section II of this agree- ment, the compensation to the Engineer shall be eight (8%) percent of the cost of construction for which preparation of .plans and specifica- tions are authorized at one time. Cost of construction, as used herein, shall not include the cost of legal or engineering services, the cost of land, rights-of-way or administrative expense; but does include the direct cost of all construction contracts, including labor, materials and equipment required for the completed work and the total value at site of project, of all labor, materials and equipment purchased or furnished directly by the contracting agency for the project. Upon completion of detailed plans and specifications, and/or the required review by the Owner, eighty percent (80%) of the total basic charge shall be due and payable. The remaining twenty percent (20%) shall be paid after the construction work is completed and accepted by the Owner. For special services such as court litigation and other miscellaneous services not outlined in Section II , the Engineer shall be compensated on the basis of actual salary cost times a multiplier of 2.25; direct expenses and subcontract costs incurred shall be reimbursed at actual cost times a multiplier of 1 .10. Statements for services in this cate- gory shall be rendered monthly and payment shall be due not less than thirty (30) days after submission of a statement. 4- IV. The charge provided herein shall not include property, boundary, and right-of-way surveys; shop, mill , field or laboratory inspection pf materials; cost of test borings and other subsurface explorations; copies of "As Built" plans and specifications in excess of five (5) ; calculations of special assessments; the services of a resident Project Representative for continuous on-the-site observance of the work; or the furnishing of construction line and grade surveys. V. It is understood and agreed that the Owner shall have complete control of the services to be rendered and that no work shall be done under this contract until the Engineer is instructed in writing to proceed with the work. At the time written instructions are given to the Engineer to proceed, evidence shall be furnished that funds are available to pay for the services required. It is also understood that the Engineer will not supply a resident Project Representative for continuous on-the-site observance of the work or-furni-&h—construction•4l-ae-and grade-su+rveys unless instructed in writing to do so. VI . Any provision in this contract notwithstanding, it is specifically understood and agreed that the Engineer shall not authorize or undertake any work pursuant to this contract, which work would require the payment of any charge, expense or reimbursement in addition to the charge stipu- lated in Section III , without having first had and obtained specific 5- Written authority therefor. VII . This contract shall not be assignable in whole or in part without the consent of the Owner. VIII. In connection with all the work outlined or contemplated above, it is agreed that the Owner or the Engineer may cancel or terminate this contract upon thirty (30) days' written notice to the other, with the provision and understanding that immediately upon receipt of notice of such cancellation from either party to the other all work and labor being performed under this contract shall immediately cease, pending final cancellation at the end of such thirty-day period, and further provided that the Engineer shall be compensated in accordance with the terms of this agreement for all work accomplished by him prior to the receipt of notice of such termination. 6- IN WITNESS HEREOF, The City of Wichita Falls has caused these presents to be executed by its authorized representatives, and witness the execution hereof by Biggs & Mathews, Inc. , Consulting Engineers, through J. E. Biggs, Jr., P.E. , President. THE CITY OF WICHITA FALLS ATTEST: By C:2) p--60.0'00q)4) Ger l d G. Fox City'anager City Se€y BIGGS & MATHEWS, INC. Consulting Engineers APPROVED AS TO FORM: By e:;el ^ s E. Biggs, . , P.E. 9 President 7-