Res 1329 7/18/19721
RESOLUTION NO. /J02 '
WHEREAS, the City of Wichita Falls and B & G Utility Construction,
Inc. entered into a contract dated January 25, 1972, wherein said
contractor agreed to construct certain S^nitary Sewer Extensions,
Project 89-168-03; and,
WHEREAS, the City of Wichita Falls and Biggs and Mathews, Consulting
Engineers, entered into a contract dated October 20, 1971, wherein said
Engineers agreed to perform engineering services for construction of
said sanitary sewer extensions; and,
WHEREAS, said engineering and improvements have been completed
in accordance with the plans and specifications; and,
WHEREAS, a change order and a final estimate have been submitted
on this project, which final estimate shows a total amount of work done
as $31 ,389.50, of which $20,843.01 has been paid to the contractor,
leaving a balance due of $10,546.49; and,
WHEREAS, a final statement has been submitted for engineering work
performed, which statement totals $2,511.16, none of which has previously
been paid to the Consultant Engineer, leaving a balance of $2,511.16.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
The construction of such sanitary sewer extensions is accepted by
the City of Wichita Falls, the change order, final estimate, and engineer's
statement are approved, and the City Manager is directed to pay the said
Contractor and Engineer the amounts due as shown on such estimates.
PASSED AND APPROVED THIS the 18th day of July, 1972.
11( ' .
Aet ./
Ar/
MAYOR
ATTEST:
City Clerk
f
E S T I M A T E
City of Wichita Falls January 25, 1972
Ownrr c,,ntract 21',VIt F,10(1
Sanitary Sewer Extensions 89-168-03 30 ,228.90
Project Name t, , t l I
F:tini:lt&• N,). _ _ for the period c.mpietion 'I'intr, Days
F,.,,,,, April 30 I9 72 t„ June 15 I;, 72 A,I,,.I,•,i 120 73
For. _ B; ,& G Utility Const , , Inc,roU .raetor ,ti t . . . 1 1
UNIT
ITEM DESCRIPTION UNIT OF TOTAL WORK
LUMP SUM •AMOUNT
MEASURE PERFO:2MED P
i.
1 . 12" Sewer Pipe 0 ' -4' Depth LF 570 3 .80 $ 2 , 166.00
2 . ! 12" Sewer Pipe 4 ' -6 ' Depth LF 1113 4.05 4,507.65
3 . 12" Sewer Pipe 6' -8' Depth LF 300 4030 1 ,290 .00
4 . 8" Sewer Pipe 0 ' -4' Depth LF I 150 2 .40 360 .00
5 . 8" Sewer Pipe 4 ' -6' Depth LF • 400 2 . 50 1 ,000 .00
60 8" Sewer Pipe 6' -8 ' Depth LF 750 2 .64 1 ,980 .00
7 . 8" Sewer Pipe 8 ' -10 ' Depth LF 540 3 .29 ' 1 ,776.60
8. 4" PVC Pipe Force Main LF i 1817 1 .25 2 ,271.25
9. Standard Manholes EA 8 ' 210 .00 1 ,680 .00
10 . Drop Manhole EA 1 245 .00 245 .00
11 , Extra Depth for Manholes LF 9 24 .00 216.00
12 . Boring & Casing LF 36 14. 50 522.00
13 . Concrete Encasement CY 4 25 .00 100 .00
14, Connection to Existing Manhole LS 25.00
15, Sewage Lift Station & Wet Well LS 12,500 .00
1A . Rock Excavation LS 750 .00
A,; r c, 'i: i 31 389 .50
M
l.,tal Am uln! of Work Done w '
i G G S t I'i A i--i .W S
I,
CONSULTING ENC-INErRS 1'31,389 .50
4017 F\ITH ROAD -- V'%i,'''E 692.1071 li ,,e,-. 0 Iif,talripii . .
ii:, 31 ,389 .50
July 7 72
IIIff,'1-,•n,•c (.A:uuur! I'LLY:;hie ,Un I •• I,trart) . . .
II: ,
n r 1,
0 4 01283
A o.,n.c,i Z l'(ref." .ii j I,,s> Previous (':Innent,
Cp
ON OWNER j',
11;,.,A35 . .l'J 1 11„nnt 'hat' 011 C01Itra0L 'Phis F:`,tnnat„
10 ,546.49
BIGGS & MATHEWS
REGISTERED PROFESSIONAL CIVIL ENGINEERS N°7 4P 8 0
LICENSED STATE LAND SURVEYORS
N° U
REGISTERED PUBLIC SURVEYORS
July 10 , 1972
4017 FAITH ROAD
City of Wichita Falls WICHITA FALLS, TEXAS 76308
Wichita Falls , Texas
RETURN COPY OP INVOICE
WITH REMITTANCE
Engineering fees due to plans , specifications ,
and supervision of Sanitary Sewer Extensions
to Allis-Chalmers Plant , Project No . 89168«03
8% of Final Construction Cost of $31,389.50 , . . . $2,511.16
BIGGS & MATHEWS
4017 RAITH ROAD
WICHITA FALLS. TEXAS
76308
CONTRACT CHANGE ORDER -
FINAL
JUNE 20, 1972
Contract for Sanitary Sewer Extensions
City of Wichita Falls , Project No. 89-168.03
To: B & G Utility Construction, Inc.
You are hereby requested to comply with the following
changes from the contract plans and specifications :
Item Description Decrease In Increase In
Contract Price Contract Price
4. 8" Sewer Pipe 0 '.4' Depth
Deduct 10 LF 24,00
5. 8" Sewer Pipe 4' .-6' Depth
Deduct 280 LF 700 .00
6. 8" Sewer Pipe 6 ' -5 ' Depth
Deduct 130 LF 343.20
7. 8" Sewer Pipe 8' -10 ' Depth
Add 420 LF 1,381.80
11. Extra Depth for Manholes
Add 4 LF 96.00
1A. .Payment for solid rock excavation
due to the lowering of the 8" line
from Station 38/00 to Station 56/40 750 .00
1 ,067.20 2,227 .80
Net Chance in Contract Price 1,160 .60
BIGGS & MATHEWS
4017 FAITH ROAD
WICHITA FALLS, TEXAS
76908
The Contract Total will be Thirty-one Thousand
Three Hundred Eighty-nine and 50/100 Dollars ($31,389.50) ,
This document will become a supplement to the Contract
and all provisions will apply hereto.
Approved:
City of Wichita Fall
By P (/ a r 16 Date
Biggs R Mathews
By Date 7..10 -. 71,
B F- G Utility Construction, Inca
By ' Date 2 /.