Res 1329 7/18/19721 RESOLUTION NO. /J02 ' WHEREAS, the City of Wichita Falls and B & G Utility Construction, Inc. entered into a contract dated January 25, 1972, wherein said contractor agreed to construct certain S^nitary Sewer Extensions, Project 89-168-03; and, WHEREAS, the City of Wichita Falls and Biggs and Mathews, Consulting Engineers, entered into a contract dated October 20, 1971, wherein said Engineers agreed to perform engineering services for construction of said sanitary sewer extensions; and, WHEREAS, said engineering and improvements have been completed in accordance with the plans and specifications; and, WHEREAS, a change order and a final estimate have been submitted on this project, which final estimate shows a total amount of work done as $31 ,389.50, of which $20,843.01 has been paid to the contractor, leaving a balance due of $10,546.49; and, WHEREAS, a final statement has been submitted for engineering work performed, which statement totals $2,511.16, none of which has previously been paid to the Consultant Engineer, leaving a balance of $2,511.16. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The construction of such sanitary sewer extensions is accepted by the City of Wichita Falls, the change order, final estimate, and engineer's statement are approved, and the City Manager is directed to pay the said Contractor and Engineer the amounts due as shown on such estimates. PASSED AND APPROVED THIS the 18th day of July, 1972. 11( ' . Aet ./ Ar/ MAYOR ATTEST: City Clerk f E S T I M A T E City of Wichita Falls January 25, 1972 Ownrr c,,ntract 21',VIt F,10(1 Sanitary Sewer Extensions 89-168-03 30 ,228.90 Project Name t, , t l I F:tini:lt&• N,). _ _ for the period c.mpietion 'I'intr, Days F,.,,,,, April 30 I9 72 t„ June 15 I;, 72 A,I,,.I,•,i 120 73 For. _ B; ,& G Utility Const , , Inc,roU .raetor ,ti t . . . 1 1 UNIT ITEM DESCRIPTION UNIT OF TOTAL WORK LUMP SUM •AMOUNT MEASURE PERFO:2MED P i. 1 . 12" Sewer Pipe 0 ' -4' Depth LF 570 3 .80 $ 2 , 166.00 2 . ! 12" Sewer Pipe 4 ' -6 ' Depth LF 1113 4.05 4,507.65 3 . 12" Sewer Pipe 6' -8' Depth LF 300 4030 1 ,290 .00 4 . 8" Sewer Pipe 0 ' -4' Depth LF I 150 2 .40 360 .00 5 . 8" Sewer Pipe 4 ' -6' Depth LF • 400 2 . 50 1 ,000 .00 60 8" Sewer Pipe 6' -8 ' Depth LF 750 2 .64 1 ,980 .00 7 . 8" Sewer Pipe 8 ' -10 ' Depth LF 540 3 .29 ' 1 ,776.60 8. 4" PVC Pipe Force Main LF i 1817 1 .25 2 ,271.25 9. Standard Manholes EA 8 ' 210 .00 1 ,680 .00 10 . Drop Manhole EA 1 245 .00 245 .00 11 , Extra Depth for Manholes LF 9 24 .00 216.00 12 . Boring & Casing LF 36 14. 50 522.00 13 . Concrete Encasement CY 4 25 .00 100 .00 14, Connection to Existing Manhole LS 25.00 15, Sewage Lift Station & Wet Well LS 12,500 .00 1A . Rock Excavation LS 750 .00 A,; r c, 'i: i 31 389 .50 M l.,tal Am uln! of Work Done w ' i G G S t I'i A i--i .W S I, CONSULTING ENC-INErRS 1'31,389 .50 4017 F\ITH ROAD -- V'%i,'''E 692.1071 li ,,e,-. 0 Iif,talripii . . ii:, 31 ,389 .50 July 7 72 IIIff,'1-,•n,•c (.A:uuur! I'LLY:;hie ,Un I •• I,trart) . . . II: , n r 1, 0 4 01283 A o.,n.c,i Z l'(ref." .ii j I,,s> Previous (':Innent, Cp ON OWNER j', 11;,.,A35 . .l'J 1 11„nnt 'hat' 011 C01Itra0L 'Phis F:`,tnnat„ 10 ,546.49 BIGGS & MATHEWS REGISTERED PROFESSIONAL CIVIL ENGINEERS N°7 4P 8 0 LICENSED STATE LAND SURVEYORS N° U REGISTERED PUBLIC SURVEYORS July 10 , 1972 4017 FAITH ROAD City of Wichita Falls WICHITA FALLS, TEXAS 76308 Wichita Falls , Texas RETURN COPY OP INVOICE WITH REMITTANCE Engineering fees due to plans , specifications , and supervision of Sanitary Sewer Extensions to Allis-Chalmers Plant , Project No . 89168«03 8% of Final Construction Cost of $31,389.50 , . . . $2,511.16 BIGGS & MATHEWS 4017 RAITH ROAD WICHITA FALLS. TEXAS 76308 CONTRACT CHANGE ORDER - FINAL JUNE 20, 1972 Contract for Sanitary Sewer Extensions City of Wichita Falls , Project No. 89-168.03 To: B & G Utility Construction, Inc. You are hereby requested to comply with the following changes from the contract plans and specifications : Item Description Decrease In Increase In Contract Price Contract Price 4. 8" Sewer Pipe 0 '.4' Depth Deduct 10 LF 24,00 5. 8" Sewer Pipe 4' .-6' Depth Deduct 280 LF 700 .00 6. 8" Sewer Pipe 6 ' -5 ' Depth Deduct 130 LF 343.20 7. 8" Sewer Pipe 8' -10 ' Depth Add 420 LF 1,381.80 11. Extra Depth for Manholes Add 4 LF 96.00 1A. .Payment for solid rock excavation due to the lowering of the 8" line from Station 38/00 to Station 56/40 750 .00 1 ,067.20 2,227 .80 Net Chance in Contract Price 1,160 .60 BIGGS & MATHEWS 4017 FAITH ROAD WICHITA FALLS, TEXAS 76908 The Contract Total will be Thirty-one Thousand Three Hundred Eighty-nine and 50/100 Dollars ($31,389.50) , This document will become a supplement to the Contract and all provisions will apply hereto. Approved: City of Wichita Fall By P (/ a r 16 Date Biggs R Mathews By Date 7..10 -. 71, B F- G Utility Construction, Inca By ' Date 2 /.