Loading...
Res 1310 5/22/1972RESOLUTION NO. /J,' BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: That certain contract, a copy of which is attached hereto, between the City of Wichita Falls and Wichita County Water Improve- ment District No. 2, as first party, and Biggs & Mathews, consulting engineers, as second party, providing for a preliminary engineering study and report concerning the dam and spillway at Diversion Lake is hereby approved, and the City Manager is authorized to execute the same for the City. PASSED AND APPROVED THIS the (LO7i may of 1972. ai,,e4yued/-- MAYOR ATTEST: kLLt2jk, ,,XO/a-c_A!-a--) City Clerk STATE OF TEXAS COUNTY OF WICHITA 0 This Contract , made and entered into. as of the 22nd day of May 1972, by and between the City of Wichita Falls and Wichita County Water Control and Improve- ment District No. 2 ( hereinafter called 'Owners") and the firm of Biggs & Mathews , Consulting Engineers , Wichita Falls, Texas (hereinafter called "Engineer") WITNESSETH: WHEREAS, the existing dam and spillway at Lake Diversion, Archer County , Texas are in a deteriorated condition and in need of repair; and WHEREAS , the firm of Biggs & Mathews is acceptable to Owners and is willing to enter into a contract to perform engineering services required by the Owners; NOW, THEREFORE, it is agreed as follows : I. The Owners hereby retain the Engineer to prepare a preliminary analysis and report to determine the extent of the safety of the structure and to propose methods of 1- of repair together with cost estimates . II . The services to be performed by the Engineer shall be as follows : a) Employ a competent Engineering Testing Laboratory to make all field and laboratory tests as necessary to determine the strengths and safety factors of the structure . b) Perform the detailed calculations required and report the findings . c) Perform all hydraulic calculations using the available data. d) Employ outside Structural Consultants who are reinforced concrete experts from the University of Texas at Austin. e) Recommend a method or methods of repair for the structure . f) Prepare detailed cost estimates for the proposed repairs . g) Prepare a detailed Engineering Report of the above and furnish , to the Owners , 25 copies of same. III., For the basic services performed under Section II of 2.- of this agreement , the compensation to the Engineer shall be $7,500 .00 payable by the Owners to the Engineer within forty-five (45) calendar days after acceptance of the report by the Owners . IV. It is understood and agreed that the work proposed under Section II shall be completed within four (4) months after this contract has been executed by all parties and the Owners have authorized the Engineer, in writing, to proceed. V. Should the Owners retain the Engineer to prepare detailed construction plans and specifications for the Lake Diversion Structure after completion of the Prelim- inary Engineering Report , the Engineer will credit the Owners a sum of $4,000.00 against the fee for preparing the construction plans and specifications , providing the Owners and Engineer enter into a standard engineering contract that is normal and usual for such work. If executed within two years after completion of the preliminary report , the future contract shall delineate the compensation to be paid to the Engineer as follows : Basic Fee to be determined as a percentage of construction cost. 3•• Total Actual Construction Cost Fee 200 ,000 7.7 300,000 742 400 ,000 6.9 500 ,000 6.6 600 ,000 6.4 700 ,000 6.3 800,000 6.1 900 ,000 6.0 1 ,000 ,000 5.9 The fee for project costs falling between the figures as shown shall be interpolated to the nearest one-tenth of one percent . Miscellaneous Services - In addition to the basic engineering fee, the Engineer shall provide a competent resident project representative for the actual salary costs times a multiplier of 1 .60. For direct expenses and subcontract costs , the Engineer shall be reimbursed for actual costs times a multiplier of 1.10. VI . This Contract shall not be assignable in whole or in part without the consent of the Owners . 4- IN WITNESS HEREOF, the City of Wichita Falls and the Wichita County Water Control and Improvement District No. 2 have caused these presents to be executed by their authorized representatives and witness the execution hereof by Biggs & Mathews , Consulting Engineers , through J. E. Biggs , Jr. , P.E. , Partner. THE CITY OF WICHITA FALLS ATTEST : 0At.XeCAP#By L4 Gera d G. Fox 11 1 City B 5i C'l-c,,_ City Manager WICHITA COUNTY WATER CONTROL AND IMPROVEMENT DISTRICT NO. 2 A YB 1 Bing Mi er retary President BIGGS & MATHEWS Consulting Engineers By 5.41.94, . J. E. Biggs, . Partner 5-