Res 1590 10/22/1974RESOLUTION NO. 5
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS,
TEXAS, THAT:
The provisions of Minute Order Numbers 69329, 69330, 69331 and 69332
passed by the Texas Highway Commission on October 1 , 1974, copies of which are
attached hereto, and are made a part thereof, providing for signalization improve-
ments at the intersections of Fairway Boulevard and Kell Boulevard, Kemp Boule-
vard and Maplewood Avenue, Midwestern Parkway and Hampstead Lane, Kell Boulevard
and Brook Avenue, Kell Boulevard and Harrison Street and Kell Boulevard at Taft
Boulevard, the terms of which are acceptable to the City of Wichita Falls. It
is hereby ordered that the City of Wichita Falls cooperate with the Texas High-
way Department and fulfill its obligation so stipulated in said Minute Orders as
being the responsibilities of the City.
Rr r.r r':i;I'HER k: '''13Y T{1' ; ALOE.'.H' or THE CITY OF WICHITA
FALLS, TEXAS, THAI :
The City Manager of the City of Wichita Falls is hereby authorized to
execute said agreement.for the City.
PASSED AND APPROVED THIS THEoLgAebAY OF dLleT :44 / , 1974
MAYOR
ATTEST:
City Clerk
II y•I u. !I nnrl WAnl
I-w . Y:Ir111
WICHITA t• I ,
ORDER3MINLITE hJRDER.
P„ge 1 ,,t
WHEREAS, in WICHITA COUNTY, the City of Wichita Falls has requested assistance in
Signalization at the intersections of Fairway Boulevard at Kell Boulevard and U. S.
Highway 82-277 Interchange; and
WHEREAS, Fairway Boulevard is included in the Urban System; and
WHEREAS, It is the desire of the Texas Highway Department to assist the City of
Wichita Falls in such work;
NOW, THEREFORE, the State Highway.Engineer is directed to tender the following proposal
to the City of Wichita Falls:
Provided the City will:
1. Maintain and operate the installations upon completion in a manner satisfactory
to the Department.
2. Adopt and enforce such ordinances and regulations as may be necessary for
proper operation of the installations.
Subject to the. availability of. Federal-aid Urban System funds and the eligibility of
the proposed work for financing with said funds, the Texas Highway Department will:
I. Prepare construction plans and specifications.
2. Provide for Installation'of Traffic Signals at an estimated cost. of $42,000
as authorized in the Texas Highway Department 1974 Urban System Program.
Upon acceptance of the provisions of this Order by the appropriate officials of the
City of Wichita Falls, IT IS ORDERED that Fairway Boulevard extending from Kell Boulevard,
North to U. S. Highway 82-277, a distance of approximately 0.8 mile, be and is hereby
designated as a METROPOLITAN HIGHWAY and the State Highway Engineer is directed to enter
into agreement with the City covering the details of'the proposed improvements and to
proceed with the engineering development of the project and with construction as author-
ized herein in the most feasible and economical manner.
This Order shall become operative upon acceptance by the City of Wichita Falls and if
not accepted within 90 days of the date hereof, the action herein contained shall be
automatically cancelled.
nlnninc I by-Examined and recommended by:
ill,.) Program Engineer Approved - - Ascistant State Highway Engineer --- _ - -
State Highway Engineer
Appriwcd:
4CommissionerMinuteNumber6`9
Commissioner Date Passed OCT 1 74
onunissioncr
I .II Ii.',ry ll'lulrinn•nl
c r'.nyr .tan I:
WICHITA county
IT•.I r r, IV n, 3 MIN UTE ORDER Page 1 4
WHEREAS, in WICHITA COUNTY, the City of Wichita Falls has requested assistance in Signali-
zation and Channelization at the intersection of Kemp Boulevard and Maplewood Avenue; and
WHEREAS, Kemp Boulevard is included in the Urban System; and
WHEREAS, it is the desire of the Texas Highway Department to assist the City of
Wichita Falls in such work;
NOW, THEREFORE, the State Highway Engineer is directed to tender the following proposal to
the City of Wichita Falls:
Provided the City will:
1. Provide for the adjustment of utilities as may be required.
2. Maintain all of the work constructed as part of the project and operate the in-
stallations in a manner satisfactory to the Department.
3. Adopt and enforce such ordinances and regulations as may be necessary for proper
operation of the installations.
Subject to the availability of Federal-aid Urban System funds and the eligibility of the
proposed work for financing with said funds, the Texas Highway Department will:
1. Prepare construction plans and specifications.
2. Provide for Installation of Traffic Signals and Channelization at an estimated cost
of $26,700 as authorized in the Texas Highway Department 1974 Urban System Program.
Upon acceptance of the provisions of this Order by the appropriate officials of the City
of Wichita Falls, IT IS ORDERED that Kemp Boulevard extending from Midwestern Parkway to
Kell Boulevard, a distance of approximately 1.1 miles, be and is hereby designated as a
METROPOLITAN HIGHWAY and the State Highway Engineer is directed to enter into agreement
with the City covering the details of the proposed improvements and to proceed with the
engineering development of the project and with construction as authorized herein in the
most feasible and economical manner.
This Order shall become operative upon acceptance by the City of Wichita Falls and if not
accepted within 90 days of the date hereof, the action herein contained shall be auto-
matically cancelled.
Sidmu{Ied by Examined and recommended by
Till.) Program Engineer Approved Assistant State Highway Engineer
State Highway Engineer
Ap)nrvcii
69330CommissionerMinuteNumber___ .
Commissioner Date Passed OCT 1 74
unniti.`caner
i ..ri , :':iirii
WICHITA
3 MIN r'I. 1-1 ORDER Page 1 1 i:,,:
riiO,,,tNn.
WHEREAS, in WICHITA COUNTY, the City of Wichita Falls has requested assistance in
Signalization at the intersection of Midwestern Parkway and Hampstead Lane; and
WHEREAS, Midwestern Parkway is included in the Urban System; and
WHEREAS, it is the desire of the Texas Highway Department to assist the City of Wichita
Falls in such work;
NOW, THEREFORE, the State Highway Engineer is directed to tender the following proposal
to the City of Wichita Fe1lat
Provided the City will:
1. Maintain and operate the installations upon completion in a manner satisfactory
to the Department.
2. Adopt and enforce such ordinances and regulations as may be necessary for
proper operation of the installations.
Subject to the availability of Federal-aid Urban System funds and the eligibility of
the proposed work for financing with said funds, the Texas Highway Department will:
1. Prepare construction plans and specifications.
2. Provide for Installation, of Traffic Signals at an estimated cost of $20,000
as authorized in the Texas Highway Department 1974 Urban System Program.
Upon acceptance of the provisions of this Order by the appropriate officials of the City
of Wichita Falls, the State Highway Engineer to directed to enter into agreement with the
City covering the details of the proposed improvements and to proceed with the engineer-
ing development of the project and with construction as authorized herein in the most
feasible and economical manner.
This Order shall become operative upon acceptance by the City of Wichita Falls and if
not accepted within 90 days of the date hereof, the action herein contained shall be
automatically cancelled.
Snhriniied by:Examined and recommended by:
mooll') Program Engineer Approved Assistant State Highway Engineer
State Highway Engineer
Appiuved:
ununic:iuifer Minute Nnnlhei
69331
brnmissiuner Dale P,ssid OCT i. 74
1/nlnlisciunCr
Cv„4w Iligliwav I).Imrin%rnt
I.1`•ru. :I:14)II
WICHITA
I)itilri.'I-No 3 MIN 1 rI . ORDER rag.. L ,. 1 Pages
WHEREAS, in WICHITA COUNTY, the City of Wichitn Falls has requested assistance in
Signalization at the intersection of Kell Boulevard at Brook Avenue, Harrison Avenue
and Taft Boulevard; and
WHEREAS, it is anticipated that Brook Avenue, Harrison Avenue and Taft Boulevard will be
included in the Urban System; and
WHEREAS, it is the desire of the Texas Highway Department to assist the City of WichitaFallsinsuchwork;
NOW, THEREFORE, the State Highway Engineer is directed to tender the following proposal
to the City of Wichita Falls:
Provided the City will:
1. Maintain- and operate the installations upon .completion in a manner satisfactory
to the Department.
2. Adopt and enforce such ordinances and regulations as may be necessary for proper
operation of the installations.
Subject to the availability of Federal-aid Urban System funds and the eligibility of
the proposed work for financing with said funds, the Texas Highway Department will:
1. Prepare construction plans and specifications.
2. Provide for Installation of Traffic Signals at an estimated cost of $51,000 as
authorized in the Texas Highway Department 1974 Urban System Program.
Upon acceptance of the provisions of this Order by the appropriate officials of the City
of Wichita Falls, the State Highway Engineer is directed to enter into agreement with the
City covering the details of the proposed improvements and to proceed with the engineer-
ing development of the project and with construction as authorized herein in the most
feasible and economical manner.
This Order shall become operative upon acceptance by the City of Wichita Falls and if
not accepted within 90 days of the date hereof, the action herein contained shall be
automatically cancelled.
Suhnnnr'I hv:1?.xamincd and recommended by:
mum Program Engineer Approved Assistant State Highway Engineer
State Highway Engineer
Approved:
Commissioner Ntinute Number
Commissioner Date Passed OCT 1 74
Commissioner