Res 1742 12/2/1975RESOLUTION NO. /7 RESOLUTION APPROVING CONTRACT WITH BIGGS & MATHEWS , INC. FOR ENGINEERING SERVICES ON SANITARY SEWER FACILITIES TO SERVE LOCKWOOD COMPANY INDUSTRIAL PLANT. BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS , TEXAS, THAT: That certain contract, a copy of which is attached hereto, between the City of Wichita Falls and Biggs & Mathews, Inc. , consulting engineers , for engineering services required in connection with construction of sanitary sewer line facilities and sewerage lift station to serve the Lockwood Company Industrial Plant north of Wichita Falls , is hereby approved, and the City Manager is authorized to execute the same for the City of Wichita Falls. PASSED AND APPROVED this the 18th day of November, 1975. J O R F 0T ATTEST : A ),"' CITY CL RK STATE OF TEXAS COUNTY OF WICHITA This Contract , made and entered into as of the day of November, 1975 , by and between the City of Wichita Falls , Wichita County, Texas (hereinafter called "Owner" ) and the firm of Biggs & Mathews ; Inc. , Consulting Engineers , Wichita Falls , Texas (hereinafter called Engineer" ) WITNESSETH: WHEREAS , sanitary sewer line facilities and a sewerage lift station to serve the Lockwood Company Industrial Plant north of the City of Wichita Falls , Texas is proposed; and WHEREAS , the firm of Biggs & Mathews , Inc . , is acceptable to the Owner and is willing to enter into a contract to perform engineering services required by the Owner ; NOW THEREFORE, it is agreed as follows : I . The Owner hereby retains the Engineer for all engineering services required in connection with construction of the sanitary sewer line and lift station. The services performed by the Engineer in connection with proposed improvements shall be divided into three phases , as follows : 1- Phase 1 - Preliminary study and design necessary to outline those improvements required. Phase 2 - Preparation of detailed plans and specifications for improvements included under Phase 1. Phase 3 - General administration of construction of improvements included under Phase 2 . Phase 1 - Preliminary study and design - shall include : a) Participation in preliminary conferences with the Owner regarding the proposed project ; b) Preparation of preliminary engineering layouts , sketches and reports required to define needed improvements ; c) Preparation of preliminary cost estimates of proposed construction and participation in conferences with the Owner' s staff and others having an interest or responsibility with regard to the proposed project. Phase 2 - Preparation of detailed plans and specifications - shall include : a) Establishing the scope of any soil and foundation investi- gations which may be required and assisting in making the necessary arrangements to be conducted for the Owner' s account ; b) Surveys, preliminary design and layout of the improvements ; 2- I c) Furnishing the engineering data necessary for applications for routine permits by local , state and federal authorities ; d) Preparation of detailed plans , specifications and contract documents for the improvements ; e) Preparation of project quantities and cost estimates ; f) Furnish to the Owner all necesary copies of approved plans , specifications , notices to bidders and proposal forms. Phase 3 - General administration of construction - shall include: a) Assistance in the advertisement of the project for bids ; b) Assistance in the opening, tabulation and analysis of the bids received and recommendations as to the appropriate action to be taken; c) Assistance in the preparation of formal contract documents for construction contracts ; d) Making periodic visits to the site (as distinguished from the continuaus services of a resident Project Representative) to observe the executed work and to determine in general if the work is proceeding in accordance with the contract documents. In carrying out this function, it is understood that the Engineer does not guarantee the contractor' s performance , nor is he responsible for supervision of the contractor' s operation and employees ; 3- e) Consulting and advising with the Owner and preparing routine change orders as required; f) Reviewing shop and working drawings furnished by contractors for compliance with design concept and with information given in contract documents (Contractor is responsible for dimensions to be confirmed and correlated at job site) ; g) Preparation of monthly and final estimates for payments to contractors , and furnishing any necessary certifications as to payments to contractors and suppliers ; h) Performing, in company with the representative of the Owner, a final inspection of the project ; i) Revision of construction drawings , with the assistance of the resident Project Representative , to reflect any revisions included in construction records . j ) Furnish Owner with one (1) reproducible set of "As Built" construction drawings on Mylar Sepia Film and two (2) sets of prints . II . For the basic services performed under Section I of this agreement , the compensation to the Engineer shall be expressed as a percent of the cost of construction for which preparation of plans and specifications are authorized at one time and shall be 8 . 0 percent of the construction cost. 4- Cost of construction, as used herein, shall not include the cost of legal or engineering services , the cost of land, rights-of-way or administrative expense ; but does include the direct cost of all construction contracts , including labor, materials and equipment required for the completed work and the total value at site of project , of all labor, materials and equipment purchased or furnished directly by the City for the project. Upon completion of detailed plans and specifications , and/or the required review, eighty percent (80%) of the total basic charge shall be due and payable . The remaining twenty percent (20%) shall be paid during construction in proportion to the contractor' s earning. For special services such as court litigation and other miscellaneous services not outlined in Section II , the Engineer shall be compensated on the basis of actual salary cost times a multiplier of 2 . 25 ; direct expenses and subcontract costs incurred shall be reimbursed at actual cost times a multiplier of 1.10. Statements for services in this category shall be rendered monthly and payment shall be due not less than thirty (30) days after submission of a statement. 5- III. The charge provided herein shall not include property, boundary, and right-of-way surveys , shop, mill , field or laboratory inspection of materials ; cost of test borings and other subsurface explorations ; copies of "As Built" plans and specifications in excess of three ( 3) ; calculations of special assessments ; the services of a resident Project Representative for continuous on-the-site observance of the work; or the furnishing of construction line and grade surveys . If the Owner elects to have the Engineer furnish services of a resident Project Representative for continuous on-the-site observance of the work or the furnishing of construction line and grade surveys , the Engineer will furnish this service at the actual salary cost of personnel thus engaged times a multiplier of 1. 75 ; direct expenses and subcontract cost incurred shall be reimbursed at actual cost times a multiplier of 1.10. If, during preparation of the plans and specifications , or thereafter, the Engineer shall be required to render additional services because of changes, or delays , or other causes beyond his control , then the Engineer shall be compensated for such additional services on the basis of actual salary cost of such additional services times a multiplier of 2 . 25 , with direct expense reimbursed at actual cost times a multiplier of 1.10 . 6- IV , It is understood and agreed that the Owner shall have complete control of the services to be rendered and that no work shall be done under this contract until the Engineer is instructed in writing to proceed with the work. At the time written instructions are given to the Engineer to proceed, evidence shall be furnished that funds are available to pay for the services required. It is also understood that the Engineer will not supply a resident Project Representative for continuous on-the-site observance of the work or furnish construction line and grade surveys unless instructed in writing to do so. V. Any provision in this contract notwithstanding, it is specifically understood and agreed that the Engineer shall not authorize or undertake any work pursuant to this contract , which work would require the payment of any charge, expense or reimbursement in addition to the charge stipulated in Section III , without having first had and obtained specific written authority therefor. VI . This contract shall not be assignable in whole or in part without the consent of the Owner. VII. All payments for services rendered by the Engineer shall become due and payable within thirty (30) days after submission of a statement by the Engineer. 7- VIII. In connection with all the work outlined or contemplated above , it is agreed that the Owner or the Engineer may cancel or terminate this contract upon thirty (30) days ' written notice to the other, with the provision and understanding that immediately upon receipt of notice of such cancellation from either party to the other all work and labor being performed under this contract shall immediately cease , pending final cancellation at the end of such thirty-day period, and further provided that the Engineer shall be compensated in accordance with the terms of this agreement for all work accomplished by him prior to the receipt of notice of such termination. 8- IN WITNESS HEREOF, The City of Wichita Falls , Texas has caused this contract to be executed by its City Manager and attested by its City Clerk, and Biggs & Mathews , Inc. , Consulting Engineers , has caused this contract to be executed by its President and its Vice President , with all such executions being in triplicate , each of which shall constitute and original , and all of which has been done as of the date here above first written. CITY OF WICHITA FALLS By City Manager ATTEST: City Clerk BIGGS & MATHEWS , INC. Consulting Engineers• By ttom P E• J. . Biggs , r. , P.E. , President Registered Professional Engineer ATT T: No. 16101 Vice President 4 9-