Res 1709 9/2/1975RESOLUTION NO. /V9. RESOLUTION APPROVING FINAL ESTIMATE AND ACCEPTING IMPROVEMENTS AT THE WICHITA FALLS MUNICIPAL AIRPORT, PHASE I . WHEREAS, the City of Wichita Falls and Interstate Paving Corporation entered into a contract dated May 30, 1974, wherein said contractor agreed to construct certain improvements at the Wichita Falls Municipal Airport; and WHEREAS, said improvements have been completed in accordance with plans and specifications and as determined by the City Engineer, and WHEREAS, the final estimate has been submitted on this project, which final estimate shows a total amount of work done as $110,440. 12 of which 98,996. 11 has been paid to the contractor, leaving a balance of $11 ,444.01 . NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS: The improvements at said Wichita Falls Municipal Airport are accepted by the City of Wichita Falls , the final estimate is approved, and the City Manager is directed to pay the said contractor the amount due as shown on such estimate. PASSED AND APPROVED THIS THE 2ND DAY OF SEPTEMBER, 1975. MAYOR ATTEST: i d tlec, f i ty Clerk 1 PROJECT IMPROVEMENTS TO THE WICHITA FALLS MUNICIPAL AIRPORT CONTRACTOR INTERSTATE PAVING CORPORATION MONTHLY ESTIMATE NO. 5 and Final PROJECT NO. 8-48-0227-01 ONTRACT AMOUNT $109 ,463. 15 CONTRACT WORKING DAYS 75 WORKING DAYS USED 75 t-R CENT OF WORK COMPLETED 100 PER CENT OF TIME USED 100 DATE August 28, 1975 FOR PERIOD ENDING: April 30, 1975 I;,m L., Unit of Project Total Mork Don. Contract Ha f 11.m Amount Measure Estimate Ounantiit.a on Contract Price 1_..1 UnclassifLed FxravatLon C.Y. 560 555 5 5n 3.052.50 2_ S tbbas Co crsp r Y 311 317.50 5.00 1 ,587.50 R Agpregate-Bituminous Rasp rnurce Tnns 343 389.58 14. 00 6`454. 1? Bituminous Material Tnns 17 7 18.62 65,0.0 1 .210. 30 5 Aa. V 11. 118 197.70 1 2 .. . 6 Bituminous Material Tons 9.9 6 .83 65.00 638.95 7 Portland Cement Concrete Pavement S .Y. ] 4629 4629 1550 71 ,749.50 8 Bituminous Prime Coat Gal . 280 270 0. 50 135.00 9 Fence, Class E (5' ) L. F. 312 311 .4 SAO 1 ,557.00 10 Driveway Gates (5') Each 2 2 300.00 600.00 11 Fence Class E (4' ) L. F. 408 408.5 4.00 1 ,634.00 12 Pullboxes Each _ 2 2 709,.0 12400.00 13 Cable Trench L. F. 430 422 0. 30 126.60 4 Underground Cable in Trench r L. F. 1167 667 1 ,25 833.75 15 Underground Cable in Duct L. F. 279 450 5. 00 2,250.00 16 I Bare Counterpoise Wire- Installed L. F. 480 480 1 . 00 480.00 17 1 Multi -Way Electrical Duct L. F. 48 48 10.00 480.00 18 , Taxiway Lights , Removed and Relocatec Each 10 10 75.00 750.00 19 Security Lighting Assemblies Lump Sum 1 ,500.00 1 ,500.00 2.0 Salvaging & Replacing Base f S.Y. 4629 4629 2.60 _ 12,035.40 Charge Account 97-777-7nln Total Amount of Work Done 110,440.12 Prepared by Elton E. Adams Field Superintendent Less Retainage 0- Difference 110,440. 12 t/27- " Submitted. by Richard C. Scott , P . E. City Engineer Less Special Deductions 0- Less Liquidated Damage 0- Less Previous Payments 98,996. 11 Approved by: Paul Yeager Amount Due This Estimate 11 ,444.01 Director of Public Safety