Res 2023 10/18/1977r
RESOLUTION NO. „21/,,,
RESOLUTION PROVIDING FOR THE CONSTRUCTION OF HARDING
STREET FROM WICHITA FALLS EAST CITY LIMIT AT COTTONWOOD
ROAD AND HARDING STREET
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA
FALLS, TEXAS, THAT:
The provisions of Minute Order No. 73407 passed by the State
Highway and Public Transportation Commission on September 29, 1977, a copy
of which is attached hereto, and is made a part thereof, providing for the
construction of Harding Street from Wichita Falls East City Limit at Cotton-
wood Road and Harding Street, east along Harding Street to proposed Farm to
Market Road at Clay County Line, a distance of approximately 1 .4 miles are
acceptable to the City of Wichita Falls . It is hereby ordered that the City
of Wichita Falls cooperate with the State Department of Highways and Public
Transportation and fulfill its obligation so stipulated in said Minute Order
as being the responsibility of the City.
PASSED AND APPROVED THIS THE 18TH DAY OF OCTOBER, 1977.
14;;;),e/4
MAYOR
4fl'()4
ATTEST:
City Clerk
76/
uuu.1.io-n Kew.M•)A t • x
ANI) i'IIIII.i(' •I +lANS1'OHIAIION
WICHITA
t
District No. ._. 3 MINI "E ORDER aR t._ l L.,.••
In WICIIITA COUNT`.. a FARM TO MARKET ROAD is hereby designated extending
from Wichita Falls East City Limit at Cottonwood Road and Harding Street,
East along Harding Street to proposed Farm to Market Road at Clay CountyLine, a distance of approximately 1.4 miles, subject to the condition
that Wichita County and the City of Wichita Falls will furnish all re-
quired right of way clear of obstructions and free of cost to the State
and acquisition procedures will be in accordance with applicable Federal
and State laws governing the acquisition policies for acquiring real pro-
perty.
At such time as Wichita County and the City of Wichita Falls shall accept
the provision of this Order and agree to the furnishing of the required
right of way, the Engineer-Director is directed to proceed with the en-
gineering development, Relocation Assistance at an estimated cost of
3,000, and construction of the project in the most feasible and economi-
cal manner at an estimated cost of $142,200 as authorized in the 1977
Texas Farm to Market Road and Safer Off System Roads Program, and to
assume the road for State maintenance upon completion of the construction.
This Order is subject to acceptance by Wichita County and the City of
Wichita Falls and if not accepted within 90 days of the date hereof, the
action herein contained shall be automatically cancelled.
tiubwillcd by Examined and icr ununcndcd by
Title)
Program Engineer Appnwcd Ass,stall I•nKineer-Director
i IIginw•r Director
Approved.
t'unuui, uiner Minute Number 73407
D.IlePavwd SEP 29 77
t'U 111 I111'NI)nPt