Res 2180 7/11/1978F
RESOLUTION NO. 2180
RESOLUTION APPROVING. CONTRACT WITH FREESE AND
NICHOLS, INC. , CONSUL.TING ENGINEERS, FOR
WATER RESOURCE STUDIES.
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF
WICHITA FALLS, TEXAS, THAT:
That certain contract, a copy of which is attached hereto,
between the City of Wichita Falls and Texas Electric Service
Company and Freese and Nichols, Inc. , whereby such consulting
engineering firm will provide engineering services concerning
potential reservoir sites capable of serving the City and Texas
Electric Service Company, is hereby approved, and the City Mana-
ger is authorized to execute the same for the City of Wichita
Falls.
PASSED AND APPROVED this the 11th day of July, 1978 .
M A Y O R
74.;
ATTEST:
City Clerk
c
STATE OF TEXAS
COUNTY OF WICHITA
THIS CONTRACT made and entered into this day of
1978, by and between the City of Wichita Falls , Texas , and Texas Electric
Service Comapny, hereinafter called "party of first part" acting by
and through their present managers , and Freese and Nichols , Inc. , Con-
sulting Engineers hereinafter called "party of second part. "
WITNESSETH :
That in consideration of the covenants and agreements herein con-
tained, the parties do mutually agree as follows :
I . Employment of Engineer: The party of first part hereby employs
the party of second part and the party of second part agrees to perform
all necessary professional services hereinafter set forth in connection
with improvements to be made by the party of first part and described
as follows :
A. Phase I - Preliminary study of potential reservoir site
capable of serving parties of first part with adequate
water for both municipal and cooling purposes and herein
called the Project.
1 . Character and Extent of Services : The party of
second part shall render all engineering services
necessary in preparing a preliminary report which
shall develop sound conclusions and recommendations
of the Project, which shall include, but without
limitations , the following :
a) Collect, review, and utilize all available
hydrologic , quality and support data to make
basic yield and quality studies of the reservoir
site.
b) Present this data in sufficient detail so
that the reservoir site may be evaluated as
a possible source of cooling water for steam
electric station and pot.=,H ,%: ter for City
of Wichita Falls .
1
c) Develop any additional facts necessary to
determine future growth and future needs of
City of Wichita Falls , Texas .
d) Determine the most economical way to supply
water for these future needs by selecting
a reservoir site on the Little Wichita River,
either one that has already been studied ,
such as Ringgold site or a completely new
site.
e) Make such other preliminary investigation
and studies , drawings , cost estimates , pro-
gress schedules and estimates of materials
to indicate clearly the yield of reservoir
site at one-foot increments of drawdown to
a minimum reservoir surface area of 2,000
acres . Consideration shall be given to the
expected quality of water impounded in reservoir
using a wide range o, demands . Results of
yield and quality studies should be presented
both graphically and in tabular form. Dam
and reservoir configuration shall be plotted
on topographic maps , and Phase I Report shall
be prepared.
B. Phase II - This phase of the report shall not begin
until party of the first part has had ample time to
review the data presented in the Phase I Report,
1 . Purpose & Objectives : The purpose of Phase II
is to study the hydrologic characteristics of the
selected site in detail including necessary field
investigations . The objective if this phase is
to optimize the location and size of the proposed
reservoir; make detailed estimates of the cost
of the proposed dam and reservoir ; conduct detailed
quality and quantity routing studies to reflect
power plant and municipal operations ; and develop
a preliminary design ofdam and reservoir suitable
for Texas Water Rights Commission permit.
2. Requirements : Certain requirements shall be met
under Phase II planning .
a) Timing - Should be established after evalua-
tion of the Phase I resin ' ;
2.
b) Results - Phase II shall identify on suitable
topographic map, the optimized reservoir
location. Detailed water quality studies
as well as detailed estimated cost of the
dam and reservoir construction shall be prepared
and developed in a report so that it could
be used as a part of an application to the
Texas Water Rights Commission for a construction
permit.
II. Fees : The party of first part agrees to pay the party of
second part for such services as set out below, which shall constitute
complete compensation for the services renderea.
Phase I Report 35,000
Phase II Report 35 ,000
If actual market land values are required , additional amount
as negotiated.
If additional core borings are required , additional amount
as negotiated.
The Party of Second Part agrees to furnish copies of the
Phase I report in review draft form within eight (8) months from date
of contract and finished Phase I report within one (l ) month from date
of approval of draft. The Phase II report will be furnished in review
draft form within six (6) months from date of Phase II authorization ,
and the finished Phase II report within one (1 ) month after approval
of the draft.
THIS CONTRACT is executed in triplet, one copy to be retained
by each of the parties hereto.
CITY OF WICHITA FALLS , TEXAS
ATTEST:
By
Wilma Thomas , City Clerk Gerald G. Fox , City Manager
Party of First Part)
TEXAS ELECTRIC SERVICE COMPANY
ATTEST:
By
Party of fl,-71- Part)
FREESE AND NICHOLS , INC.
ATTEST:?
i ? /LL y By 0''j /
Party of Second Part)
3.