Res 2170 7/11/1978RESOLUTION NO. oPV RESOLUTION APPROVING FINAL ESTIMATE AND AUTHORIZING CITY MANAGER TO MAKE FINAL PAYMENT TO ZACK BURKETT COMPANY FOR CONSTRUCTION SERVICES RENDERED UNDER ADAP PROJECT #6-48-0227-03. WHEREAS, the City of Wichita Falls and Zack Burkett Company entered into a contract dated January 23, 1978, for construction services to be rendered under ADAP Project 6-48-0227-03 (Phase III Airport Improvements); and, WHEREAS, said construction project has been completed in accordance with the plans and specifications; and, WHEREAS, the contractor has submitted the final estimate on this project, which final estimate shows a total amount of work done as $156,006.64; and, WHEREAS, the amount of $139,358.38 was previously paid to the con- tractor leaving a balance of $16,648.26 due the contractor under the contract. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The construction of improvements identified under ADAP Project 6-48-0227-03 (Phase III Airport Improvements) is accepted by the City of Wichita. Falls, the final estimate is approved, and the City Manager is directed to pay Zack Burkett Company the balance due as shown on such final estimate, a. copy of which is attached hereto. PASSED AND APPROVED THIS the 11th day of July, 1978. M A Y O R ATTEST: City Clerk 7 S' 7 PERIODIC COST ESTIMATE PAGE 1 OF 1 PAGES 1. SPONSOR'S NAME AND ADDRESS 5. PROJECT NO. ADAP 6-48-0227-03 City of Wichita Falls 6. ESTIMATE NO 2. OFFICIAL NAME AND LOCATION OF AIRPORT 3 - Final Wichita Falls Municipal Airport 7. PErODE.NDING Wichita Falls, Texas Y 3. CONTRACTOR'S NAME AND ADDRESS 8. DATE ESTIMATE PREPARED Zack Burkett Company June 26, 1978 Box 209, Graham, Texas o COMPLETION PHYSICAL 4. DESCRIPTION OF WORK 100 o-. Phase III Improvements •10. SPONSOR'S CONTRACT NO. Apron and Taxiway Paving Ill 11. AMOUNT OF CONTRACT 156,006.64 12. COMPLETION TIME (Indicate ttether work or calendar days) 11 50 working days 13. DATES 14. NO. OF DAYS CONTRACTOR IS A. WORK TO START B. WORK STARTED C. COMPLETION DUE D. EST. OR AC". COMP. AHEAC I IN ARREARS 0 3-13-78 3-1-78 5-19-78 15. BREAKDOWN OF PERIODIC COST ESTIMATE (If additional space is rcqui-d, use continuation sheet) LATEST REVISED DETAILED ES., (P ATE WORK PERFORMED TO DATE ITEM JO NO.DESCRIPTION OF ITEM UNIT PER QUANTITY UNIT PA',, AMOUNT QUANTITY AMOUNT CENT a) b) c) id)e) f)t;) h) i) 1. Excavation (reused) 2701 CY $ 2.25 $ 6,077.25 2701 $ 6,077.25 100 10- 2. Excavation (spread) 1915 CY 1.00 1,915.00 1915 1,915.00 100 3. Bituminous Base 3853 Tcn 20.06 77 ,291.18 3853 I 77,291.18 100 4. Bituminous Surface 1285 Ton 20.06 25,777.10 1285 25,777.10 100 5. Concrete Pavement 1227 SY 16.73 22,981.711 1227 22,981.71 100 6. Prime Coat 4810 Gal 0.94 4,521.401 4810 4,521.40 100 7. Tack Coat 1250 Gal. 0.94 1,175.00 1250 1,175.00 100 8. Painting 1940 SF 0.60 1,164.00 I 1940 1,164.00 1100 all 9. 12 3/4" Steel Pipe 55 ILF 14.80 814.00 55 814.00 100 I CHANGE ORDER NO. 2 Lime 113 ITonsl 54.50 6,158.50 113 6,158.50 100 Miximg Lime 12510 SY 0.65 8,131.50 12510 8,131.50 100 156,006.64 156,006.64 16. CERTIFICATION ON CONTRACTOR - I HEREBY CERTIFY that the work performed and the materials supplied to date, as shown on this periodic cost estimate, represent the actual value of accomplishment under the terms of this contract in con- formity with approved plans and specifications; that the quantities shown were properly determined and are correct; and that there has been full compliance with all labor provisions included in the contract identified above, and in all subcontracts made under that contract. DATE CONTRACTOR'S NAME June 27, 1978 Zack 7'P'' '>' Comp y TITLE SIGNATUH,_ lr i.; BY General Supt. oQ 17. CONCURRENCE AND CERTIFICATION OF SPONSOR'S ENGINEER - I hove ox,', fined this periodic cost estimate, and concur in the certificate of the contractor and certify that the materials used and the construction accomplished meet the requirements of the plans and specifications, as evidenced by certified test and inspection reports included in the project t ,l' - records. DATE SIGNATURE, SPONSOR'S ENGINEER 1 June 27, 1978 I ES 71 MATE r • Owner_ City of Wichita Falls Contract Awarded 1-23-78 project Name Phase III Improvccants - W.F. F'!1t;ni.ci A.3.)Oast` 15 6,0 06.64ContractAmount_ Estimate No. 3-Final for the period Completion Time, Days immomi Firma Mav 1 19_21A0 v y 31 9 15 AIloaed 5° Used Wait Zack Burkett Co. centtphc,o:1 of 1 00 all Di C5t13 YION I UNIT rs:r TOT AL wo=x UNIT OR -_ staiamaxa r .rcrr•a n I LUMP aJM AMOUNTPWIC[ 1. Excavation - re-u cd C" 27012. vtf - z+removed a 2.25 6, 3. Bittmmirnotaa Bea, 10: 5:1.00 1,915.00 4. Bi 1t1d 8a53 20.06 77,291.18SurfA°cN 1233 20.06 25,777.1011015. Concrete Pavement SY 1227 13.73 22,981.716. Prime Copt GAL 46 .0 0.94 4,521.407. Tack Coat GAL- 8. Painting SF 12„:0 0.94 1,175.00 11!ill 9. 12 3/4" Steal Pipe F 19= 0 0.60 1,164.00 L'' 55 14.80 814.00 CHAR`3E ORDER NO. 2 Lime TON 113 54.50 6,158.50MixingLimaSY125100.65 8,131.50471 MYrE: Itema 1-9 include changes lude 111Pli with Change Order 1 6 3 Illit lif 4!11 roved: BIGGS & MATHEWS Total Amount of Work Done 156 006.64 CONSULTING ENCINEURslI .t4017FAITHROAD— PHONE Ma071 J®++a 0 Q-Retained June 26 Difference (Amount Payable on Contract) . . . 156,006.64i9__ B. oved.___ Less Previous Payments 139,358.38roeowmm 19 Amount Duo on Contract This Eatira:l' s 16,648.26 I