Loading...
Res 2140 5/16/1978RESOLUTION NO. RESOLUTION APPROVING CONTRACT WITH CORLETT, PROBST & BOYD FOR FEASIBILITY STUDY OF SOUTHWEST PARKWAY DRAINAGE. BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: That certain contract, a copy of which is attached hereto, between the City of Wichita Falls and Corlett, Probst & Boyd, for engineering services for a feasibility study concerning Southwest Parkway drainage,is hereby approved, and the City Manager is authorized to execute the same for the City of Wichita Falls. PASSED AND APPROVED this the 16th day of May, 1978. MAYOR ATTEST: City Clerk THE STATE OF TEXAS X. COUNTY OF WICHITA X CONTRACT FOR FEASIBILITY STUDY This contract made and entered into this the 16th day of May, 1978 , by and between the City of Wichita Falls, hereinafter called City, and Corlett,Probst & Boyd, herein- after called Engineers , WITNESSETH: FOR AND IN CONSIDERATION OF THE MUTUAL COVENANTS HEREIN CONTAINED, the parties hereto do hereby agree as follows : 1. Engineers shall study the feasibility of divert- ing a major portion of the water carried by the concrete drainage ditch along the north side of Southwest Parkway into Holliday Creek before it reaches McGrath Creek. The scope of the study is as follows: A. Calculate the present 25 year, 50 year and 100 year runoff into the Southwest Parkway channel. Esti- mate the future increase when the contributing area is fully developed. B. Investigate the routing of the relief facil- ity to include the following routes : 1) From Southwest Parkway down abandoned railroad right-of-way (now owned by TESCO) to old Holliday Creek channel. 2) Down K-Mart Drive -- thence easterly to abandoned railroad; thence down railroad to old Holliday Creek channel. 3) Down west side of Midwestern Farms to north side of Lake Wichita Dam; thence southeasterly to old Holliday Creek channel. C. Select most feasible route. Include exist- ing underground utilities , right-of-way restrictions, and location of existing aboveground facilities in the report. j Estimate depth to groundwater and note general soil char- acteristics. D. Indicate probable relief to be experienced on McGrath Creek if the recommended improvements are built. E. Estimate costs of recommended improvements. 2. The feasibility study will be completed within 120 days of receipt of authorization to proceed from the City' s Director of Public Works. 3. One preliminary copy of the report will be sub- mitted to City' s Director of Public Works for his comments and review. Five copies of the final report will be fur- nished City when the study is completed. 4. City shall pay to Engineers for their services hereunder the sum of $4 , 890, which shall be payable upon the completion of the study. 5. In the event City' s Board of Aldermen decide to construct the project, and in the event Engineers are given a contract for the engineering design of the project, the full amount of the fee paid for this feasibility study will be credited on the fee for the engineering design. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed as of the day and year first set out above. City of Wichita Falls By: ATTEST: City Manager City Clerk Approved as to form: Corlett, Probst & Boyd City Attorney By: 2