Loading...
Ord 2962 3/18/1975 JIM ORDINANCE NO. fr�� AN ORDINANCE GRANTING AUTHORITY TO THE MRO GROUP TO CONSTRUCT A ROOF OVERHANG INTO THE PUBLIC ALLEY IN BLOCK 246 OF ORIGINAL TOWNSITE, CITY OF WICHITA FALLS, TEXAS. WHEREAS, the MRO Group is in the process of constructing office facilities on Lot 1 of Block 246, of the Original Townsite of the City of Wichita Falls , and desires to construct a roof overhang into the public alleyway. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS , THAT: SECTION 1 . The MRO Group is hereby granted the right and authority to construct a roof overhang extending two feet into the alley in Lot 1 of Block 246, Original Townsite of the City of Wichita Falls . Such overhang shall be con- structed in the manner and location shown in a drawing dated February 28, 1975, a copy of which is attached hereto. The bottom of said overhang shall be at least eight feet above ground level . SECTION 2. Said company shall coordinate such project with all utili- ty companies whose facilities are located in such alleyway. SECTION 3. It shall be the duty of said company at all times to main- tain said overhang at its own expense. If at any time in the future some public use of such right-of-way makes it necessary that the said overhang be relocated or removed, such relocation or removal shall be done at the sole cost and expense of such company. SECTION 4. Whenever any work is being done on the construction or maintenance of said overhang, the MRO Group shall take all necessary and proper precautions to protect the public from damage, and said company shall hold and save the City of Wichita Falls harmless from all damages or claims from damages, resulting from the construction, maintenance and operation of said overhang. SECTION 5. The right and authority hereby granted is for so long as said overhang is used and maintained by the MRO Group. PASSED AND APPROVED THIS THE 18TH DAY OF MARCH, 1975. MAYOR ATTEST: City Clerk Z MRO EXECUTIVE OFFICES ® A GROUP OF AFFILIATED FULL SERVICE INDUSTRIAL DISTRIBUTORS SERVING BOX 654 GROUP THE MAINTENANCE--REPAIR-AND OPERATIONAL NEEDS OF INDUSTRY. WICHITA FALLS, TEXAS 76307 MRO I XECUI''/1. OFI-,CE, W,X :,., (817) 322-4477 wrtIH17/'. :Li iCxps 7,507 ,X17, 37:4417 ni +ac•.iut ,. uV za February 26 , 1975 Mr. Ernest 'Allard , Director of Public Works City of Wichita Falls Memorial Auditorium Wichita Falls , Texas Dear Ernest , It was a pleasure to speak to you today concerning a renovation project our company is undertaking. As we discussed, our company has purchased the building and land known as 1407-1409 7th Street. It is our plan to totally renovate this present building and change its appearance inside and out. The building design calls for a roof facade to go completely around the building overhangin' approximately two feet on all sides. Since the west side of the building is now on the property line adjoining the city alley, we are requesting permis-pion to use the air space above the alley for this two foot projection. The alley is a 25 foot alley paved only in the center area. The proposed projection would remain well within line of utility poles and would pose no hazard in our opinion. We would like to take the steps necessary to be allowed to construct this roof overhang. A cony of sketches will be provided for you. Please let; me know what other steps we need to take. Yours truly , Paul Teague , Partner PT/ht .-sr '\nor C H op 0 C 10 /8/ 9 �g � n l IND 0 Z. - - s, j i 0 Q 1 I r.� c Cif o \ nnm o >o �zn z •N ti in --II D - R IiO\) _ r -n p -(\II 11 rn - m P(P Nrn70 GL,„----P- . t-r�< _ -- .(0-- Zm _SIDEWALK ■1� I N T ) *. 0rn SEVENTH STREET (32 'PAYEMENr -8o ' an )