Res 2407 10/2/1979RESOLUTION NO. 2407
RESOLUTION ADOPTING STATE HIGHWAY AND PUBLIC
TRANSPORTATION COMMISSION MINUTE ORDER NO. 76287 ,
CONVERTING A PORTION OF EAST ARROWHEAD DRIVE
TO A FARM TO MARKET ROAD.
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA
FALLS, TEXAS, THAT:
The provisions of Minute Order No. 76287 passed by the State
Highway and Public Transportation Commission on September 26 , 1979,
a copy of which is attached hereto, and is made a part thereof, providing
for the construction of a Farm to Market Road extending from FM 1954,
2.3 miles South of FM 2393, East and South to FM 2606, a distance of
approximately 6.8 miles are acceptable to the City of Wichita Falls. It
is hereby ordered that the City of Wichita Falls cooperate with the
State Department of Highways and Public Transportation and fulfill its
obligation so stipulated in said Minute Order as being the responsibility
of the City.
PASSED AND APPROVED TIHIS, 2nd day of October, 1979.
MAYOR
ATTEST:
1irr,•rTY CLERK
w'esw,i344 Rev.,, .STATE DEPARTMENT OF HIGHWAYS I
AND PUBLIC' TRANSPORTATION
L*Y :. ttiu ttr
VDistrictNoi3 ER pair_-- — of _1.-_Paq•s
In CLAY cuu ri a FARM TO MARRE7 ROAD is hereby designated extending from Farm
to Market Road 1954, 2.4 miles South of r'arm to Market Road 2393, last sod
South to Farm to Msrkat Load 2606, a distance of approximately 6.8 milee,' sub-
ject to the condition that Clay County eisl the City of Wichita Fa.l. aril
furnish all required right of way clear of obstructions and free of cost to
the Stets and acquisition procedures will he in accordance with applicable
Federal and Rtatr 4011 pawning the acquisition policies for acquiring real
property.
At such time as Clay County and the City of Wichita Falls shall accept the
provision of this Order and agree to the furnishing of the required right of
way, the Engineer-Director is directed to proceed with the engineering develop-
ment, Relocation Assistance at an estimated cost of $100, and the construction
of Spot Level and Repair Sass on Sections land Seal Coat in the most feasible
and economical manner ot en estimated cost of $125,000 as authorised in the
1979-1980 Teams Farm to Market Road Program, and to assume the road for State
maintenance upon completion of the construction.
This Order is subject to acceptance by Clay County and the City of Wichita
Falls and if not accepted within 90 days of the date hereof, the action here-
in contained shall be automatically cancelled.
Submitted by. Examined and recommended by:
Tate) Program ip Assistant Engineer-DirectorogawApproved
gpilneer•1 ruector
Approved:
7(328'7G(ammi zgne[ Minute Number__.
p c r QCpmrnktionerDatePassedSEl2679
V_. ... T..1.I....,. --t..