Res 2569 7/1/1980 RESOLUTION NO. G
RESOLUTION APPROVING CONTRACT WITH CORLETT,
PROBST & BOYD FOR ENGINEERING SERVICES FOR
WATER DISTRIBUTION LINES.
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF
WICHITA FALLS, TEXAS , THAT:
That certain contract, a copy of which is attached hereto,
between the City of Wichita Falls and Corlett, Probst & Boyd
for the performance of engineering services for the design
and construction of certain water distribution lines, is
hereby approved, and the City Manager is authorized to
execute the same for the City of Wichita Falls.
PASSED AND APPROVED this the lst day of July, 1980 .
MBm � o
A O
ATTEST:
City Clerk
AGREEMENT FOR ENGINEERING SERVICES
THIS AGREEMENT made this, the day of 1980,
by and between the City of Wichita Falls, Texas, hereinafter called the OWNER and
Corlett, Probst & Boyd, hereinafter called the ENGINEER:
WHEREAS the OWNER intends to construct three water distribution lines, one on the
South side of Kell Expressway between Fairway Blvd. and Lawrence Road, one on-Kemp
Blvd. between Avenue G and Ninth Street, and one on Expressway 281 between
7Wenty-Second Street and California Street, and the ENGINEER agrees to perform the
various professional engineering services required for the design and construction
of the Water Distribution Lines.
NOW, THEREFORE, THIS AGREEMENT WITNESSETH: That for and inconsideration of the
mutual covenants and promises between the parties hereto, it is hereby agreed that
the ENGINEER shall furnish engineering services to include the following:
1. He will conduct preliminary investigations, including general
studies of the subsurface conditions and routing.
2. He will prepare preliminary plans and an estimate of the cost.
3. He will conduct the necessary design surveys, metes and bounds
surveys for legal description of required Rights-of-Way, and
prepare detailed plans, after approval of Preliminary Plaris by
the OWNER.
4. He will prepare contract documents which will include a construction
contract, advertisement for bids, a general contract, notice of
award, payment and performance bonds, and specifications.
5. He will provide the necessary copies of the detailed plans and
specifications and the construction contracts for the use of the
OWNER, bidders and contractors.
6. He will assist the OWNER, when requested, -in negotiating for property
easenents or Rights-of-Ways required to construct the facility, and
he will assist the OWNER's attorney in procuring titles, rights
and authorizations.
7. He will arrange for, attend and conduct the bid openings and
tabulate the bid proposals with reccmendations and summaries
to the OWNER.
8. He will interpret the intent of the plans and specifications to
protect the OWNER against defects and deficiencies in construction
on the part of the contractors. He will not, however, guarantee
the performance by any contractor.
10. He will provide general engineering inspection of the work of the
contractors as construction progresses. Detailed construction
inspection and supervision will not be furnished.
11. He will prepare estimates for progress and final payments.
12. He will supervise adequate tests to confirm ca-npliance with system
operating requirEments and conformance with plans and specifications
and make a final inspection of all construction and equipment and issue
certification of final inspection to the OWNER.
13. He will provide the OWNER with one (1) set of reproducible "as built"
plans and two (2) sets of prints on paper at no cost to the OWNER.
14. He will notify appropriate persons of the date and time of final
inspection.
The OWNER agrees to pay the ENGINEER as canpensation for his services rendered a fee
based on the total of all construction contracts and the percentage arrived at by
using Curve B on the attachment taken fran the Texas Society of Professional Engineers
General -Engineering Services Publication. Percentages for ccmpensaticn shall be
based cn construction costs, payable as follows:
1. Fifty percent (50%) of the total canpensation upon awarding of the
construction contracts.
2. Fifty percent (50%) upon ccmpletion of the construction contracts and
acceptance by the OWNER.
IN WITNESS WHEREOF, the parties hereby have affixed their hands this day
Of 1980.
OWNER: The City of Wichita Falls, Texas
ATTEST:
J. Thamas, City Clerk
By:
Gerald Fox, City Manager
ENGINEER: Corlett, Probst & Boyd
By:
Richard K. Boyd, P. .
i U'y o
C � �
QC7 O L •p U
U O
t+ fn W
0 um1 C A
L.0
O Y C y � •--{
in-
U
G
f9
A ( � A N LU
J
.LT
O m W � to
O O � Q
O > y W
LLi
o m U r-L > U O
]. +. L. Ul L'- Q p
vmi - mLO u ¢ OU u
a m Q °t 3 .0 LU a- O
Ei 7, O O > O Z V)
c •x U (� n Q c
a as m L ai V)
E tea' ....rc a
ai a r_ m c
ELa c oan
o E 2 " �
d = _
m c m
CLD
O m N ,�Q" O
m
` cu
m m m EbD
GJ4
o
Ln
Ul C q
�m m
LO beE tuu — '" o tFl�
�} s_ V O M r. � O
3 V C b O I U
y m ai '} yy C
C- o O
.. C -ow
E
✓7 y,gyp, +�+ s,. w• C
i4 C O C U
V iy i O G bA L7 t4 LP {!)
A O C1
O C C.g DLU Z
C o �. Ob nllq O O
. w: 1 U
7 tm!) V= U m •�•• m rL
o `C m
Vf 61
C C. y.. w o 9
O E U.0 C O p Vl
O O
Vf i y in
w C.,., o
��...mO ti o T uoi � coi v G o
a sn N o rn m r. 0 rn � o
N
IN]IO ]cl-308VHO OISVS
0
z
1