Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Res 2671 11/18/1980
RESOLUTION NO. 167/ Alkik RESOLUTION APPROVING CHANGE ORDER NO. 2 TO CONTRACT FOR REMODELING OF THE POLICE HEAD- QUARTERS, CONCERNING THE REROOFING PORTION OF SUCH CONTRACT. WHEREAS, heretofore the City entered into a contract with Wallace & Raub Construction Co. dated September 2 , 1980, for the remodeling of the Wichita Falls Police Headquarters; and WHEREAS, it has been determined by the architect that it will be impossible to reroof the building in the manner specified, because of the condition of the present roof. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: Change Order No. 2, a copy of which is attached hereto, to such contract with Wallace & Raub Construction Co. , changing the method of reroofing such building for an additional sum of $4, 680, is hereby approved, and the City Manager is authorized to execute the same for the City of Wichita Falls. PASSED AND APPROVED this the 18th day of November, 1980. A Y O R ATTEST: City Clerk CHANGE Di C stribution to: ORDER OWNER ARCHITECT r•. AlA DOCUMENT G701 CONTRACTOR FIELD OTHER PROJECT: Remodeling of the Wichita Falls CHANGE ORDER NUMBER: Two. (2) name, address) Police Headquarters Wichita Falls, Texas INITIATION DATE: 31 October 1980 TO (Contractor): ARCHITECT'S PROJECT NO: 80419 Wallace & Raub Construction Co.I 5007 Joyce Lane CONTRACT FOR: General Construction Wichita Falls, Texas 76302 i CONTRACT DATE: 2 September 1980 You are directed to make the following changes in this Contract: 1. Install J-M Re-Roof Board over existing Built-Up Roofing, substitute Centurian Base sheet for Vensulation Base sheet and install roofing as recommended by manufacturer. ADD: $4,680.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) a411t) was 92,438 01) Net change by previously authorized Change Orders 600 00 The (Contract Sum) (6mNzadc prior to this Change Order was 93,038 00 The (Contract Sum) (6>lrainusme$at aommaGaotst) will be (increased) (dcnsaoxi 48=bit4ii by this Change Order 4,680 00 The new (Contract Sum) (1800txt1itstaX4WtilagutitXAXIf including this Change Order will be $ 97,718 00 The Contract Time will be #itortats>e ddez eox d (unchanged) by 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is 1 February 1981 Authorized: CHARLES HARPER ASSOCIATES WALLACE & RAUB CONSTRUCTION THE CITY OF WICHITA FALLS ARCHITECT WN.TRACOTOR L)VICNER.. 4724. Old . .. sboro H' • way 00/ Joyce Lane vU ox 1431 Address Address Address Wich'[ J. s , .. 7` 02 Wichita Falls, Texas 76302 Wichita Falls, Texas 76307 By A --„, . . / , _ s.< y y it!'S"t-T 13Y Rah B. 'erkins Bobby/W:llace, Owner art A. Bach BATE 1 October DATE 1 October 1980 DATE October 1980 AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIAv • © 1978 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W., WASHINGTON, D.C.200(16 G701-1978