Loading...
Res 2620 9/16/1980RESOLUTION NO. lp RESOLUTION APPROVING CONTRACT WITH RORABAUGH MECHANICAL COMPANY FOR CORRECTION OF DEFICIENCIES IN FIRE SPRINKLER SYSTEM AT WICHITA FALLS ACTIVITIES CENTER. BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: That certain contract, a copy of which is attached hereto, between the City of Wichita Falls and Rorabaugh Mechanical Company, to correct deficiencies in the fire sprinkler system in the Wichita Falls Activities Center, is hereby approved, and the City Manager is authorized to execute the same for the City of Wichita Falls. PASSED AND APPROVED this the 16th day of September, 1980. A Y O R ATTEST: City Clerk THE AMERICAN INSTITUTE OF ARCHITECTS ir;;• I- I AIA Document A101 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM 1977 EDITION THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION Use only with the 1976 Edition of AIA Document A201, General Conditions of the Contract for Construction. This document has been approved and endorsed by The Associated General Contractors of America. AGREEMENT made as of the 4th day of August in the year of Ninetec;n Hundred and Eighty BETWEEN the Owner: City of Wichita Falls , Texas RMC and the Contractor: Rorabaugh Mechanical Company Wichita Falls , Texas The Project: Correct Deficiencies in Fire Sprinkler System Wichita Falls Activities Center Wichita Falls , Texas The Architect: Robert Pardue & Associates Wichita Falls , Texas The Owner and the Contractor agree as set forth below. Copyright 1915, 1918, 1925, 1937, 1951, 195(1, 1961, 1963, 1'5,7, 1974, 0 1977 by the Amerkk,ln In•litute of Architects 1735 New York Avenue, N.W., Wachington, D. C. 20(106. Reproduction of the material herein or substantial quotation of its provisions without permission of the ALA virrl,,tes the copyright laws of the United States and will be subject to legal prosecution. AIA DOCUMENT A101 • OWNER-C INIK,AC1 OR A(;RE f,At1NI • ELEVEN11 MITI()N • IUNL 1977 • \LA'S 01977 • THE AMERICAN INS111111E 01 AR( III Ii-CES, 17_t1 `..1\V YORK A\E. N\V \1 A`.II` I('•N O, c ,. A101-1977 1 ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, the Condition, of the Contract (GeLoer417_,Supplementary a.gd ote-r-deaditiorns),-the-Drawings;-the-Spt,E-i4ications;alf-Addenda issued--txicx-t-o-a-nd al!-A4odi-f+ca-t+ens issued after exe- eu-tian-ef--ths--Agreement—These form toe Contra-t-,-< d all are as fully a pari-Uf tho Contract if Zttarheci to this f'. ed-herein-An--enumeration-of-the•Contract--4 o ements-appears--in Article 7. and the attached proposal by RMC Rorabaugh Mechanical Contractors dated 2-20-80. ARTICLE 2 THE WORK The Contractor shall perform all the Work required by the Contract Documents for Here insert the caption descriptive of the Work as used on other Contract Documents.) Correct Deficiencies in Fire Sprinkler System Wichita Falls Activities Center Wichita Falls , Texas The Contractor shall make all necessary corrections and additions required to bring fire sprinkler system into compliance with City of Wichita Falls and/or State Insurance Board requirements as outlined in RMC proposal dated February 20, 1980 (attached) . ARTICLE 3 TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION The Work to be performed under this Contract shall be commenced on or about August 15 , 1 980 and, subject to authorized adjustments, Substantial Completion shall he achieved not later than Ninety Here insert any special provi ions for liquidated damages relating to failure to complete nn time.) Calendar Days AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT • ELEVEN HI EDITION • JUNE 1977 • A!\a01977 • THE AMERICAN INSTITUTE OF ARCIIITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20306 A101-1977 2 ARTICLE 4 CONTRACT SUM The Owner shall pay the Contractor in current funds for the performance of the Work, subject to additions and deductions by Change Order as provided in the Contract Documents, the Contract Sum of The Contract Sum is determined as follows. State here the base bid or other lump sum amount,accepted alternates,and unit prices,as applicable.) THIRTY—THREE—THOUSAND—THREE—HUNDRED—EIGHTY—FOUR DOLLARS ($33, 384 .00) ARTICLE 5 PROGRESS PAYMENTS Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as pro- vided in the Contract Documents for the period ending the last day of the month as follows: Not later than five days following the end of the period covered by the Application for Payment ninety percent ( 90 '')) of the portion of the Contract Sum properly allocable to labor, materials and equipment incorporated in the Work and ninety percent ( 90°)) of the portion of the Contract Sum properly allocable to materials and equipment suitably stored at the site or at some other location agreed upon in writing, for the period covered by the Application for Payment, less the aggregate of previous payments made by the Owner; and upon Substantial Completion of the entire Work, a sum sufficient to increase the total payments to ninety five percent ( 95 "4r) of the Contract Sum, less such amounts as the Architect shall determine for all incomplete Work and unsettled claims as provided in the Contract Documents. If not covered elsewhere in the Contract Documents, here insert any provision for limiting or reducing the amount retained after the Work reaches a certain stage of completion.) Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at the rate entered below, or in the absence thereof, at the legal rate prevailing at the place of the Project. Here insert any rate of interest agreed upon.) Usury lies and requirements under the federal Truth in Lending Act, similar state and tucal con,umor credit laws and other regulations at the Owner's and Contractor's principal places of buiness, the /oration of the Project and elsewhere rinse affect the validity of this provision. Specific legal advice should be obtained with respect to deletion, modification, or other requirements such as written disclosures or waivers-) AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT • ELEVENTH EDITION • JUNE 1977 • AIA® 1977 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A101-1977 3 ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the Contractor when the Work has been completed, the Contract fully performed, and a final Certificate for Payment has been issued by the Architect. ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings designated in those Conditions. 7.2 The Contract Documents,which constitute the entire agreement between the Owner and the Contractor,are listed in Article 1 and, except for Modifications issued after execution of this Agreement, are enumerated as follows: 4+sFbelew-the,Agr cement,the ConclNi«>a,-.11-1be ouFUU-4:UVCalr4r ryryl M,1ry,.irtd t:onidirf(ms-TtriF Dr awing, Thir5pecirrcati-oas-aad-aay-Addcwda-- d accepoe i p,gs a, et nun>lr4 rs—in--alL-ca a:-44‘1-El.ile:_wl)#u,.app.1i<able.) 7 .2 . 1 Replace all ceiling board required by relocation of existing sprinkler heads . 7.2.2 All sprinkler heads shall be replaced with new heads of the type required for location and use . 7 .2 . 3 Install new split—ring type escutcheons at all sprinkler heads . 7 .2..4 Install test valves at end of each system with access doors for use by inspector. This Agreement entered into as of the day and year first written above. OWNER CONTRACTOR RMC RORABAUGH MECHANICAL CITY OF WICHITA FALLS CONTRACTORS Wichita Falls , Texas Wichita Falls , Texas, yy MA DOCUMENT A10I • OWNER-CONTRA( IOR AGRIT I CENT • [I EVEN 1I I EDITION • JUNE 1977 • AIA'" 1977 • THE AMERICAN INSTITUTE Of ARCHI IECTS,_1733 NEW YORK AVE., N.W., WASHINGTON, D.C. 21'006 A101-1977 4 RORABAUGH MECHANICAL COMPANY Alf C MECHANICAL CONTRACTORS February 20, 1980 Robert Pardue & Associates-Architects 1901 Tenth Street Wichita Falls, Texas 76309 Res Fire Sprinkler Survey Activity Center - Wichita Falls, Texas Gentlemen: On February 19, 1980 a survey of the Fire Sprinkler System at the above referenced location was made by RMC and our observations were as follows. First Floor Room 123 - Inadequate coverage due to the plugging of seven (7) head openings, eight (8) sprinkler heads have been painted, four (4) sprinkler heads have been taped and painted, no spare heads or head wrench in spare head cabinet, defective pressure gauge on one alarm valve assembly, water motor alarm system would not operate. Room 116 - Inadequate coverage as most head openings have been plugged above the ceiling, two (2) sprinkler heads have been painted. Room 118 - No sprinkler protection in this area. Room 119 - No sprinkler protection in this area. Room 120 - No sprinkler protection in this area. Room 122 -. Inadequate coverage due to missing heads. Room 110 - No sprinkler protection in this area. Room 113 - Inadequate coverage due to missing heads. Room 104 - Inadequate coverage due to head openings having been plugged above the ceiling. Room 109 - Inadequate coverage due to drops being 2" instead of 1" as required. Page 1 of 3 --- POST OFFICE BOX 5351 WICHITA FALLS,TEXAS 76307 817 /723-153E Room 247 - All sprinkler drops are ?" instead of 1" as required. Room 248 - All sprinkler drops are ?" instead of 1" as required. Room 251 r All sprinkler drops are In instead of 1" as required. Room 243 - No fire protection this area as all openings above the ceiling are plugged. Room 242 - No fire protection this area as all openings above the ceiling are plugged. Room 236 - Inadequate coverage as sprinkler heads are in a partition. Room 239 - One (1) sprinkler head in the return air grille. Room 201 - No fire sprinkler protection this area. Room 212 - Inadequate coverage due to the removal and plugging of some pipe. one (1) head is leaking. Summary of 2nd Floor Numerous sprinkler drops are 2" pipe instead of 1" as required. The heads throughout are generally upright type instead of pendent type which are recommended. Spacing is inconsistent and coverage is ,not maintained in many areas. New stairway areas have not been sprinklered. Heat range of all heads could not ba.determined. Thank you for the opportunity to be of service. If we can be of further service please call us. Yours very truly, Rorabaugh Mechanical Company Robert L. Rorabaugh RLR/ml 4 Roop.124 - Two (2) sprinkler heads have been painted. Summary of 1st Floor All sprinkler drops from column lines 8-12 and A-H are Z" instead of 1" as required. Sprinkler heads in areas with suspended ceilings appear to upright type instead of pendent type. Spacing is inconsistent and proper coverage has not been maintained in many areas. New stairway areas have not been sprinklered. Second Floor Room 213 - Inadequate coverage due to missing sprinkler heads. Room 216 - Inadequate coverage due to missing sprinkler heads. Room 217 - Inadequate coverage due to missing sprinkler heads. Room 218 - No fire sprinkler protection in this area. Room 224 Inadequate coverage due to the plugging of one (1) of the two (2) openings in this area. Room 221 - Inadequate coverage due to the plugging of some of the openings above the ceiling. Room 225 - Inadequate coverage due to the plugging of all the openings above the ceiling except one (1). Room 226 - Inadequate coverage due to the plugging of all of the openings above the ceiling except two (2). Room 228 - Inadequate coverage due to the removal of some of the piping, the remaining piping should be supported. Room 240 - No fire sprinkler protection inithis-area. Room 246 - Inadequate coverage as piping has been removed and remaining piping has been plugged. Some existing upright heads are still active above the ceiling. Room 255 - Inadequate -coverage as the existing upright heads above the ceiling have not been dropped and pendent heads installed. Page 2 of 3 ----