Res 2833 8/18/1981RESOLUTION NO. 0 33 RESOLUTION APPROVING CHANGE ORDER NO. ONE (1) TO THE CONTRACT WITH C.D. GRAHAM CONSTRUCTION CO. FOR REMODEL OF MUNICIPAL AIRPORT TERMINAL BUILDIlNG, PROJECT NO, 6-48-0227-07. BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: That certain Change Order No. 1, a copy of which is attached hereto, to the contract with C. D. Graham Construction, Co. for the remodel of the Municipal Airport Terminal Building is hereby approved, and the City Manager is authorized to execute same for the City of Wichita Falls. PASSED AND APPROVED THIS the 18th day of August 1981. M A Y O R ATTEST: City Clerk Page of Pages Agenda Item CHANGE Distribution to: ORDER OWNER l ARCHITECT AM DOCUMENT C70-1 CONTRACTOR: FIELD OTHER PROJECT: Remodel, Wichita Falls Airport CHANGE ORDER NUMBER: One name, address) Terminal Building INITIATION DATE: TO (Contractor):FAA • • 1 C. Da Graham Consto Co. , I lc u:4: .G _r :: PROJECT NO: 6-48-0227-07 5202 Jacksboro Hwy.CONTRACT FOR: Wichita Falls, Texas 76302 General L I CONTRACT DATE: 6 May, 1981 You are directed to make the following changes in this Contract: 1 . Change Disconnected for AC Units Nos. 1 and 4 from 100 to 200 Amps. 2. Change the 3 pole circuit breakers for AC units Nos. 1 and 4 from 100 to 175 Amps. 3. Delete the "New Service Lateral, 4 #350 MCM adjacent to ex— isting0 0 0 0 0 0 0 0 ." , as noted on Sheet B'-1 of Plans0 (Also re- ferred to as "New Set 4 #350 MCM Cu. Circuit. . . . . . . . . ." , on Sheet E-2 of plans. 4. Install temporary service from pad mounted transformer across the street to the Airport Terminal Building, remove the exist- ing PVC conduit (broken in—place ) and replace. Embed the two new .Schedule PVC underground conduit , below street, with a minimum of 4 inches of concrete above the tops of the conduits. Backfill with crushed limestone and patch paving with 4 inches of hot asphaltic concrete. (This work requires approximately 70 feet extra of 3 inch schedule 40 PVC conduit. ) r r. .I:,• . ,;Ir , .:r":c t ,•ill l`ll'..\ :.'C. 1:'1:111': 1 , r .-1 _i,.., ,..11 ,. ;1;. he Original (Cllnir,,ct aura' (Ctiai nleed Maximum Cost) Vvas S 185 ,316000 i'et rh,uv;e by prey in(c;ly ;t;Illclriico-Garin;;e Order: 0-- Thu iCunte:(t Sum) -4 L--t-,o1L " Ly'-+-i•-'1'iniur :o 1hi` Cll,u)ge Order wds•- -- •-- y 1852316000 The !Contract sum) (C:a.1.:.duti:L:ri .S.L . :: wiil be (increased fcic;: ul,.».u;:»:r by this Change Order - - - - ._ 5i127;99 The new (Contract sum! (1,;.1,..+•1•k+N4.+•..1~+.+.1a»t++;«.Gw-:+ including this Change Order will be . . . $ 1901443.99 The Contract Time will he (increased) “lE.cf+4T:•(4.44-4.i4+4 44,4 •c'i•1.) by 1 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is 160 calendar days* Aulhorited: Joe B. Roberts C. D. Graham Const. Co. City of Wichita Falls ARC1RIJU Brook coS1 d`-2 dacksboro Hwy. c)ti`l jul Sixth S"t. Addre>s Address Address Wichita Falls, Tex. Wichita F 1 s Tex. Wichita Falls, Tex. R1'— i, 13Y— BY I).,- do, igi ATE --- L — 0 i t):AIL AIA DOCUMENT G701 • CHANCE ORMR • Al'RII 19711 EDI I ION • AIA, • c'% 197u THE AMERICAN INS l t ru rE Of AR(HI rF(TS, 17r, NI\V YORK AVE., N.M. \V\sl lIN(;TON, D.C. _'Hoof,G701 —1978 1