Res 2735 3/3/1981RESOLUTION NO .
RESOLUTION APPROVING CONTRACT WITH BIGGS AND MATHEWS,
INC . FOR ENGINEERING SERVICES CONCERNING THE WEEKS
STREET EXTENSION .
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA
FALLS, TEXAS, THAT :
That certain contract, a copy of which is attached hereto,
between the City of Wichita Falls and Biggs and Mathews, Inc . for
engineering services in connection with the extension of Weeks
Street from Wesley Methodist Church to Jacksboro Highway, is
hereby approved, and the City Manager is authorized to execute the
same for the City of Wichita Falls. The contract shall further
provide that the fee payable thereunder shall not exceed $1 ,950. 00.
PASSED AND APPROVED this the j/606 day of AtA
1981 .
M A Y O R
717;i0v4..A?,4402..
ATTEST :
City Clerk
Page of Pages
Agenda Item No.
STATE OF TEXAS
COUNTY OF WICHITA 1
This contract, made and entered into as of the day of 1981,
by and between the City of Wichita Falls, Wichita Falls, Texas , (hereinafter
called "Owner") and the firm of Biggs & Mathews, Inc. , Consulting Engineers ,
Wichita Falls, Texas, (hereinafter called "Engineer")
WITNESSETH:
WHEREAS, improvements to Weeks Street from the Wesley Church to the Old
Jacksboro Highway in the City of Wichita Falls, Texas, is proposed; and
WHEREAS, the firm of Biggs & Mathews, Inc., is acceptable to the Owner and
is willing to enter into a contract to perform engineering services required by
the Owner:
NOW THEREFORE , it is agreed as follows :
I
The Owner hereby retains the Engineer for all engineering services required
in connection with the design and preparation of plans and specifications of the
proposed street improvements.
The services performed by the Engineer in connection with proposed
improvements shall be as follows:
1 . Preliminary study and design necessary to outline those improvements
required.
2. Perform all necessary survey field work required to prepare construction
plans.
3. Preparation of detailed plans , specifications and contract documents for
the proposed street construction.
1- Page 3 • of 6 pages
5.b.Agenda Item No.
4. Coordinate all work with the City' s Department of Public Works .
5. Furnish to the City eight (8) copies each of the plans and of the
specifications.
II
For the services performed under Section 'I of this Agreement, the
compensation to the Engineer shall be based upon the hourly rates for various
services and actual costs of out-of-pocket expenses as hereinafter set out in the
rate schedule:
RATE SCHEDULE
Hourly Rate
Principal of Firm 50.00
Design Engineer 30.00
Electronic Computer & Operator 25.00
Senior Draftsman 17.00
Draftsman 13.75
Junior Draftsman 9.00
2 man survey party & equipment 34.00
3 man survey party & equipment 44.00
4 man survey party & equipment 54.00
Other Costs and Rates:
Field supplies (stakes, rods and laths) - cost plus 10%
Printing and Reproduction - cost plus 10%
Electronic Distance Meter - $25.00 per day
Upon acceptance, by the City, of the services performed by the Engineer, the
Engineer will render to the City a statement for the services which shall become
due and payable within thirty (30) days thereafter. The total fee payable hereunder
for engineering work shall not exceed $1,950.
III
It is understood and agreed that the Owner shall have complete control of
th e se r v i ces to be rendered an d that no work shall be done under this contractt
until the Engineer is instructed in writing to proceed with the work .
2-
Page 4 of 6 pages
5.b.Agenda Item No.
IV
Any provision in this contract notwithstanding, it is specifically understood
and agreed that the Engineer shall not authorize or undertake any work pursuant to
this contract , which work would require the payment of any charge, expense or
reimbursement in addition to the charge stipulated in the Rate Schedule, without
having first had and obtained specific written authority therefor .
V
This contract shall not be assignable in whole or in part without the consent
of the Owner.
VI
All payments for services rendered by the Engineer shall become due and
payable within thirty (30) days after submission of a statement by the Engineer.
VII
In connection with all the work outlined or contemplated above, it is agreed
that the Owner or the Engineer may cancel or terminate this contract upon thirty
30) days' written notice to the other, with the provision and understanding that
immediately upon receipt of notice of such cancellation from either party to the
other all work and labor being performed under this contract shall immediately
cease, pending final cancellation at the end of such thirty-day period, and
further provided that the Engineer shall be compensated in accordance with the
terms of this agreement for all work accomplished by him prior to the receipt of
notice of such termination .
Page 5 of 6 pages
3-
5.b.Agenda Item No.
f
IN WITNESS HEREOF, the City of Wichita Falls, Texas, has caused this contract
to be executed by its City Manager and attested by its City Clerk, and Biggs &
Mathews, Inc. , Consulting Engineers, has caused this contract to be executed by
its President and its Secretary, with all such executions being in triplicate,
each of which shall constitute an original , and all of which has been done as of
the date here above first written.
CITY OF WICHITA FALLS
BY
City Manager
ATTEST:
City -Clerk
BIGGS & MATHEWS, INC.
Consulting Engineers
BY I
J. E. Biggs, Sr ., . ., President
Registered Professional Engineer No. 16101
ATTEST:
Dk%
1L.
ec ' tary
4_
Page 6 of 6 pages
Agenda Item No. 5.b.