Res 2944 12/15/1981RESOLUTION NO. ( ON
RESOLUTION APPROVING CHANGE ORDER NO. 2 TO
CONTRACT FOR CONSTRUCTION OF WATER DISTRIBUTION
IMPROVEMENTS FROM FAIRWAY BLVD. TO LAWRENCE ROAD
WHEREAS, the City of Wichita Falls and Crookham & Vessels, Inc. , as
contractor, entered into a contract dated May 26, 1981, for the construction
of Water Distribution Improvements from Fairway Blvd. to Lawrence Road; and,
WHEREAS , the Texas Department of Highways and Public Transportation
has realigned a future "on ramp" to the the proposed Kell Blvd. , and in so
doing, has caused the increasing the 92 L.F. of 30" casing in order to complete
the encasement of our 20" water pipe under the "on ramp"; and,
WHEREAS, after final location of underground utilities in Fairway Blvd.
right of way was determined, it was found that by adding 27 L.F. of boring
for 30" casing at that location, we can install the 20" main without having dis-
turbed the existing underground utilities; and,
WHEREAS , the Engineer has submitted Change Order No. 2 which will
increase the contract amount by $4,652. 30.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF
THE CITY OF WICHITA FALLS, TEXAS, THAT:
Change Order No. 2 to the contract dated May 26, 1981, with Crookham
Vessels, Inc. , is hereby approved and the City Manager is authorized to
execute the same for the City of Wichita Falls.
PASSED AND APPROVED this the 15th day of December, 1981.
JJ
MAYOR
ATTEST:
City Clerk