Res 2874 10/20/1981RESOLUTION NO. ck517$ RESOLUTION APPROVING AND AUTHORIZING CITY MANAGER TO EXECUTE CONTRACT FOR CLEANING AND CLEARING HOLLIDAY CREEK. WHEREAS, the City desires to contract with a contractor to work on a day to day basis in clearing and cleaning the Holliday Creek channel; and, WHEREAS, quotations have been received from two private contractors in this area having the type and size equipment needed for such work, and the low quotation was received from the Zack Burkett Company, who quoted a price of $85 per hour for a one cubic yard dragline and $45 per hour for a dozer to be used in clearing working area for the dragline and leveling the debris taken from the channel. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: There is hereby approved a contract with Zack Burkett Company whereby such contractor will do clearing and cleaning work on the Holliday Creek channel, for which the contractor will be paid $85 per hour for a one cubic yard dragline and 45 per hour for a dozer, but the total consideration paid for first week' s work shall not exceed $4 , 000. Thereafter, if the amount and quality of the work accomplished is determined to be satisfactory by the Public Works Department, the contractor shall be authorized to continue such work on a day to day basis at the above hourly rates. After the first week, the City, acting through the Public Works Department, shall have the right to stop the work and cancel the contract at the end of any day. The maximum amount which shall be paid to the contractor under this contract shall be $36 , 000. The City Manager is hereby authorized to execute such a contract with Zack Burkett Company. PASSED AND APPROVED this the 20th day of October, 1981. D A Y O R ATTEST: City Clerk 2- This contract , made and entered into this the 20th day of October, 1981, by and between the City of Wichita Falls, Texas, hereinafter called "City" , and- Zack Burkett Company, hereinafter called "Con- tractor" , WITNESSETH: For and in consideration of the mutual covenants herein contained, the parties hereto do hereby agree as follows: 1. Contractor shall perform clearing and cleanup work on Holliday Creek in Wichita Falls at the locations designated by City. 2 . City shall pay Contractor at the rate of 85 per hour for each hour, or fraction thereof, that the American 4120 dragline actually performs work on this project. City shall pay Contractor at the rate of 45 per hour for each hour, or fraction thereof , that the Cat D-5 dozer (or equal) is used on this project, such time to be computed on a portal-to-portal basis. 3. This contract shall have a minimum term of one week, and the total consideration paid by City to Contractor for such first week shall not exceed the sum of $4 ,000. There- after, if the amount and quality of the work accomplished is determined to be satisfactory by the Public Works Department, the work shall continue on a day-to-day basis at the above hourly rates; provided, however, the maximum amount which shall be paid by the City to Contractor under this contract shall be the sum of $36 , 000. 4 4 . Contractor shall not be required to haul off the cleared debris. It will be knocked down by Contractor and levelled as directed by City' s Department of Public Works . 5. Billings will be submitted monthly by Contractor to City, and same shall be due and payable in Graham, Young County, Texas on or before the 10th of the following month. 6. Contractor shall furnish to City certificates of insurance showing that it carries a min- imum of public liability insurance of $100, 000 and $300, 000 for bodily injury and $50, 000 for property damage. 7 . Notwithstanding the other provisons contained herein, after the end of the first week, either City or Contractor shall have the right to stop the work and cancel the contract at the end of any day. IN WITNESS WHEREOF, the parties hereto have caused' these presents to be executed as of the day and year — first set out above. CITY OF WICHITA FALLS, TEXAS 3;]:=4144....e,/74-7 c..4C, tuart A. Bach, City Manager ATTEST: 1 7-1L4=c-A, City Clerk ZACK BURKETT COMPANY By: Zack Burkett III, 00 President I