Res 231-82 12/21/1982RESOLUTION NO. , j RESOLUTION APPROVING CHANGE ORDER #1, AND AUTHORIZING THE REPLACEMENT OF UP TO 3888 SQUARE FEET OF FILTER UNDERDRAINS, CONTRACT NO. I , SECTION I, WATER TREATMENT PLANT IMPROVEMENTS WHEREAS, the City of Wichita Falls and Brown-McKee, Inc. as contractor entered into a contract April 14, 1982, wherein said contractor agreed to construct the Water Treatment Plant Improvements; and, WHEREAS, the estimated unit quantity of filter underdrain replace- ment is 3,888 square feet; and, WHEREAS, Change Order #1 for extra work and delay in the amount of $45,661.49 has been submitted. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The filter underdrain replacement of up to 3,888 square feet is authorized, and Change Order #1 in the amount of $45,661.49 is authorized and the City Manager is empowered to execute same for the City of Wichita Falls. PASSED AND APPROVED THIS THE 21ST DAY OF DECEMBER, 1982. M Y 0 R ATTEST : Y12ZW=%'.4.-&-/) CITY CLERK Page 8 of 8 Pages Agenda Item No. v, CHANGE ORDER Order No. 1 Date: December 10, 1982 Agreement Date: NAME OF PROJECT:Water Treatment Plant Improvements Contract No. 1, Section I OWNER: Wichita Falls, Texas CONTRACTOR: Brown McKee, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: Justification: See Attached Change to CONTRACT PRICE: Original CONTRACT PRICE 394,230.50 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 394,230.50 The new CONTRACT PRICE due to this CHANGE ORDER will be (increased) (decreased) by: $ 45,661.49 The new CONTRACT PRICE including this CHANGE ORDER will be $439,891.96 Change to CONTRACT TIME: The CONTRACT TIME will be (increased) (decreased) by 30 calendar days The date for subst ntial completion 9f all work will_be May 15, 1983 date) Requested by: 2/2-7/8,2, Black & Veatch Recommended by: / " lack hh ac y5-2/8;7 lack & Veatch Accepted by: L. Si . _ r. ' i J rown-McKee, I c. Ordered by: i 4 2 - 3 0- ? 2- City of Wichita Falls, Texas Federal Agency Approval (where applicable) Not applicable WICHITA FALLS, TEXAS) 9070-1, SECTION I ) CHANGE ORDER NO. 1 ) COl-1 BLACK & V E A T C H CONSULTING ENGINEERS KANSAS CITY. MISSOURI DALLAS OFFICE MAILING ADDRESS 5728 LBJ FREEWAY. SUITE 300 POST OFFICE BOX 402004 TEL. (214) 386-0001 DALLAS,TEXAS 75240 Wichita Falls, Texas B&V Project 09070 Water Treatment Plant Improvements B&V File G-1.0 Contract No. 1, Section I December 10, 1982 CHANGE ORDER NO. 1 COST SUMMARY Net Increase in Extra Work Item Contract Price 1. Filter Media. Providing and installing 12 inches of new filter gravel in lieu of reusing existing gravel and providing and installing 4 inches of new coarse filter sand on top of the new gravel filters No. 1 through 9 and 11. 31,682.22 2. Other Extra Work a. Filter Manhole Cover Removal and Replacement. The removal of manhole covers to the center flumes in Filters No. 1,2, and 4 (City personnel will remove covers in Filters No. 2,5, and 6) and the replacement of manhole covers in Filters No. 1 through 6. 1,143.74 b. Experimental Filter Underdrain Flushing and Salvaging. Attempts to flush sand from underdrains in Filters No. 1,4, and 9 and attempts to remove and salvage underdrain blocks in Filter No. 4. 2,418.50 c. Costs Incurred Due to Construction Delay. Costs incurred by the Contractor for equipment rental, field supervision, field overhead, and move-out and in due to construction delay. 10,417.00 Total Increase in Contract Price 45,661.46 WICHITA FALLS, TEXAS) 9070-1, SECTION I ) CHANGE ORDER NO. 1 ) CO1-2 CHANGE ORDER NO. 1 JUSTIFICATION OF EXTRA WORK Extra Work Item 1. Filter Media. To protect the filters from future media upset as encountered in the existing filters and to aid in keeping sand from again reaching the underdrains, it is necessary to replace the existing filter gravel with a thicker layer of new graded gravel. Also, a new layer of coarse sand on top of the gravel is required. The new gravel and sand will form an im- proved support material and barrier for the filter sand above. 2. Other Extra Work a. Filter Manhole Cover Removal and Replacement. After re- moval of the filter media, uneven backwash flow distribution was observed, indicating flow blockages in the underdrains. Access manholes to the filter center flumes were opened to permit a more thorough inspection of the underdrains. Re- placement of the manhole covers will also be required. b. Experimental Filter Underdrain Flushing and Salvaging. A thorough investigation of the underdrain system in Filter No. 4 was required to better determine the extent of sand and grout blockages. Experimental flushing of the under- drains and underdrain block salvage work were attempted to evaluate alternative methods for rehabilitation of the filters. c. Costs Incurred Due to Construction Delay. Upon discovery of the entensive filter underdrain blockages, filter con- struction was delayed until the extent of the problem was fully evaluated, alternative solutions were examined, and a final recommendation made. Although every effort was made to conduct these evaluations as quickly as possible, construction was delayed approximately one month. Costs incurred by the Contractor due to this delay included equipment rental, field supervision, field overhead, and move-out and in expenses. WICHITA FALLS, TEXAS) 9070-1, SECTION I ) CHANGE ORDER NO. 1 ) CO1-3 Filter Gravel. The filter gravel shall be new. Either of the following gradations of new filter gravel may be provided. Total gravel depth in each case shall be 12 inches. Layer._Above Depth of Retained on Passing Filter Bottom Layer in Inches Sieve Size Sieve Size a. Gradation Type A. 1st 3 1/2" 1" 2nd 3 1/4" 1/2" 3rd 3 1/8" 1/4" 4th 3 No. 8 1/8" b. Gradation Type B. 1st 3 5/8" 1" 2nd 3 3/8" 5/8" 3rd 3 3/16" (No. 4) 3/8" 4th 3 No. 8 3/16" (No. 4) All existing filter gravel shall be stockpiled by the Contractor for hauling away from the site by the Owner. New Coarse Filter Sand. The bottom layer of coarse sand shall be new, 4 inches thick, and shall be placed directly over the top layer of gravel. The coarse sand material shall be as specified in Addendum No. 1. Other Filter Sand. The other filter sand to be placed on top of the new coarse sand layer shall be as originally specified except as modified herein. If the Contractor elects to use the existing filter sand for placement above the new coarse sand, the thickness of the coarse sand layer shall be as required to yield a top elevation of the finished coarse sand layer equal to 963.50. All excess existing filter sand shall be stockpiled by the Contractor for hauling away from the site by the Owner. WICHITA FALLS, TEXAS) 9070-1, SECTION I ) CHANGE ORDER NO. 1 ) CO1-4