Res 216-82 11/16/1982RESOLUTION NO. k — f,2-)
RESOLUTION APPROVING CHANGE ORDER NO. 2 TO THE
SOLID WASTE TRANSFER STATION
WHEREAS, the City of Wichita Falls and Hambrick-Craig
Construction Company, as contractor, entered into a contract
dated August 18, 1981, for the construction of the solid waste
transfer station; and,
WHEREAS, Change Order No. 2 in the amount of $2, 099. 00
will decrease the estimated contract price to a final value of
1, 958. 788.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF
ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS, THAT:
Change Order No. 2 to the contract dated August 18, 1981,
with Hambrick-Craig Construction Company, a copy of which Change
Order No. 2 is attached hereto, is hereby approved and the City
Manager is authorized to execute the same for the City of Wichita
Falls.
PASSED AND APPROVED THIS /
1.
1/L, day of / G5ltvvi-X e-,L)1982.
M A Y O R PRO TEM
ATTEST:
A;/9/4. -%
Y
City Clerk
tCS7 ts-+-ar+JSOt1, DID KA M 1 z 0-4& os.c*, i tC Da te
CONTRACT CHANGE ORDER Project No. Wichita Falls Solid
Waste Transfer Station
To (Contractor) Location
Wichita Falls, Texas
Hambrick-Craig General Contractors, Inc.Contract No.
1312 13th Street
Wichita Falls, Texas 76301 Change Order No.
You are hereby requested to comply with the following changes from the contract plans and specifications:
Item Description of changes - quantities, units, Decrease in Increase in
No.unit prices, change in completion schedule, etc. contract price contract price
1) 2) 3) 4)
1 . Delete aluminum stairs in transfer building. Install
galvanized steel stairs in lieu of aluminum stairs. 6,555.00
2. 1Delete force main system for sanitary sewer at load-
out area. Install gravity sytem heading east/north-
east of transfer building per Sheet C-l . 3,600.00
3. Relocate transformer and primary electric service;
service shall be overhead with pole locations as
shown on Sheet E-1 . 929.00
4. Change material and quantity of granular fill be-
hind retaining wall and under all concrete slabs
per Hambrick-Craig letters dated 5/28/82 and 7/14/82. - $4,000.00
5. Revise radius at egress of road A (Station 22+55.67)
each side of road from 50' radius to 35' radius.
See Sheet C-1 . 367.00
6. Delete manhole #1 located at coordinates 9325E ,
manhole is 10.28' in depth. See 10025N
Sheet C-1 .850.00
7. Delete manhole #2 located at coordinates 9835E
Change in contract price due to this Change
Ord70025N
r:
Total decrease XXXXXXXXXXXXX
Total increase XXXXXXXXXXXXXX $
Difference between Col. (3) and (4)
Net (increase) (decrease) contract price
The sum of $ is hereby(added to)(deducted from) the total contract price, and the
total adjusted contract price to date thereby is $
The time provided for completion in the contract is (unchanged)(increased)(decreased) by calendar
days. This document shall become an amendment to the contract and all provisions of the contract will apply
hereto.
Recommended by
I-taq A rchitect/Engineer Date
Accepted by
Contractor Date
Approved by
Owner Date
Cote: Fill out form in quadrtplicate. One for Contractor; one for Field Er.gincer; one for Office; one for Owner)
Page 3 of 6
AaAn - T1-on Nn
A3-1 t + O+1, txraw&N a RKx Alt DS0+1, 114C_Date
November 11 , 1982
CONTRACT CHANGE ORDER Project No. Wichita Falls Solid
Waste Transfer Station
To (Contractor) Location
Wichita Falls, Texas
Hambrick-Craig General Contractors, Inc.Contract No.
1312 13th Street
Wichita Falls, Texas 76301 Change Order No.
You are hereby requested to comply with the following changes from the contract plans and specifications:
Item Description of changes - quantities, units, Decrease in Increase in
No.unit prices, change in completion schedule, etc. contract price contract price
1) 2) 3) 4)
7. manhole if 6.00' in depth. See Sheet C-1 . 750.00
8. Delete 26' of 6" SDR-18 water line located at south-
east corner of transfer station. See Sheet C-1 . 180.00
9. Cast in place headwalls per Texas Highway Department
standards may be installed in lieu of precast he&d-
walls. NO COST CHANGE
10. Relocate roadway lighting poles per HDR letter dated
6/14/82. See Sheet E-1 . NO COST CHANGE
11 . Delete passage locksets at doors 105 and 106. Instal"
privacy type locksets to allow the storage area- to
be locked. 102.00
12. Install MCC on new concrete landing, increase wall
heighth off storage room 16". 952.00
13. Relocate drainage ditch at northeast corner of prop-
erty to allow minimal interference with power pole
down guys. See Sheet C-2 800.00
14. Review concrete fence along Lawrence Road to control
structure visibility. See Sheet C-5. 1 ,849.00
15. Encase existing 18" RCP storm sewer line along
Lawrence Road in concrete at all locations that a
roadway crosses the storm sewer line on site. Encase-
Change in contract price due to this Change Order:
Total decrease XXXXXXXXXXXXX
Total increase XXXXXXXXXXXXXX $
Difference between Col. (3) and (4)
Net (increase) (decrease) contract price
The sum of $ is hereby(added to)(deducted from) the total contract price, and the
total adjusted contract price to date thereby is $
The time provided for completion in the contract is (unchanged)(increased)(decreased) by calendar
days. This document shall become an amendment to the contract and all provisions of the contract will apply
hereto.
Recommended by
1--ot A rchitect/Engineer Date
Accepted by
Contractor Date
Ppp:oved by
Ov.ner Dale
Cote: Fill out form in que_druplicate. One for Contractor; one for Field Er.zineer; one for Office; one for Ov.ner)
Page 4 of 6
A rr n,- .t - T+-nm T.T r.
t33 I- '-r-avJ.-O 4, DOR RAM & R Kai At D104,1, INC. Date
November 9, .1982
CONTRACT CHANGE ORDER Project No.Wi chi to Falls Solid
Waste Transfer Station
To (Contractor) Location
Wichita Falls , Texas
Hambrick-Craig General Contractors, Inc. Contract No.
1312 13th Street
Wichita Falls, Texas 76301 Change Order No.
You are hereby requested to comply with the following changes from the contract plans and specifications:
Item Description of changes - quantities, units, Decrease in Increase in
No.unit prices, change in completion schedule, etc. contract price contract price
1) Z)3) 4)
15. ment to include 9" concrete cover over pipe under
Cont. roadway. ' 429.00
16. Install chainlink swing gate under chainlink fence
at new drainage ditch location at northeast corner
of site. See Detail Sheet Included. 400.00
17. Install 6' reinforced concrete valley gutter in
accordance with city paving details, at entrance
of project site for roadways A & B. 4,500.00
18. Install two (2) 10'x6'x.55" concrete panels with
two (2) 16"x16" columns at the northeast corner of
site, include 20 L. ft. on chainlink fence for
northwest corner of site. 6,100.00
Change in contract price due to this Change Order:
Total decrease 17,231 .00 XXXXXXXXXXXXX
Total increase XXXXXXXXXXXXXX $ 15,132.00
Difference between Col. (3) and (4) 2099.00
Net 16XXXDC4C '.)) (decrease) contract price 2,099.00
The sum of $ 2,099.00 is hereby(XIM XXO(deducted from) the total contract price, and the
total adjusted contract price to date thereby is $ 1 ,958,788.00 .
The time provided for completion in the contract is XA X3)(increased) XXXXXJA by 34 calendar
days. This document shall become an amendment to the contract and all provisions of the contract will apply
hereto.
cc>Recommended by John Pruett It q -
1-M A r. •ct/Engineer Date
Accepted by Hambrick-Crai •f—/6 — S2—
Contractor Date
Approved by Cl ty of Wis.hita__Eall_s,__Tems
Ov.ner Date
Note: Fill out form in c adrep)icate. One for Contractor; one for Field Er.zincer; one for Office; one for Ov:ner)
Page of 6
A ru-i' T t cam
1437 r s-•+0.5.04.1, tklutH.AM 1. 5k.HARouxi, INC_ I)ate ---
ry CONTRACT CHANGE ORDER Project No. Wichita Falls Solid
Waste Transfer Station
To (Contractor) Location
Wichita Falls, Texas
Hambrick-Craig General Contractors, Inc.Contract No.
1312 13th Street
Wichita Falls, Texas 76301 Change Order No.
4
You are hereby requested to comply with the following changes from the contract plans and specifications:
Item Description of changes - quantities, units, Decrease in Increase in
No.unit prices, change in completion schedule, etc. contract price contract price
1) 2)3) 4)
1 . Delete aluminum stairs in transfer building. Install
galvanized steel stairs in lieu of aluminum stairs. 6,555.00
2. ' Delete force main system for sanitary sewer at load-
out area. Install gravity sytem heading east/north-
east of transfer building per Sheet C-1 . 3,600.00
3. Relocate transformer and primary electric service;
service shall be overhead with pole locations as
shown on Sheet E-1 .929.00
4. Change material and quantity of granular fill be-
hind retaining wall and under all concrete slabs
per Hambrick-Craig letters dated 5/28/82 and 7/14/82. $4,000.00
5. Revise radius at egress of road A (Station 22+55.67)
each side of road from 50' radius to 35' radius.
See Sheet C-1 .367.00
6. Delete manhole #1 located at coordinates 9325E ,
manhole is 10.28' in depth. See 10025N
Sheet C-1 . 850.00
7. Delete manhole #2 located at coordinates 9835E
a10025N
Change in contract price due to this Change Order:
Total decrease XXXXXXXXXXXXX
Total increase XXXXXXXXXXXXXX $
Difference between Col. (3) and (4) . I
Net (increase) (decrease) contract price
The sum of $ is hereby(added to)(deducted from) the total contract price, and the
total adjusted contract price to date thereby is $
The time provided for completion in the contract is (unchanged)(increased)(decreased) by calendar
days. This document shall become an amendment to the contract and all provisions of the contract will apply
hereto.
Recommended by__
H..a--i A rchitect/Engineer Date
Accepted by
Contractor Date
Approved by I ii---.. .-- g
Ov.ner Date
Note: Fill out form in yua_dreplicate. One for Conti a ctor; one for Field Er.zineer; one for Office; one for Ov.ner)
CDR DON HAM a R1U4Atn1.011, ! Date
November 11 , 1982
CONTRACT CHANGE ORDER Project No. Wichita Falls Solid
Waste Transfer Station
To (Contractor) Location
Wichita Falls, Texas
Hambrick-Craig General Contractors , Inc.
Contract No.
1312 13th Street
Wichita Falls, Texas 76301 Change Order No.
You are hereby requested to comply with the following changes from the contract plans and specifications:
Item Description of changes - quantities, units, Decrease in Increase in
No.unit prices, change in completion schedule, etc. contract price contract price
1) 2)3) 4)
7. manhole if 6.00' in depth. See Sheet C-l . 750.00
8. Delete 26' of 6" SDR-18 water line located at south-
east corner of transfer station. See Sheet C-l . 180.00
9. Cast in place headwalls per Texas Highway Department
standards may be installed in lieu of precast heed-
walls.NO COST CHANGE
10. Relocate roadway lighting poles per HDR letter dated
6/14/82. See Sheet E-1 . NO COST CHANGE
11 . Delete passage locksets at doors 105 and 106. Instal'
privacy type locksets to allow the storage area- to
be locked. 102.00
12. Install MCC on new concrete landing, increase wall
heighth off storage room 16" . 952.00
13. Relocate drainage ditch at northeast corner of prop-
erty to allow minimal interference with power pole
down guys. See Sheet C-2 800.00
14. Review concrete fence along Lawrence Road to control
structure visibility. See Sheet C-5. 1 ,849.00
15. Encase existing 18" RCP storm sewer line along
Lawrence Road in concrete at all locations that a
roadway crosses the storm sewer line on site. Encase-
Change in contract price due to this Change Order:
Total decrease XXXXXXXXXXXX);
Total increase XXXXXXXXXXXXXX $
Difference between Col. (3) and (4)
Net (increase) (decrease) contract price
The sum of $ is hereby(added to)(deducted from) the total contract price, and the
total adjusted contract price to date thereby is $
The time provided for completion in the contract is (unchanged)(increased)(decreased) by calendar
days. This document shall become an amendment to the contract and all provisions of the contract will apply
hereto.
Recommended by
t-c A rchitect/Engineer Date
Accepted by
Contractor Date
Approved by
Ov.ner Dale
Note: Fill out form in Guadruplic_te. One for Contractor; one for Ficid Engineer; one for Office; one for Ov.ner)
i. t-iT3 Virrr+vOSUN, DUR HAM A It K31 A It n1.044, 110-4C. Date
November 9, ,1982
CONTRACT CHANGE ORDER Project No.WiChita Falls Solid
Waste Transfer Station
To (Contractor) Location
Wichita Falls, Texas
Hambrick-Craig General Contractors, Inc. Contract No.
1312 13th Street
Wichita Falls, Texas 76301 Change Order Tlo.
You are hereby requested to comply with the following changes from the contract plans and specifications:
Item Description of changes - quantities, units, Decrease in Increase in
J!
I
No.unit prices, change in completion schedule, etc. contract price contract price
1) 2)3) 4)
15. ment to include 9" concrete cover over pipe under
Cont. roadway. 429.00
16. lInstall chainlink swing gate under chainlink fence
at new drainage ditch location at northeast corner
of site. See Detail Sheet Included. 400.00
17. Install 6' reinforced concrete valley gutter in
accordance with city paving details, at entrance
of project site for roadways A & B. 4,500.00
f
18. Install two (2) 10'x6'x.55" concrete panels with
two (2) 16"x16" columns at the northeast corner of
site, include 20 L. ft. on chainlink fence for
northwest corner of site. 6,100.00
Change in contract price due to this Change Order:
Total decrease 17,231.00 XXXXXXXXXXXX)
Total increase xXXXXXXXXX_XXXX $ 15,132.00
Difference between Col. (3) and (4) _ 2,099.00
Net 106.XxXA- (decrease) contract price 2,099.00
The sum of $ 2,099.00 is hereby(XXOLV0 (deducted from) the total contract price, and the
total adjusted contract price to date thereby is $ 1 ,958 788.Q0
The time provided for completion in the contract is 4,XXX}X-(r4XX1)(increased)(KIXXXXXXd4 by 34 calendar
days. This document shall become an amendment to the contract and all provisions of the contract will apply
hereto.
Z
Recommended by__ John Pruett I "q ' e Z.
t- A r •ct/f'
ngincernn
Date
Accepted by Hambrick_-Cram / _ dJ.(aZ f--- 23 —BZ-- —
Contractor Date
C
Approved by ity_Qf__Nichita_Fall s,--Tex&s- — g
Ov.ner Date
Note: Fill out form in c.;adrup)icate. One for Contractor; one for Field F_r.Lineer; one for Office; one for Ov:ner)