Res 127-82 8/3/1982r . RESOLUTION NO. ax_rl p og RESOLUTION APPROVING CHANGE ORDERS NO. 1 AND NO. 2 TO THE CONTRACT WITH WALLACE & RAUB CONSTRUCTION COMPANY FOR CONSTRUCTION OF HAMILTON PARK TENNIS CENTER PRO SHOP. WHEREAS, the City of Wichita Falls and Wallace & Raub Construction Company entered into a contract dated April 9 , 1982 , whereby the contractor agreed to construct a Hamilton Park Tennis Center Pro Shop; and, WHEREAS , it is deemed advisable to make two Change Orders to such contract, one to add a backwater valve to the sewer line for 326. 00, and the other to raise the entry sidewalk and entry door for $464 .20; also, eight working days will be added to the contract for time lost during the flooding in May. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS , THAT: Change Orders No. 1 and No. 2 to such contract, copies of which are attached hereto, are hereby approved, and the City Manager is authorized to execute the same for the City of Wichita Falls. PASSED AND APPROVED this the third day of August, 1982 . 400°." 1" Y 0 R ATTEST: City C erk CHANGE t)wNtR C-1 ARCHITECT ORDER CONTRACTOR IA DOCUMENT G701 OTHER PROJECT:A Tennis Building for the CHANGE ORDER NUMBER: One (1) name, address) Hamilton Park Tennis Center Wichita Falls, Texas TO (Contractor) P I ARCHITECT'S PROJECT NO: 81462 CONTRACT FOR: General Construction. Wallace & Raub Construction Co. 5007 Joyce Lane Wichita Falls, Texas 76302 j CONTRACT DATE: 9 April 1982 You are directed to make the following changes in this Contract: 1. Install a Tyler back water valve with clean outs on each side of valve and a valve box for valve for the sum of 326.00. 2. Extension of time 8 days. The original Contact Sum was . , . . . . . . . . . . . . . . $ 101,675 . Net change by previous Change Orders 0- . The Contract Sum prior to this Change Order was 101,675 . ' The Contract Sum will be (increased) r' 4c`f+ic>xa?iS by this Change Order . . $ 326 . C The new Contract Sum including this Change Order will he 102,001 • The Contract Time will be (increased) Wf}'ea }( g}iM eight ( -8- ) Days. The Date of Completion as of the date of this Change Order therefore is 27 September 1982 HARPER PERKINS ARCHITECTS WALLACE & RAUB CONSTRUCTION THE CITY OF WICHITA FALLS ARCI-II TECT CONTRACTOR OWNER 4724 Old-_-Jacksboro_ Hwy. 5007 Joyce T,ana P n._Box.1431 ------ - Address Address Address Wich•lls, .-x. 6302 Wichita Falls, Texas 7630.' Wichita Falls, Texas 76302 BY BY R h :. Per ins AIA Bobby lace, Partner Stuart Bach, City Manager DATE 17 June 1982 DATE 17 .une 1982 DATE June 1982 AIA DOCUMENT G701 • CHANGE ORDER • APRII 1970 EDITION • AIAOO • © 1970 • THE ONE PAGE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW SflRK AVE., NW, WASHINGTON, D.C. 20006 WALLACE 67„ IZ.:\U13 CONSTRUCTION ( ;O. CommercH Indict! 11 B,1)1)., Wallace Thephone (81 \ 500i, CT 1,,v ce Lane lAnny Rauh 3149 Widuta Fails, inxas 7 66-1064 0 July 1932 1iarper-Ferk,Ins 472-4 J Thorc A terirr1.3 Lhe ilton Park T111115 Jent.er jubj Froposal i1u '3 1.0. A3 per your requ-si, for a cost caLimabe for a new- calve For the e,re Urtn, r(4.o32 Lii Sub-e r 11111) ri;7: Le an cuLo 130 caLeIial.3 4.44 ba.H3r 150.00 310.46 Uh PrGflt_ 15,52 FoLal cost 13 Dbby 'lace 1.41 Y, e WALLACE & RAUB CONSTRUCTION CO. commercial — Industrial — Metal Buildings Robby Wallace Telephone (81 71 723-5000 5007 Joyce Lane Johnny Rauh766-3l=µ) Wichita Falls, Texas 76302 766.4064 28 May 1982 Harper-Perkius Architects 4724 Old Jacksboro Highway Wichita Falls, Texas Ref: A tennis building for the Hamilton Park Tennis Center Subj: Possible time extension for bad weather Due to the recent rain and flooding, ,/e 'wish to record the following dates as time lost nays should a time extension be required at the n.i of the contra,:t: Ma:; 1j, !4, J. •17, 18, l9, 24, 25, and 26 G,,,-r 4 s4-i T ti//04!/..;t4e._. boL/'dallace co "A,,\ le. c7 lays o L owNII.R LiCHANGEAR( 1 it 1 I.( -t Li ORDER COSH RAC1 O1,' 11 EIEE1) VA DOCUMENT C701 OTIIER PROJECT: A Tennis Building for the CHANGE ORDER NUMBER: Two (2) lame, address) Hamilton Park Tennis Center Wichita Falls, Texas TO (Contractor) r 1 ARCHITECT'S PROJECT NO: 81462 Wallace & Raub Construction Co. CONTRACT FOR: General Construction 5007 Joyce Lane Wichita Falls, Texas 76302 L 1 CONTRACT DATE: 9 April 1982 You are directed to make the following changes in this Contract: 1. Raise door head at Entry 101: 35.20 2. Four 6" sidewalk at Entry 101: 429.00 TOTAL ADD: 464.20 Attachments: Copy of Proposal #2, dated 16 July 1982. Letter from Wallace and Raub Construction, dated 19 July 1982. The original ( rxrtract Sum was . . . . . . 101,675 . Net change by previous Change Orders . . . 326 . Ui The Contract Sum prior to this Change Order was 102,001 . C' The Contract Sum will he (increased) kit€Zd€>'i 'c 1“ >ZiK0i,f by this Change Order . . $ 464 . . The new Contract Sum including this Change Order will he 102,465 . 2' The Contract Time will he ?iriPf }ski K (unchanged) by 0- ) Days. The Date of Completion as of the date of this Change Order therefore is 27 September 1982. HARPER PERKINS ARCHITECTS, INC. WALLACE & RAUB CONSTRUCTION THE CITY OF WICHITA FALLS ARCEIll Ft T CON ERA(JOR OWNER 4724 Old Jacksboro Highway 5007 Joyce Lane P.O. Box 1431 Address Address Address Wichi Falls, Texas 76302 Wichita Falls, Texas 76302 Wichita Falls, Texas 76307 BY/ ._ R1' J"c G` G ( ,r.-t!/ B Ralph B. Perkins AIA Bobby Wallace, Partner Stuart Bach, City Managc - DATE 23 July 1982 DATE July 1982 DATE July 1982 MA DOCUMENT G701 • (HANGE ORDER • APRIL I070 EDITION • AIA® • 1070 • THE ONE PAGE AMERICAN INSTIIUIE OF ARCHITECTS, 1715 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 W PROPOSAL OWNER A RCHITECT REQUEST CONTRACTOR U FIELD jA/A DOCUMENT G709 OTHER PROJECT: A Tennis Building for the PROPOSAL REQUEST NO: Two (2) name, address)Hamilton Park Tennis Center Wichita Falls, Texas OWNER:The City of Wichita Falls DATE: 16 July 1982WichitaFalls, Texas TO: (Contractor) 7 ARCHITECT'S PROJECT NO: 81462 Wallace & Raub Construction Co. 5007 Joyce Lane CONTRACT FOR: General Construction Wichita Falls, Texas 76302 CONTRACT DATED: 9 April 1982 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifica- tions to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WWII TIIE WORK DESCRIBED HEREIN. Description: (Written description of the Work) 1. Raise the elevation of Entry 101 and the corresponding entry sidewalk of a total of 6". 2. Raise the doorhead at Door 1-A a corresponding 6". Attachments: (List attached documents that support description) ARCHITECT: HARPER PERKINS ARCHITECTS BY Larry J. Tanner P. E. , AIA MA DOCUMENT G709 • PROPOSAL REQUEST • APRIL 1970 EDITION • AIM), • ©197)) • THE ONE PAGE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON,. D.C. 20006 WALLACE & RAUB CONSTRUCTION CO. Commercial Industrial -- lctal Buildings bobby Wallace Telephone (817) 723-5006 5007 Joyce Lane Johnny Raub766-3149 Wichita Falls, Texas 76302 760,40o4 19 Duly 1982 Harper—Perkins Architect's 4724 01 Jack.sboro lign•.ray ichita Falls, Texas Ref: A tennis building for the Hamilton Park Tennis Center Sub j: Proposal itequest No. 2 As per your request for costs, ,.re propose the following: door head at entry 101 is Lorials 4.00 Labor 20.00 32 UU 1O) 0U & Profit 3.:z0 Total cost 0 Pour 6" sid(1•..alk at entry 101 1.1a t;:ri al s 140.00 Labor 2)0.00 390.UL 10, OU&'Profit 3`1.00 Total cost 44z9.(A) Total proposal 464.20 Bobby allace