Res 045-82 3/2/1982RESOLUTION NO. 44) RESOLUTION APPROVING CHANGE ORDER NO. 1 TO THE SOLID WASTE TRANSFER STATION. WHEREAS, the City of Wichita Falls and Hambrick-Craig Construction Company, as contractor, entered into a contract dated August 18 , 1981 , for the construction of the solid waste transfer station; and, WHEREAS, Change Order No. 1 in the amount of $10 ,987 . 00 will increase the estimated contract price to a final value of 1,960 ,887 . 00 . NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF WICHITA FALLS, TEXAS , THAT: Change Order No. 1 to the contract dated August 18 , 1981 , with Hambrick-Craig Construction Company, a copy of which Change Order No. 1 is attached hereto , is hereby approved and the City Manager is authorized to execute the same for the City of Wichita Falls. PASSED AND APPROVED THIS 2nd day of March 1982 . 712 1.4b;1(4..t.e.-1 MAYOR ATTEST: City Clerk Page 12 of 12 pages Agenda Item No. 11.a. J CONTRACT CHANGE ORDER ORDER NO. 1 DATE: 3/2/82 CONTRACT FOR: Solid Waste Transfer Station OWNER: City of Wichita Falls TO: Hambrick-Craig General Contractors , Inc. Wichita Falls , Texas You are hereby requested to comply with the following changes from the contract plans and specifications . DESCRIPTION OF CHANGE AMOUNT A. Change in contract value due to escalated prices as originally presented on 12/15/81. 1. Earthwork 2 ,600. 00 2. Masonry 600 . 00 3. Roofing and Sheetmetal 4 , 200 . 00 4. Lath and Plaster 800 . 00 5. Rolling Steel Doors 1,200. 00 6. Interior Finish Work 2,300 . 00 7 . Asphalt Paving 5, 400 . 00 8. Chain Link Fencing 1,800 . 00 9. Electrical 4 ,800. 00 10 . Plumbing and H.V.A.C.8 ,600 . 00 11. Concrete 5 ,365. 00 12. Structural Steel 12 ,930. 00 13. Reinforcing Steel 2 , 575 . 00 14. Glass and Glazing 480 . 00 15 . Aluminum Facia Panels 1, 700. 00 TOTAL INCREASE) $55 ,350. 00 B. Change in contract value due to a decrease in quantities and specifications as recommended by Henningson, Durham and Richardson Architect and Engineers Inc. 1. Non-insulated Span-Rib Panels . Panels by Molenco 21 , 000 . 00 2. Use non-insulated rolling steel doors in lieu of mechanically operated. 4 ,000 . 00 3. Delete the entire vapor barrier underlay for roof, and change the roofing insulation type & thickness to 3/4" perlite board, & change the roofing specification to mopping on 3-plies fiberglass roofing felts over perlite board with 3-25# moppings Page 2 of 12 pages Agenda Item No. 11.a. each layer of type IV Asphalt , flood surface with 60# Type IV Asphalt & 2" crushed light-colored limestone at 500#/sqr. The above roofing spec. is taken from Johns-Manville Spec. #3GIG which is bondable. 8 , 500 . 00 4 . Use EMT in lieu of rigid conduit for electrical work. Use only above 10 ft. above finish floor on tipping floor and lower floor level of Transfer Station. 1 , 670 . 00 5. Use PVC pipe in lieu of cast iron pipe , for all sewer and roof drains . $ 1 ,800. 00 6. Change all 54 skylights required from Plasteco #208-5858-Clear Dome- Anodized Aluminum 9" high insulated curbs to Plasteco #204-5858-Clear Dome-Mill Finish Aluminum 4" high Non-Insulated curbs . 3 ,325 . 00 7. Delete bottom rail of cyclone fencing. 2 ,844 . 00 8. Omit three water meters from contract. Required water meters to be furnished and installed by the City of Wichita Falls . 6 , 224 . 00 TOTAL DECREASE) 49 ,363. 00 C. Change in contract value due to the labor for the forming, pouring, and finishing of the scale foundation at the sanitary landfill. INCREASE) 5 , 000 . 00. Old Contract Price 1 ,949 , 900 . 00 New Contract Price 1,960 ,887 . 00 JUSTIFICATION: Increase in quantities to cover the cost of escalation and the decrease is an adjustment in specifications. This document will become a supplement to the contract and all provisions will apply hereto. Requested: (Owner) Date) Accepted: (Contractor) Date) Page 3 of 12 pages Agenda Item No. 11.a.