Res 090-83 5/3/1983RESOLUTION NO. 90-83 RESOLUTION APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 4 TO THE CONTRACT WITH HAMBRICK-CRAIG GENERAL CONTRACTORS, INC . FOR CONSTRUCTION OF THE SOLID WASTE TRANSFER STATION. WHEREAS, the City of Wichita Falls and Hambrick-Craig General Contractors, Inc . , as Contractor, entered into a contract dated August 18 , 1981, for the construction of a solid waste transfer station; and, WHEREAS, it is deemed advisable to make certain changes in this contract, deleting finish on certain structural steel, changing weather stripping on certain doors, installing surface bolts on certain doors, and installing bollards to protect exposed three-inch water line, which changes will result in a net decrease of $1, 794 .00 in the contract price, and will increase the time for completion of the contract by twenty-two calendar days . NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: Such Change Order No . 4 , a copy of which is attached hereto, is hereby approved, and the City Manager is authorized to execute the same for the City of Wichita Falls. PASSED AND APPROVED this the 3rd day of May, 1983 . A Y O R ATTEST: A-LPV/04` City Clerk j FOP Fe=`N RINQ-SOH, NJ t It IC}1A 0S.'Jty, INC. Of TIXAS Date 1 April 22. 1922 CONTRACT CHANGE .ORDER i Project \c. 197)0056: To 'Contractor: Location halnoricF:-Craig General Contractors9 Wichita Fall , Texas 1312 13th Street. I contract No. Wichita Falls , Texas 76301 Change Orcer tic. G You are hereby requested to comply with the :011ov:trig chanties from the contract plans and specifications: Item Description of changes - quantities, units, Decrease in Increase in No. unit prices, change in completion schedule, etc. contract price contract price 1) ' 2) 3) 4) 1. Delete SSPC-6 finish on structural steel beams W14 x 43, W24 x 36, and angle bracing 3" x an x 1/4" above elevation 1028' . This finish required under specification section 05120-11 and as amended by Addendum Number 1. Refer to Sheet S-6 of drawings for detail's.2,000.00 2. Furnish and install surface bolts on double doors as per Hambrick-Craig letter dated March 2, 1983.206.00 Change in contract price due to this Change Order: Total decrease I S 2 ,000.00 I XxxxXxxxxYYxx Total increase I XXXXXXXXXXXXXX I S 20b.UU Difference between Col. (3) and (4) S 1 ,794.00 I S Net (ii X-XX. J (decrease) contract price S 1 ,794.0u I $ I I The sum of 51 ,794.00 is hereby(X3. c' ))(deducted from) the total contract price, and the total adjusted contract price to date thereby is $ 1 ,999,186 .00 . The timg provided for completion in the contract is X:).:1ZA"..:KZA)(increased)(bXXreWeS) by 22 calendar days. This do u,:. nt shall becptre•an amendment o h cortrac' and an...provisions of the contract will apply hereto Lon tract comp I eti on is extended to NayI61983. Recommended by John Pruett 1111111111"k j- " opt A r chite t/=nr:. eer Date Accepted by Hambrick-Craig ,F3 Contractor eb,..42%...v . 01. 44.4„........... ..., Date Approved by City of Wichita Falls, Texas 3 --, — # 3 Owne r Date Note: Fill out form in cuadriplicate. One for Contractor: one ic,r Field r