Res 089-93 5/3/1983RESOLUTION NO. SY- 13
RESOLUTION AUTHORIZING THE CITY MANAGER
TO SIGN A CONTRACT WITH JOE M. NALL AND
ASSOCIATES, INC. FOR A WATER RATE STUDY
FOR RAW AND TREATED WATER SOLD TO CUSTOMER
CITIES
WHEREAS, the last rate increase for water services provided
to the raw water, treated water and transmitted treated water customers
of the City (excluding the distribution customers within the City) was
in late 1981; and,
WHEREAS, since that time, operating and production costs have
increased and the City of Wichita Falls has borrowed money through a bond
issue to make improvements to the water system; and,
WHEREAS, the City desires to hire the firm of Joe M. Nall and
Associates, Inc. , to conduct a water rate study to determine the service
cost and the necessary rates that must be charged to recover the cost.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF WICHITA FALLS, TEXAS, THAT:
The City Manager is authorized to sign a contract with Joe M.
Nall and Associates for the said rate study. The amount to be paid to the
Consulting Engineer shall not exceed $10,000.
PASSED AND APPROVED THIS THE 3RD DAY OF MAY, 1983.
MA OR
ATTEST:
y y
CITY LERK
Page 3 of 3 Pages
Agenda Item No.