Loading...
Res 044-85 4/2/1985RESOLUTION NO. 4z/1-is( RESOLUTION TO APPROVE ENGINEERING CONTRACT FOR CONVERSION OF 1925 TRICKLING FILTER TO SLUDGE BEDS WHEREAS, the City of Wichita Falls desires to add additional sludge drying space to the River Road Waste Water Treatment Facility; WHEREAS, it has been determined in a preliminary engineering analysis that the Fixed Nozzle Trickling Filter System for the 1925 Imhoff Tank can be converted to sludge drying beds; WHEREAS, the Consulting Engineering Firm of Corlett, Probst, and Boyd, has submitted a proposal for the engineering design for the conversion; and WHEREAS, the Council has reviewed the said proposal. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The proposed agreement for engineering services with the firm of Corlett, Probst, and Boyd is accepted in an amount not to exceed 19,250.00 and the City Manager is authorized to execute said agreement for the City of Wichita Falls. PASSED AND APPROVED THIS THE 2ND DAY OF APRIL, 1985. 4011. 90/1 Y O R ATTEST: CITY CLERK