Loading...
Res 021-85 2/5/1985RESOLUTION NO. RESOLUTION APPROVING CHANGE ORDER NUMBER ONE AND ACCEPTING CONSTRUCTION OF MAPLEWOOD BOULEVARD/ MIDWESTERN PARKWAY MEDIAN IRRIGATION SYSTEM BY LLOYD J. TAYLOR, III, d /b /a TAYLOR AND COMPANY. WHEREAS, the City of Wichita Falls and Lloyd J. Taylor, III, d /b /a Taylor and Company, entered into a contract dated November 16, 1984, for the construction of Maplewood Boulevard /Midwestern Parkway median irrigation system; and, WHEREAS, during the course of such work, it was advisable to make certain changes in the work as set out in Change Order No. 1, a copy of which is attached hereto, which increases the contract price by $1,285.28; and, WHEREAS, the construction of such project has been completed in accordance with the plans and specifications; and, WHEREAS, the total contract price, including the change order, is $50,885.28, of which $47,120.00 has been paid, leaving a balance due of $3,765.28. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The construction of the Maplewood Boulevard /Midwestern Parkway median irrigation system is hereby accepted, and the City Manager is authorized to pay to the contractor the balance due as set out above. PASSED AND APPROVED this the 5th day of February, 1985. ATTEST: i C'ty `Clerk CHANGE ORDER N[1MBER 1 MAPLEWOOD BLVD. /MIDWESTERN PKWY. -- MEDIAN IRRIGATION 12 -19 -84 DELETE ADD 285.00 (3) 12" Richdel @ $95.00 $141.00 (2) 1" Richdel @ $70.50 Pipe to accommodate new meter location in area #3: $215.00 (250') 3/4" @ .86� D $123.60 (240') 1" @ .89� D $16.74 (18 ") 1.4" @ . 93� D (240') 1- @ .93(,, A $223.20 (268') 12 @ .97� A $259.96 Pipe to accommodate new meter location in area 1: $164.65 ( 185`) 1" @ .89( D $206.40 (240`) 3/4" @ .86(-, D 25 1 9�, A $228.73 (171 ' ) 3bV; 3 .8r A -$147.06 Eliminate one (1) head on Midwestern Pkwy, in area # 1 to avoid spray into street, at Jacksboro as shown on Sheet 5, Revised 12 -19 -84 $25.00 (1) Toro 570P Sprinkler Head $9.46 (11) 3/4" PVC Pipe @ .86� Eliminate four (4) heads in area 2 to avoid spray into streets at Travis as shown on Sheet 5, Revised 12- 19 -84: $140.00 (4) Hunter Sprinkler Heads @ $35.00 $42.00 (49') 3/4" PVC Pipe @ .86o, Eliminate one (1) head in area 2 to avoid spray into street, at Bluff as shown on Sheet 5 , Revised 12- 19 --84: $35.00 (1) Hunter Sprinkler Head @ $35.00 $22.36 (26`) 3/4" PVC Pipe @ .86(,, Change Remaining head on North Side of Area 2 to avoid spray into streets at Travis from Hunter A3 to Hunter A2 as shown on Sheet 5, Revised 12- 19 -84. NC NC = $1516.35 1" Pipe added on Midwestern to accommodate drip system: . Jacksboro /Bluff (410') 1" @ .89o, $364.90 . Bluff /Travis (4101) 1" @ .89q, $364.90 . Travis /Armory (650') 1" @ .89�. $578.50 . Armory /Expressway (570') 1" @ .89C $507.30 SUBTOTALS x-$2674.55 Page 3 of 5 Pages Agenda Item No. -- $1516.35 - $1516.35 TOTAL: $1285.28 Sub totals from previous page (2) 12" Weathermatic electirc valves list price $105.90 less 40% ($42.36) _ $63.54 x-$2674.55 x-$127.08 -x$2801.62 Page 4 of 5 pages Agenda Item No.