Loading...
Res 184-86 11/15/1986HYDROPILLAR OPTION RESOLUTION NO. /I'/ / ' RESOLUTION TO AWARD BID FOR CONSTRUCTION OF ELEVATED STORAGE TANKS WHEREAS, the City of Wichita Falls has advertised for bids for the construction and relocation of two 1MG elevated water storage tanks; WHEREAS, it is found that the lowest responsible bidder for the relocation of an existing 1MG tank to the Reilly Road site is Abhe & Svoboda, Prior Lake, Minnesota, who bid a lump sum price of $317,285.00; and, WHEREAS, it is found that the lowest responsible bidder for the construction of a 1MG hydropillar elevated tank at the 287 site is Hydrostorage, Inc. , Houston, Texas, who bid a lump sum price of $666,800.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: Such lump sum bid of Abhe & Svoboda for $317,285.00 to relocate the existing elevated tank, and such lump sum bid of Hydrostorage, Inc. for $666,800.00 to build a new hydropillar elevated tank are hereby accepted, and the City Manager is authorized to execute a contract for the City with the said contractors for the construction of the projects as stated. PASSED AND APPROVED THIS THE 18TH DAY OF NOVEMBER, 1986. Artyfi. MAYOR ATTEST: CITY LERK