Loading...
Res 121-86 8/19/1986RESOLUTION NO. /71/-16 RESOLUTION TO APPROVE ENGINEERING CONTRACT WITH SOUTHWESTERN LABORATORIES FOR LAKE KICKAPOO DAM STABILIZATION STUDY WHEREAS, the back side of the dam at Lake Kickapoo falls away in selected places during long rain periods; WHEREAS, the sloughing of the dam must be repaired using City personnel and equipment each time it occurs; WHEREAS, there are potential long term ramifications in addition to the short term problems created by the sloughing action; WHEREAS, the City of Wichita Falls is concerned to preserve the primary source of drinking water at Lake Kickapoo in a good, safe state of maintenance; WHEREAS, the City desires to conduct a study to determine remedial approaches for repair of the stabilization problem; and, WHEREAS, this Council has considered a proposed contract with the geotechnical engineering firm of Southwestern Laboratories, Dallas, Texas, for the conduct of the study. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The engineering consulting contract with Southwestern Laboratories for the Lake Kickapoo dam stabilization study is hereby approved, and the maximum fee for the indicated services shall be $21 ,132.00. The City Manager is authorized to execute the contract for the City of Wichita Falls. PASSED AND APPROVED THIS THE 19TH DAY OF 'UGUST, 1986. MAYOR ATTEST: CIT CLERK