Loading...
Res 139-87 8/18/1987RESOLUTION NO. /j f RESOLUTION TO APPROVE ENGINEERING FEE AND AMEND ENGINEERING CONTRACT WITH THE FIRM OF CORLETT, PROBST AND BOYD FOR A SLUDGE DEWATERING SYSTEM AND RENOVATION OF SELECTED EXISTING PLANT FACILITIES WHEREAS, the City of Wichita Falls has a contract with the engineering firm of Corlett, Probst and Boyd for certain engineering work at the River Road Wastewater Treatment Plant; WHEREAS, the original contract dated May 5, 1987, did not specify the fees to be paid for Phase II and Phase III ; WHEREAS, one portion of the work to be designed and constructed has been identified, and the estimated cost of construction for a sludge dewatering system is $1 ,179,000; WHEREAS, the engineering firm has stated a maximum fee for Phases II and III for the sludge dewatering system to be $82,530; and, WHEREAS, under the original contract 80% of the maximum fee is paid for design and 20% is paid for construction. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The contract dated May 5, 1987 between the City of Wichita Falls and the engineering firm of Corlett, Probst and Boyd is amended in Exhibit 1 to show a maximum fee for Phase II to be $66,024 and for Phase III to be $16,506. All other provisions of the May 5, 1987 contract remain unchanged. IPIll PASSED AND APPROVED THIS THE 18TH DAY OF A, i 1987. ice, MAYOR ATTEST: 9 ii 2I / LryZ! 4 C CL '