Loading...
Res 075-87 5/5/1987RESOLUTION NO. 75}—t0 RESOLUTION TO APPROVE CONTRACT WITH THE FIRM OF BIGGS & MATHEWS, INC. , CONSULTING ENGINEERS FOR THE DESIGN OF TWO WASTEWATER LIFT STATIONS WHEREAS, the existing sewage lift stations located at 2922 Seymour Highway and 201 Sunset Lane are overloaded and obsolete; and, WHEREAS, new replacement stations are required; and, WHEREAS, the firm of Biggs & Mathews, Inc. proposes to furnish the design and construction contract in accordance with the attached contract. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The contract between the City of Wichita Falls and the engineering firm of Biggs & Mathews, Inc. is approved at a fee not to exceed $18,000.00 and the City Manager is authorized to execute the contract. PASSED AND APPROVED THIS THE 5TH DAY 0' MAY, 1937. I M A Y O ATTEST: A_(/),z4t,I . 76-n-lit CITY LERK