Loading...
Res 022-87 2/3/1987RESOLUTION NO. 4J-00 RESOLUTION TO APPROVE CHANGE ORDER 1 FOR CONTRACT WITH HYDROSTORAGE, INCORPORATED TO CONSTRUCT A 1 MG ELEVATED WATER TANK WHEREAS, the City of Wichita Falls contracted with Hydrostorage, Incorporated for the construction of a 1 MG elevated water tank; WHEREAS, the inlet/outlet pipe was bid as a 16-inch steel pipe; WHEREAS, the City has changed the size of the transmission line to the tank from 16-inch to 24-inch and now desires to change the inlet/ outlet pipe of the tank from 16-inch to 24-inch; and WHEREAS, the Council has examined a proposed Change Order #1 for this purpose. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: Change Order #1 to Hydrostorage, Incorporated contract to change the size of the inlet/outlet pipe from 16-inch to 24-inch is hereby approved in the amount of $8,150.00, increasing the total contract price o $674,950.00. PASSED AND APPROVED THIS THE 3RD DAY eF EBRUARY, 1987 1 MLA, MAY ; R ATTEST: i ', Ven,z7Z..42) CIT CLERK i